Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 47 for “"Cost Overrun"”.
-
Why Social Infrastructure Projects Experience Cost Overrun
… projects worldwide suffer from frequent cases of cost overrun. As a critical challenge in the infrastructure industry, cost overrun remains, however an under-researched academic topic. Previous studies in this field have mainly adopted quantitative methodological research methods and analyzed data …
-
Transportation infrastructure project cost overrun risk analysis : risk factor analysis models
… to propose several useful analytical models for cost overrun risk analysis in transportation infrastructure investments. Probability models and regression models are proposed and partially (due to data insufficiency) applied using the VIHP (Vancouver Island Highway Project) data. The VIHP case …
-
An exploratory case study of risk and opportunity management on CRL1 Project, UK: Investigating the major causes of time and cost overrun, and poor quality of work and possible remedies.
… study was to investigate the possible causes of cost and time overrun and poor quality of work on CRL1 project and to identify the potential remedies. Qualitative audio recorded data were collected from a sample of eighty subject matter expert (SME) employees of CRL1 selected using purposive …
-
Towards a risk management framework for Libyan house-building projects
Time and cost overrun problems are commonplace throughout the world in the construction industry. Libyan House-Building Projects (LHBP) experience the same dilemma and often to a greater extent. This is attributed to both unexpected and expected factors in which risk and uncertainty were not …
-
Schedule and Cost Performance Analysis and Prediction in Louisiana DOTD
… in the United States are facing the risk of cost overrun and schedule delays. This is also happening here in the State of Louisiana. When these things happen, it causes cost overrun which can then be passed on to the tax payers and may also cause the state to take on less projects than they …
-
A conceptual cost estimation model for the pre-design stage of road projects in New Zealand : a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy (PhD) in Construction, School of Built Environment, Massey University, Auckland, New Zealand
Cost overruns in construction projects have been a pervasive and challenging issue within the construction industry. Over the years, the researchers explored the causes, effects, and mitigation strategies for the cost overrun issue. However, there has been no major improvement, and projects still …
-
Cost Risk Assessment in Environmental Remediation: Towards a Causal-Chain Approach
… the adaptation of the causal-chain approach to cost risk assessment; (2) a demonstrated use of change order data in understanding project risks; (3) the characterization of cost risks of environmental remediation; (4) the predictive models of cost overrun for environmental remediation.
-
Hydro-electric power planning in the Yukon : a case study of the Aishihik Project
… did begin in April 1973, it was estimated to cost $17 million and take twenty months to complete. The project finally cost $39 million and was not completed for twenty-six months. Information presented in the study consists almost entirely of primary written materials. The documentation …
-
Correlation between Contingency Allowance and Change Orders
… will be included in original contract. Premium cost also will be issued to pay non-value additional works. As a result, additional works, which also refers to change orders, are paid mainly by initial contingency, supplemental agreements and premium cost. This paper mainly aims to compare …
-
A HIERARCHICAL MULTI-STAKEHOLDER PRINCIPAL-AGENT MODEL FOR (ANTI-) CORRUPTION IN PUBLIC INFRASTRUCTURE PROCUREMENT
… phase of infrastructure procurement are studied. Cost overrun is a problem plaguing all the infrastructure projects and using the framework, a model is established to distinguish the unintentional cost overrun due to technical uncertainty and intentional one induced by selfish motivation of …
-
Corps SAM: down selection to one contractor vs. competition
… down selection and whether the program risks of cost overrun, failure to meet schedule, and poor weapon performance can be averted without the use of continuous competition. This thesis concludes that down selection to one contractor provides more benefit to the program than maintaining …
-
Operations Research Model for Competitive Bidding
… reduction in manhours increases the risk of a cost overrun upon job completion. The magnitude of the risk, as well as the final optimized solution, was shown to be a function of the type of contract to be negotiated.
-
Modelling Risk in Highway Infrastructure Investments: Decision-Theoretic, Bayesian, and Factor Analysis Approaches
… to achieve a satisfactory rating for avoiding cost overruns and in fulfilling their role in enhancing the sustainability of cities and regions. Despite challenges, highway infrastructure investment assessments received insufficient research attention in modelling lifecycle cost risk and the …
-
QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE
… measured by safety, schedule, productivity and cost. Data from 97 construction projects completed in the U.S. and Canada between 2001 and 2014 were collected from two data sources. A number of t-tests and regression analyses were conducted in both databases to examine the significance of the …
-
Change order insurance policy (COIP) in the U.S. design and construction industry: Is there any likelihood of acceptance?
… problem in maintaining the efficiency and cost of construction projects. This research study will investigate a new mechanism for dealing with such problems. Accordingly, it will propose sharing the risk of cost overrun as a consequence of change orders, with a third-party insurance …
-
Construction project partnering in Texas' public universities
… and also to deliver a quality product in a cost efficient and timely manner. This research analyzes the impact of the partnering process on the outcome of construction projects in Texasâ public universities. For this study project specific data were obtained from 218 buildings built …
-
Cost-constrained project scheduling with task durations and costs that may increase over time: demonstrated with the U.S. Army future combat systems
… budget constraints, where the duration and cost of each task may increase as the project progresses. Initially, tasks are scheduled without regard to budgets and the project completion time is minimized. Treating the task durations as random variables, we then use simulation to describe the …
-
Geração elétrica e mudanças climáticas: avaliação econômico-financeira de usinas hidrelétricas a fio d’água no Rio Tapajós
… issues, such as the high risk of construction cost overrun. Thus, the present study seeks to analyze the vulnerability of the São Luiz do Tapajós and Jatobá hydroelectric plants, planned for the Amazon basin, in the face of possible effects of climate change. For this, scenarios of flow …
-
Systems Approach to EPC Material Procurement Strategy
… on sites, which eventually leads to schedule and cost overrun. The purpose of this study is to develop a novel Systems Dynamics (SD) decision support model to improve the construction material supply chain performance. The model emphasizes the essence of information sharing, collaboration, and …
Page 1 of 3