Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 776 for “"Cost and Time"”.

  1. Topology Optimization for Cost and Time Minimization in Additive Manufacturing

    … high-performance designs realized on shorter timelines has fostered the need for computational design generation tools such as topology optimization. However, topology optimization has always posed the challenge of generating difficult, if not impossible to manufacture designs. The recent …

    queens Repository record for Topology Optimization for Cost and Time Minimization in Additive Manufacturing (opens in a new tab)

  2. Cost and time effective DSM on mine compressed air systems

    Implementing demand side management (DSM) is expensive and often time consuming. Eskom grants subsidies for DSM projects based on the proposed savings. The subsidy granted is not always adequate to fund all the required control equipment to achieve the desired saving. This study focuses on …

    nwu-za Repository record for Cost and time effective DSM on mine compressed air systems (opens in a new tab)

  3. Exploring strategic motives behind cost and time overruns in oil and gas infrastructure projects

    … most frequently discussed in the regard of cost and time overruns in project management literature are planning failures, such as understated budgets, underrepresented technical complexity, and issues with public approval. Less frequent are discussions of changes in project scope and …

    texas Repository record for Exploring strategic motives behind cost and time overruns in oil and gas infrastructure projects (opens in a new tab)

  4. Simultaneous Topology and Build Orientation Optimization for Minimization of Additive Manufacturing Cost and Time

    The ever-present demand for increased performance in mechanical systems, with reduced cost and manufacturing time, has led to the adoption of computational design tools and innovative manufacturing methods. Among these tools is topology optimization, which typically produces highly complex designs …

    queens Repository record for Simultaneous Topology and Build Orientation Optimization for Minimization of Additive Manufacturing Cost and Time (opens in a new tab)

  5. Cost and Time Analysis of Procedural Sedation versus General Anesthesia in a Pediatric Dentistry Residency Program

    … were to compare dental procedures, associated costs, and time required to provide pediatric dental treatment with procedural sedation (SED) and general anesthesia (GA). Methods: This 2 year retrospective chart review of patients treated at the University of Washington Center for Pediatric …

    washington Repository record for Cost and Time Analysis of Procedural Sedation versus General Anesthesia in a Pediatric Dentistry Residency Program (opens in a new tab)

  6. A simulation approach to track quality, cost and time during the manufacture of metal bonded assemblies

    … firms consists of either (i) making the rework and interim part scrap an integral part of their manufacturing process, or (ii) select a process with a process capability higher than cost Justifiable, or (iii) increasing the process automation. Whereas these efforts are justified, difficulty to …

    manitoba Repository record for A simulation approach to track quality, cost and time during the manufacture of metal bonded assemblies (opens in a new tab)

  7. Multi-Objective Build Orientation and Topology Optimization for Cost and Time Minimization in Fiber Reinforced Additive Manufacturing

    … geometry, via topology optimization (TO), and build orientation, via build orientation optimization (BOO), to maximize structural efficiency. Historically, FRAM research has focused primarily on structural objectives such as compliance minimization, often neglecting non-structural …

    queens Repository record for Multi-Objective Build Orientation and Topology Optimization for Cost and Time Minimization in Fiber Reinforced Additive Manufacturing (opens in a new tab)

  8. Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects

    … the project delivery phase such as bad quality and project delay; which ultimately results in cost overruns. There are two strategies involved with selecting contractors: one is the lowest tender, the other is called best value.Selecting the lowest tender is straightforward; the latter strategy …

    aston Repository record for Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects (opens in a new tab)

  9. Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study

    … by providing ideas on green construction methods and materials. As sustainable building practices become more prominent in the construction industry, General Contractors must remain knowledgeable on current green building standards in order to stay competitive. Two of the most important aspects of …

    gatech Repository record for Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study (opens in a new tab)

  10. Impacts of Cultural and Social Factors on Cost and Time in Management of Engineering, Procurement and Construction Projects: A Case Study

    … infrastructures that align with their cultural and social preferences. Existing healthcare construction project managements often overlook this problem with Indigenous communities, resulting in designs that fail to foster trust, inclusivity, and accessibility. This thesis study was motivated by …

    sask Repository record for Impacts of Cultural and Social Factors on Cost and Time in Management of Engineering, Procurement and Construction Projects: A Case Study (opens in a new tab)

  11. A project control framework for the Libyan construction industry.

    Time and cost overruns are one of the biggest issues facing the construction industry and affecting delivery in terms of time, cost and quality. Libyan construction projects experience these problems, often to a greater extent than most others. This can be attributed to both unexpected and expected …

    sheffield-hallam Repository record for A project control framework for the Libyan construction industry. (opens in a new tab)

  12. APPLICATION OF COST SIGNIFICANCE TECHNIQUE TO TIME AND COST CONTROL OF CONSTRUCTION PROJECTS

    … three essential functions: planning, monitoring and controlling. The time and cost element of a construction project are presented in the form of time and cost plans. Networks and barcharts are frequently used to model the time plan of construction while the cost elements are presented mostly …

    nus Repository record for APPLICATION OF COST SIGNIFICANCE TECHNIQUE TO TIME AND COST CONTROL OF CONSTRUCTION PROJECTS (opens in a new tab)

  13. A mixed-method examination of the effects of an affective mental contrasting intervention on physical activity behaviours

    … can have implications for individuals’ physical and psychological health (Bray & Born, 2010). Accordingly, it is imperative to find and implement cost and time-effective interventions to mitigate the consequences of this transition. Mental contrasting is a self-regulatory strategy that involves …

    ubc Repository record for A mixed-method examination of the effects of an affective mental contrasting intervention on physical activity behaviours (opens in a new tab)

  14. Sensemaking in a value based context for large scale complex engineered systems

    <p>The design and the development of Large-Scale Complex Engineered Systems (LSCES) requires the involvement of multiple teams and numerous levels of the organization and interactions with large numbers of people and interdisciplinary departments. Traditionally, requirements-driven Systems …

    iastate Repository record for Sensemaking in a value based context for large scale complex engineered systems (opens in a new tab)

Page 1 of 39