Results 1 to 20 of 76 for “"Cost overrun"”

  1. Why Social Infrastructure Projects Experience Cost Overrun

    … projects worldwide suffer from frequent cases of cost overrun. As a critical challenge in the infrastructure industry, cost overrun remains, however an under-researched academic topic. Previous studies in this field have mainly adopted quantitative methodological research methods and analyzed data …

    ottawa-retro Repository record for Why Social Infrastructure Projects Experience Cost Overrun (opens in a new tab)

  2. Transportation infrastructure project cost overrun risk analysis : risk factor analysis models

    … to propose several useful analytical models for cost overrun risk analysis in transportation infrastructure investments. Probability models and regression models are proposed and partially (due to data insufficiency) applied using the VIHP (Vancouver Island Highway Project) data. The VIHP case …

    ubc Repository record for Transportation infrastructure project cost overrun risk analysis : risk factor analysis models (opens in a new tab)

  3. Analogical reasoning for risk assessment and cost overrun estimation in construction projects

    Project cost increase is the main concern in international construction projects which usually results in disputes and conflicts among the project participants. The aim of this thesis is to construct a database that represents risk event history regarding international construction projects and …

    metu Repository record for Analogical reasoning for risk assessment and cost overrun estimation in construction projects (opens in a new tab)

  4. Management of material waste and cost overrun in the Nigerian construction industry

    … attention in the Nigerian Construction Industry, cost overrun is a problem, which affects 90 percent of the completed projects in the world; the argument on how to reduce/eliminate cost overrun has been on-going for the past 70 years; as the on-site wastage of materials leads to increases in the …

    nmmu Repository record for Management of material waste and cost overrun in the Nigerian construction industry (opens in a new tab)

  5. Estimation of cost overrun risk in interrnational project by using fuzzy set theory

    … a risk premium that is added onto the estimated cost of the project. Due to the nature of construction works, there are lots of uncertainties associated with the project, market and country conditions. Therefore, how the profitability of the project changes with occurrence of various risk events, …

    metu Repository record for Estimation of cost overrun risk in interrnational project by using fuzzy set theory (opens in a new tab)

  6. Understanding the cost overrun causation in construction megaprojects – a grounded systems thinking approach

    Research background: The problem of cost overruns in construction megaprojects is a ‘complex problem’. Although a considerable amount of research has been conducted to identify the isolated factors causing cost overruns in megaprojects, there is a lack of holistic understanding of the complex …

    heriot-watt Repository record for Understanding the cost overrun causation in construction megaprojects – a grounded systems thinking approach (opens in a new tab)

  7. Development of a multi agent system for negotiation of cost overrun in international construction projects

    … process between parties about sharing of cost overrun in international construction projects. The developed tool can be used to understand how the risks and associated costs are shared between parties under different scenarios related with the risk allocation clauses in the contract, …

    metu Repository record for Development of a multi agent system for negotiation of cost overrun in international construction projects (opens in a new tab)

  8. Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling

    … dynamics of the factors which contribute to cost overrun. To overcome this challenge, efforts have been made to understand the drivers of cost overrun, but to date there has been insufficient focus on the intricate interactions and dynamics of the driving factors. Therefore, this study set …

    heriot-watt Repository record for Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling (opens in a new tab)

  9. A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa

    On-time completion and conformity with assigned cost of every project are the most important factors in the success of project plans. Cost overruns and time overrun (delays) have been critical problems of many projects around the world in general and in South Africa in particular. The main …

    dut Repository record for A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa (opens in a new tab)

  10. An exploratory case study of risk and opportunity management on CRL1 Project, UK: Investigating the major causes of time and cost overrun, and poor quality of work and possible remedies.

    … study was to investigate the possible causes of cost and time overrun and poor quality of work on CRL1 project and to identify the potential remedies. Qualitative audio recorded data were collected from a sample of eighty subject matter expert (SME) employees of CRL1 selected using purposive …

    soton Repository record for An exploratory case study of risk and opportunity management on CRL1 Project, UK: Investigating the major causes of time and cost overrun, and poor quality of work and possible remedies. (opens in a new tab)

  11. Towards a risk management framework for Libyan house-building projects

    Time and cost overrun problems are commonplace throughout the world in the construction industry. Libyan House-Building Projects (LHBP) experience the same dilemma and often to a greater extent. This is attributed to both unexpected and expected factors in which risk and uncertainty were not …

    salford Repository record for Towards a risk management framework for Libyan house-building projects (opens in a new tab)

  12. A Multi agent risk analysis and sharing platform for international construction projects

    … of risks and relations between risks and cost overrun, inability in incorporating the risk sharing principles between project participants, contract clauses and risk management strategies directly into the computation of responsibility sharing of risks among parties. The aim of this thesis …

    metu Repository record for A Multi agent risk analysis and sharing platform for international construction projects (opens in a new tab)

  13. Schedule and Cost Performance Analysis and Prediction in Louisiana DOTD

    … in the United States are facing the risk of cost overrun and schedule delays. This is also happening here in the State of Louisiana. When these things happen, it causes cost overrun which can then be passed on to the tax payers and may also cause the state to take on less projects than they …

    uno Repository record for Schedule and Cost Performance Analysis and Prediction in Louisiana DOTD (opens in a new tab)

  14. Cost Risk Assessment in Environmental Remediation: Towards a Causal-Chain Approach

    … the adaptation of the causal-chain approach to cost risk assessment; (2) a demonstrated use of change order data in understanding project risks; (3) the characterization of cost risks of environmental remediation; (4) the predictive models of cost overrun for environmental remediation.

    uiuc Repository record for Cost Risk Assessment in Environmental Remediation: Towards a Causal-Chain Approach (opens in a new tab)

  15. Hydro-electric power planning in the Yukon : a case study of the Aishihik Project

    … did begin in April 1973, it was estimated to cost $17 million and take twenty months to complete. The project finally cost $39 million and was not completed for twenty-six months. Information presented in the study consists almost entirely of primary written materials. The documentation …

    ubc Repository record for Hydro-electric power planning in the Yukon : a case study of the Aishihik Project (opens in a new tab)

  16. Correlation between Contingency Allowance and Change Orders

    … will be included in original contract. Premium cost also will be issued to pay non-value additional works. As a result, additional works, which also refers to change orders, are paid mainly by initial contingency, supplemental agreements and premium cost. This paper mainly aims to compare …

    tamu Repository record for Correlation between Contingency Allowance and Change Orders (opens in a new tab)

  17. Factors contributing to information technology software project risk : perceptions of software practitioners

    … links between risk likelihood, risk impact on cost overrun, and evidence of strategic responses in terms of risk mitigation The proposal within this research is to address this aspect of the debate by seeking to clarify the role of a project life cycle as a frame of reference that contracting …

    liverpool Repository record for Factors contributing to information technology software project risk : perceptions of software practitioners (opens in a new tab)

  18. A HIERARCHICAL MULTI-STAKEHOLDER PRINCIPAL-AGENT MODEL FOR (ANTI-) CORRUPTION IN PUBLIC INFRASTRUCTURE PROCUREMENT

    … phase of infrastructure procurement are studied. Cost overrun is a problem plaguing all the infrastructure projects and using the framework, a model is established to distinguish the unintentional cost overrun due to technical uncertainty and intentional one induced by selfish motivation of …

    cornell Repository record for A HIERARCHICAL MULTI-STAKEHOLDER PRINCIPAL-AGENT MODEL FOR (ANTI-) CORRUPTION IN PUBLIC INFRASTRUCTURE PROCUREMENT (opens in a new tab)

Page 1 of 4