Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 8 of 8 for “"Crane Selection"”
-
An integrated information system for crane selection and utilisation
This thesis presents a methodology for crane selection, location, and utilization on construction sites. It first describes the current practices and discusses the factors that are considered in the selection process, then it introduces a crane selection methodology. This methodology was used in …
-
A computer integrated system for crane selection for high-rise building construction
… for selecting type, number and locations of cranes for high-rise building construction projects. It combines expert knowledge, heuristics and rules of thumb.
-
Decision Support System for Crane Selection and Location Optimization on Construction Sites
Selecting the most appropriate cranes and identifying ideal crane locations on site can improve the productivity and safety of large-scale construction projects. A significant proportion of crane accidents have been caused by improper crane selection, lack of a proper crane support system, or a …
-
Logistikos centras "Autoarena" Išradėjų g. 6, Šiauliuose /
… to provide material sheets and self-propelled crane selection. Annexes contain heat transfer coefficient calculation, design calculation of a computer program, \"Robot Structural Analysis Professional 2011, localized estimate of building which calculated with “ProsSama5g” program.
-
„Audi“ centras Šventupio gatvėje 25a /
… to provide material sheets and self-propelled crane selection, heat transfer coefficient calculation. Annexes contain, design calculation of a computer program, "Robot Structural Analysis Professional 2013, localized estimate of building which calculated with “ProsSama5g” program.
-
Krovininių – lengvųjų automobilių serviso Kuršėnuose statybos projektas /
… the work technologies and organization, crane selection, construction works volumes charts. The economic part - a local estimate of the construction of a building, reinforced concrete and metal frame.
-
Crane lifting operation planning and lifted object spatial trajectory analysis
… to the field crew. The rigger signalman and the crane operator communicate by radio, or by hand signals, to maneuver the lifted object between obstructions. This thesis presents advancements in the development of mathematical algorithms for the lift object trajectory path and analysis. The …