Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 54 for “"Cut and Fill"”.
-
Design guidelines : underhand cut and fill cemented paste backfill sill beams
… negatively affect both mine production and the safety of underground workers. Underhand cut-and-fill mining is a potential solution to these issues. Discussions with mine sites revealed the use of sill beams in underhand cut-and-fill mining is not optimized. Optimization in ground …
-
Estimating Sediment Losses Generated from Highway Cut and Fill Slopes in the Lake Tahoe Basin
… stormwater. Of these urban sources, highway cut and fill slopes often generate large amounts of sediment due to their steep, highly-disturbed nature. Therefore, understanding the erosion mechanisms (rainfall-runoff and dry ravel), the magnitude of erosion rates and the particle-size …
-
Alluvial sedimentology and geomorphology of a cut and fill sequence on the Dassieboskloof River, Wuppertal, Southwestern Cape
The unique and well preserved fluvial sequences within the valleys of the Cederberg Mountains of the Western Cape, South Africa, provide the opportunity for palaeoenvironmental reconstruction which will add to the sparse evidence from across southern Africa. The location of the study site at the …
-
Determining the most suitable mining method for block 2 at Auptism Underground Mine
… Block 2. Block 2 is about 500 m long on strike and 600 m high with an average width of 3.5 m, varying between 1.5 m and 10 m. Block 2 is about 300 m below ground level, strikes approximately north south and dips approximately 60°. Block 2 contains 41,867 ounces of gold with an average grade of …
-
Daily and quasi-weekly beach profile changes at Monterey, California
Sand heights measured on two beach profiles, supplemented by wave and tide data, were collected on daily and quasi-weekly bases for Del Monte Beach between July 12, 1963, and March 31, 1964. This beach, composed of fine quartz sand, is located in a sheltered indentation where long, low swell …
-
Determination of mass excavation haul distance and direction by linear optimization
… for the determination of the haul distance and direction to haul the soil on a mass excavation project using linear optimization programming methodology. The system generates a mathematical solution for the minimum haul distance and the direction in which to haul the soil for each unit of …
-
Layers: Lac Leamy + LeBreton Flats
This thesis explores cut and fill operations to create an occupiable archive of LeBreton Flats' intertwined industrial and environmental histories. Employing visualization techniques which draw historical elements into dialogue, the thesis develops a method for understanding the cut and fill …
-
Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba
… of the working areas. At the McLellan Mine the cut-and-fill mining method was first adopted. This decision was made for flexibility in the size and shape of the mine openings to allow for the variability in width and grade of the ore zone. As a result the geotechnical design of the cut-and-fill …
-
Land Leveling Using Optimal Earthmoving Vehicle Routing
This thesis presents new solution approaches for land leveling, using optimal earthmoving vehicle routing. It addresses the Shortest Route Cut and Fill Problem (SRCFP) developed by Henderson, Vaughan, Wakefield and Jacobson [2000]. The SRCFP is a discrete optimization search problem, proven to be …
-
Application of Multiquadric Analysis to Earthwork Volume Measurements
… as: average end area method, contour method, and the grid corner method. These methods are time-consuming for the computation of earthwork volumes. The purpose of this study is to develop a new numerical computerized method for earthwork volume calculations. In this study, the multiquadric …
-
Integrated system for earthmoving operations
… the quantities of material to be moved from each cut section to each fill section. Two basic methods of earthwork allocations are available: mass diagram and linear programming. The mass diagram can be used to determine the most economic distribution of cut and fill. However, the usefulness of …
-
Slope Stability of the Hunter Creek Formation: A Geotechnical Investigation Near Mogul, Nevada
The Hunter Creek sandstone near Mogul, Nevada, is a Neogene sedimentary unit in the Verdi basin consisting of fluvial, deltaic, and lacustrine facies. Numerous slope failures have occurred in the unit mostly along streams, canals, and the Truckee River. Field mapping showed that most of the slope …
-
The evolution, processes, and deposits of high latitude submarine channel systems
Models of the flow processes, evolution, and architecture of submarine channel-levee systems are based on observations from low- and mid-latitude systems. The influence of glacial sediment supply or Coriolis forcing present at high latitudes are not taken into account. Here, I analyse multiple …
-
Holocene Channel Changes of Camp Creek: An Arroyo in Eastern Oregon
… of Camp Creek are episodes of fluvial scour and fill thousands of years old. Radiocarbon dates and the Mazama tephra, which serves as a stratigraphic time line, temporally bracket episodes of vertical aggradation and incision. Before 9000 years B.P. the valley floor was scoured to the …
-
Daily changes in beach profile and sand texture on Del Monte Beach, California.
Beach-elevation measurements were made and sand samples were collected along a single profile daily at low tide during the period from February 1 through March 31, 1967. Wave and tide data were recorded continuously. The beach, composed of medium- to- fine quartz and feldspar sand, is well …
-
Development of emiprical [sic] and numerical design techniques in burst prone ground at the Red Lake Mine
… It presents the development of empirical and numerical design techniques at Goldcorp Inc's Red Lake Mine. The first section expands upon the understanding of the rockburst mechanism at the mine. Four known rockbursts were analysed to better understand the mechanism. Some variables such as …
-
Span design for entry-type excavations
… of underground excavation span design techniques and the conditions under which they can be applied. Shortcomings of these existing methods, as they are applied to cut and fill stopes and other entry-type excavations, are highlighted. A design procedure specific to conditions found in entry-type …
-
Evaluation of roadside revegetation in central Arizona.
The policies of the USDA Forest Service and the Arizona Department of Transportation require revegetation of land disturbed by road construction. Revegetation objectives of both agencies include soil stabilization and mitigation of visual impacts. Typical seed mixes include Lehmann and Cochise …
-
An advisory system for scraper selection
… utilizing scrapers, the capacity of the scraper and the cycle time for the given project conditions must be calculated. Since travel time varies widely based on the conditions of the haul road and the performance of the equipment, determining the most economical selection (size and model) and the …
Page 1 of 3