Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 41 for “"Cut-off Grade"”

  1. Cut-Off Grade Strategy: Analysis For Dominga Project

    Cut-off grade is a concept used in the mining industry to decide whether to consider the material from the mine as ore or waste. The decision of the specific cut-off grade used in a mine should be periodically evaluated because this concept involves variables such as commodity prices, mining costs, …

    queens Repository record for Cut-Off Grade Strategy: Analysis For Dominga Project (opens in a new tab)

  2. Stochastic Dynamic Optimization of Cut-off Grade in Open Pit Mines

    … commodities within these deposits, or the grade, is heterogeneous. Not all material has sufficiently high grades to economically justify processing. Cut-off grade is the lowest grade at which material is considered ore and is processed to create a concentrated commodity product. The choice …

    queens Repository record for Stochastic Dynamic Optimization of Cut-off Grade in Open Pit Mines (opens in a new tab)

  3. Cut-off grade optimization of open pit mines with multiple processing streams

    In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value of a mining project based on a finite resource. Optimal cut-off policies are generated using Lane’s method for determining cut-off grade. By maximizing the present value of future profits as a …

    ubc Repository record for Cut-off grade optimization of open pit mines with multiple processing streams (opens in a new tab)

  4. Cut-off Grade Optimization in Open-pit Mines Considering Two Processing Streams and Rehabilitation Cost

    Cut-off grade is one of the important aspects of mining engineering. It distinguishes which material is worth mining and processing or stockpiling and which one should be left or dumped as waste. The success of many mining operations nowadays is measured by the net present value generated. …

    alberta Repository record for Cut-off Grade Optimization in Open-pit Mines Considering Two Processing Streams and Rehabilitation Cost (opens in a new tab)

  5. Incorporating cut-off grade optimization and stockpiling into oil sands production scheduling and waste management.

    … and waste from the final pit limit. An optimum cut-off grade profile and stockpiling will ensure the segregation between these materials meet economic and regulatory requirements. In-pit waste management strategy for oil sands mining requires dyke construction to occur simultaneously with the …

    laurentian Repository record for Incorporating cut-off grade optimization and stockpiling into oil sands production scheduling and waste management. (opens in a new tab)

  6. GLOBAL OPTIMIZATION OF THE OPEN PIT MINING COMPLEX WITH INTEGRATED CUT-OFF GRADE OPTIMIZATION UNDER UNCERTAINTY

    … destination policies are defined based on the cut-off grade optimization and block economic values. This allows to form the destination policies for the mined material into various processing streams and maximize the value of the operation. The production schedule and the destination policies …

    mtu Repository record for GLOBAL OPTIMIZATION OF THE OPEN PIT MINING COMPLEX WITH INTEGRATED CUT-OFF GRADE OPTIMIZATION UNDER UNCERTAINTY (opens in a new tab)

  7. Capacity Planning Optimization Integrating Cut-Off Grade and Block Sequencing Under Economies of Scale, Cost Structures, and Grade Distribution Considerations

    … of mining and processing capacities/rates, (2) cut-off grade(s), and (3) block sequencing. Currently, these problems are solved sequentially because of the large size of the problem. The sequential approach might undervalue projects. Despite significant knowledge accumulation on cut-off grade …

    mcgill Repository record for Capacity Planning Optimization Integrating Cut-Off Grade and Block Sequencing Under Economies of Scale, Cost Structures, and Grade Distribution Considerations (opens in a new tab)

  8. Otimização do teor de corte e seu impacto nas operações da Samarco

    Cut-off grade is a fundamental parameter in mining, as it defines the separation between ore and waste rock, varying according to the type of ore and mineral processing method adopted, directly impacting the Net Present Value (NPV) and the economic viability of mining projects. Since the 1960s, …

    brazil-ufmg Repository record for Otimização do teor de corte e seu impacto nas operações da Samarco (opens in a new tab)

  9. Joint Stochastic Optimization of Open Pit Mine Production Scheduling, Ramp Design and Cut-off Grades for Multiple Elements Under Geological Uncertainty

    … starting with the destination policy (cut-off grade) using Lane’s method, followed by the production schedule, and finally, downstream decisions. This sequential approach often leads to local rather than global optima and is typically deterministic, overlooking the uncertainties in mine …

    mcgill Repository record for Joint Stochastic Optimization of Open Pit Mine Production Scheduling, Ramp Design and Cut-off Grades for Multiple Elements Under Geological Uncertainty (opens in a new tab)

  10. Feasibility Study for Lithium Mining in South Dakota

    … Dakota. Our specific objective is to estimate cut-off grade using Lane’s model that would maximize profit for lithium mining in South Dakota and evaluate the profitability of lithium mining in South Dakota. The knowledge generated from this study is expected to aid the decision-making process …

    sdstate Repository record for Feasibility Study for Lithium Mining in South Dakota (opens in a new tab)

  11. Maximización de valor presente neto a través de la optimización de la ley de corte en una mina subterránea

    … con altas leyes de mineral. La ley de corte o cut-off grade toma un papel preponderante a la hora de toma de decisión respecto la viabilidad económica por parte de un inversionista o gerente. En el presente trabajo de investigación se establece la ley de corte óptima de un cuerpo mineralizado …

    pucp-peru-2 Repository record for Maximización de valor presente neto a través de la optimización de la ley de corte en una mina subterránea (opens in a new tab)

  12. O teor de corte como um output do planejamento estratégico para otimizar a geração de valor. Um estudo de caso

    The cut-off grade, although being usually considered to be just another trivial step in the process of strategic planning in a mine, is an element of enormous importance when looking into a real operation or a mine project under a value generation or maximization of value generation point of view, …

    brazil-ufmg Repository record for O teor de corte como um output do planejamento estratégico para otimizar a geração de valor. Um estudo de caso (opens in a new tab)

  13. Financial optimization of mining plant size

    … of a given operation, and upon the optimal grade-capacity combination to be employed for a given orebody. The difference of the impact of Canadian and United States tax laws with respect to the conservation of resources is also considered. After each of the controllable and uncontrollable …

    ubc Repository record for Financial optimization of mining plant size (opens in a new tab)

  14. SEEING, THINKING, DOING – A MULTIFACETED MODEL TO EMBRACE UNCERTAINTY IN MINE PLANNING

    … Visualizing and Quantifying Uncertainty in Cut-off Grade Selection, leverages the visualization techniques presented in Paper 1 and provides the mining engineer with tools to perform the second step in the model – thinking. In this stage of the mining company’s evolution to embracing …

    montana-tech Repository record for SEEING, THINKING, DOING – A MULTIFACETED MODEL TO EMBRACE UNCERTAINTY IN MINE PLANNING (opens in a new tab)

  15. SEEING, THINKING, DOING – A MULTIFACETED MODEL TO EMBRACE UNCERTAINTY IN MINE PLANNING

    … Visualizing and Quantifying Uncertainty in Cut-off Grade Selection, leverages the visualization techniques presented in Paper 1 and provides the mining engineer with tools to perform the second step in the model – thinking. In this stage of the mining company’s evolution to embracing …

    montana Repository record for SEEING, THINKING, DOING – A MULTIFACETED MODEL TO EMBRACE UNCERTAINTY IN MINE PLANNING (opens in a new tab)

  16. Uso da inovação tecnológica na mineração do ouro - um estudo dos aspectos técnicos e econômicos

    … dam facilities, rising energy costs, low grade ore deposits, restrictions in mining regulations and access to the available resources. In this context, the main objective of the study was to identify gold ores below cut-off grade from the underground mine at Córrego do Sitio Mineração, …

    brazil-ufmg Repository record for Uso da inovação tecnológica na mineração do ouro - um estudo dos aspectos técnicos e econômicos (opens in a new tab)

  17. Strategic Design of an Underground Mine under Conditions of Metal Price Uncertainty

    … is to develop a methodology to determine the cut-off grade and production rate of a narrow-vein underground mine such that the long-term strategic plan is robust. As a requirement to do so, it is necessary to have a good understanding of the resources, revenues, capital and operating costs as …

    queens Repository record for Strategic Design of an Underground Mine under Conditions of Metal Price Uncertainty (opens in a new tab)

Page 1 of 3