Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 11 of 11 for “"Deck Placement"”

  1. Levels of lateral flange bending in straight, skewed and curved steel I -girder bridges during deck placement

    … steel I-girders are required to withstand deck overhang loads during construction. This is partially accomplished by checking the flexural limit states for constructibility given by AASHTO. These limit states ensure that the maximum flange bending stresses produced during construction do …

    wvu Repository record for Levels of lateral flange bending in straight, skewed and curved steel I -girder bridges during deck placement (opens in a new tab)

  2. Predicting the behavior of horizontally curved I-girders during construction

    … partially constructed behavior, and concrete deck placement behavior. Additional analytical studies followed using the field measurements to verify the finite element models. Finally, conclusions drawn from the physical and analytical testing were utilized to derive equations that predicted …

    texas Repository record for Predicting the behavior of horizontally curved I-girders during construction (opens in a new tab)

  3. Impact of Extreme Summer Temperatures on Bridge Structures

    … and transverse temperature gradients in a pre-deck placement condition. It was determined that the current design standard, which uses a non-linear vertical thermal gradient, was inaccurate in both shape and magnitude for girders Type IV and smaller in this condition. Transverse gradients were …

    arkansas Repository record for Impact of Extreme Summer Temperatures on Bridge Structures (opens in a new tab)

  4. Improve the Prediction of Camber, Deflection, and Prestress Losses in Precast, Prestressed Concrete Bridge Girders

    … when installing the cast-in-place concrete deck. The objective of this research was to improve the accuracy of estimating long-term camber, deflection, and prestress losses of precast, prestressed concrete girders. The experimental program consisted of measuring concrete properties and …

    arkansas Repository record for Improve the Prediction of Camber, Deflection, and Prestress Losses in Precast, Prestressed Concrete Bridge Girders (opens in a new tab)

  5. Development of three-dimensional finite element software for curved plate girder and tub girder bridges during construction

    … girder and tub girder bridges during erection or deck placement. It then illustrates the capabilities of the program for various structural systems subjected to a variety of loads, from self-weight to wind and temperature loads. In addition to a linear elastic analysis, multiple types of analysis …

    texas Repository record for Development of three-dimensional finite element software for curved plate girder and tub girder bridges during construction (opens in a new tab)

  6. Behavior during construction of ramp B over I-40 in Nashville, TN

    … to the steel erection plan as well as the deck placement sequence. There is limited quantitative information available on the performance of large curved bridges under construction. This study seeks to address this limitation through the study of a curved ramp I-girder bridge. The bridge …

    gatech Repository record for Behavior during construction of ramp B over I-40 in Nashville, TN (opens in a new tab)

  7. The Viability of Steel-Concrete Composite Girder Bridges with Continuous Profiled Steel Deck

    The continuous permanent metal deck form system provides a quick and efficient method of constructing short-span, simply supported composite steel girder bridges. However, because shear studs can only be welded to the girder through the steel deck at rib locations, the number of shear stud …

    vt Repository record for The Viability of Steel-Concrete Composite Girder Bridges with Continuous Profiled Steel Deck (opens in a new tab)

  8. Experimental evaluation of partial depth precast concrete deck panels subjected to shear loading

    … critical stage for the bracing is during the deck placement, when the noncomposite girders must resist the full construction load. Partial depth precast concrete panels (PCPs) are prestressed concrete panels used primarily as stay-in-place (SIP) formwork for straight girder systems. They are …

    texas Repository record for Experimental evaluation of partial depth precast concrete deck panels subjected to shear loading (opens in a new tab)

  9. Influence of cross-frame detailing on curved and skewed steel I-girder bridges

    … and skewed I-girder bridges exhibit torsional displacements of the individual girders and of the overall bridge cross-section under dead loads. As a result, the girder webs can be plumb in only one configuration. If the structure is built such that the webs are plumb in the ideal no-load position, …

    gatech Repository record for Influence of cross-frame detailing on curved and skewed steel I-girder bridges (opens in a new tab)

  10. Shear Strength of a PCBT-53 Girder Fabricated with Lightweight, Self-Consolidating Concrete

    … composite cast-in-place lightweight concrete deck was added at the Virginia Tech Structures and Material Laboratory. The project had two specific goals. The first was to experimentally determine the shear strength of the bridge girder. The initial tests focused on the web-shear strength of the …

    vt Repository record for Shear Strength of a PCBT-53 Girder Fabricated with Lightweight, Self-Consolidating Concrete (opens in a new tab)

  11. Evaluation of superstructure response and load distribution in skewed steel I-girder bridges

    Submission original under an indefinite embargo labeled 'Open Access'. The submission was exported from vireo on 2023-12-04 without embargo terms

    uiuc Repository record for Evaluation of superstructure response and load distribution in skewed steel I-girder bridges (opens in a new tab)