Results 1 to 7 of 7 for “"Delays in Projects"”

  1. The Prevalence of Six Sigma Trends in the Construction Industry in Pakistan

    Economic development in any country or area depends heavily on the performance of the construction industry. This is because the subsequent development of infrastructure increases economic activity, living standards, direct foreign investments, and business opportunities. The construction industry …

    wku-diss Repository record for The Prevalence of Six Sigma Trends in the Construction Industry in Pakistan (opens in a new tab)

  2. Causes of delays in construction projects & how the project manager can act to avoid delays

    This thesis presents the findings of both personal experience illustrated by case studies, and questionnaire surveys aimed at identifying the most important causes of delays in civil engineering construction projects in Dubai from the viewpoint of construction contractors.<br/><br/>Dubai presents a …

    southwales Repository record for Causes of delays in construction projects & how the project manager can act to avoid delays (opens in a new tab)

  3. Evaluating the effect of delivery of government projects in the Northern Cape

    The construction industry is a major player in the economy, generating both employment and wealth. However, many projects experience extensive delays and thereby exceed initial time and cost estimates. This study's aim was to determine the causes of delays in project delivery in the Northern Cape, …

    nwu-za Repository record for Evaluating the effect of delivery of government projects in the Northern Cape (opens in a new tab)

  4. Reliability test of a RIFD system for tool management on construction sites

    In the construction industry, one of the aspects that affect the productivity of the construction crew is the availability of tools and supplies. Unavailability of tools and supplies results in a delay of the project, which in turn increases the cost of the project. If any such delays on job sites …

    tamu Repository record for Reliability test of a RIFD system for tool management on construction sites (opens in a new tab)

  5. Developing an ideal turn around time – a case of the Zambia public procurement authority

    This study is aimed at developing processes that could mitigate bottlenecks and develop ideal lead times for the public sector procurement system. This was a cross-sectional functional pragmatic study design employing a concurrent mixed methods design. Thirty five participants from six public …

    zambia Repository record for Developing an ideal turn around time – a case of the Zambia public procurement authority (opens in a new tab)

  6. Estimation of the utilization rate for pressurized face shielded TBMs using discrete event simulation

    During tunnel construction using a Tunnel Boring Machine (TBM), various tasks are performed to excavate and support the ground. The ratio of TBM excavation duration to the total working time is called the machine utilization rate and represents the efficiency of operations, operational, and …

    colo-mines Repository record for Estimation of the utilization rate for pressurized face shielded TBMs using discrete event simulation (opens in a new tab)

  7. A fuzzy logic approach to model delays in construction projects

    Delays in construction projects are inevitable; as a result claims and disputes arise among different construction parties. Different causes of delay can come into play, therefore, there is a need to identify and classify different causes of project delay. Estimation of the likelihood of delay …

    ohiolink Repository record for A fuzzy logic approach to model delays in construction projects (opens in a new tab)