Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 1 of 1 for “"Direct Pipe Installation"”
-
Evaluation of Methods Used to Estimate the Required Thrust Force for Direct Pipe Installation Within Clayey Soil Based on Case Studies
There is a unique technology called Direct Pipe Installation (DPI) developed by Herrenknecht Tunnelling Systems (Herrenknecht) which is becoming more a prominent construction method in the pipeline crossing industry. This construction technique is completed by connecting a micro tunnel boring …