Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 131 for “"Due Dates"”

  1. Scheduling to Meet Due Dates with Overtime and Alternative Transportation Modes

    The objective of this thesis is to schedule jobs to cells considering different transportation modes and overtime options. All jobs are scheduled and late jobs are not allowed. Three transportation modes are proposed: rail, ground, and air. Weekday and weekend overtime is allowed with different …

    ohiolink Repository record for Scheduling to Meet Due Dates with Overtime and Alternative Transportation Modes (opens in a new tab)

  2. Scheduling with due dates and time-lags : new theoretical results and applications

    … scheduling models with time-lags and release/due dates inspired by two realworld problems: transportation of goods and appointment scheduling for chemotherapy patients. The first part of this thesis studies the minimisation of the maximum lateness for two batch scheduling problems with …

    whiterose Repository record for Scheduling with due dates and time-lags : new theoretical results and applications (opens in a new tab)

  3. The vehicle routing problem with release and due dates: formulations, heuristics and lower bounds

    … available to leave the depot for delivery, and a due date that indicates the time by which the order should ideally be delivered to the customer. The objective is to minimise a convex combination of the operational costs and customer service level, measured as total distance travelled and total …

    soton Repository record for The vehicle routing problem with release and due dates: formulations, heuristics and lower bounds (opens in a new tab)

  4. Mitigating Missed Order Due Dates in an Engineer-to-Order Environment: Evidence from Saudi Arabia

    … addressed the pressing issue of missed order due dates in the highly dynamic engineer-to-order (ETO) environments of AL DAR Company, a Saudi Arabian ETO manufacturer. Despite the common adoption of ETO approaches in several industries, a significant research gap existed regarding consensus on …

    cent-lancashire Repository record for Mitigating Missed Order Due Dates in an Engineer-to-Order Environment: Evidence from Saudi Arabia (opens in a new tab)

  5. Integrated Scheduling of Production and Transportation Operations with Stage-dependent Inventory Costs and Due Dates Considerations

    … un transporteur à capacité limitée, avant des dates dues données. Chaque aller-retour du transporteur entre l'usine et le client implique un coût de livraison et des délais de livraison. De plus, on suppose que les tâches qui sont terminées avant leur date de départ ou qui sont livrées au …

    star-france Repository record for Integrated Scheduling of Production and Transportation Operations with Stage-dependent Inventory Costs and Due Dates Considerations (opens in a new tab)

  6. Cell Loading and Family Scheduling for Jobs with Individual Due Dates in a Shoe Manufacturing Company

    … study from others is the presence of individual due dates for every job in a family. Family splitting among cells is allowed even though this will cause number of setups to increase as long as values improve the number of tardy jobs, the total tardiness, and the maximum tardiness. Two methods are …

    ohiolink Repository record for Cell Loading and Family Scheduling for Jobs with Individual Due Dates in a Shoe Manufacturing Company (opens in a new tab)

  7. An FPTAS for Total Weighted Earliness Tardiness Problem with Constant Number of Distinct Due Dates and Polynomially Related Weights

    … and each job has a weight, processing time and a due date. A job is early when it finishes before or on its due date and its earliness is the amount of time between its completion time and its due date. A job is tardy when it finishes after its due date and its tardiness is the amount of time …

    mcmaster Repository record for An FPTAS for Total Weighted Earliness Tardiness Problem with Constant Number of Distinct Due Dates and Polynomially Related Weights (opens in a new tab)

  8. An FPTAS for the Single Machine Minimum Total Weighted Tardiness Problem With a Fixed Number of Distinct Due Dates

    … (TWT) problem with a constant number ofdistinct due dates.</p> <p>Given a sequence ofjobs on a single machine, each with a weight, processing time, and a due date, the tardiness of a job is the amount of time that its completion time goes beyond its due date. The TWT problem is to find a schedule …

    mcmaster Repository record for An FPTAS for the Single Machine Minimum Total Weighted Tardiness Problem With a Fixed Number of Distinct Due Dates (opens in a new tab)

  9. Supply chain scheduling with delivery costs

    … using deterministic models. </p> <p> Meeting due dates is always one of the most important concerns in scheduling and supply chain management. In most supplying contracts, customers require that suppliers either meet contracted due dates or pay tardiness penalties. In order to save delivery …

    mcmaster Repository record for Supply chain scheduling with delivery costs (opens in a new tab)

  10. ΕΦΑΡΜΟΓΕΣ ΤΗΣ ΜΑΘΗΜΑΤΙΚΗΣ ΑΝΑΛΥΣΗΣ, ΕΥΡΕΤΙΚΩΝ ΜΕΘΟΔΩΝ ΚΑΙ ΤΗΣ ΘΕΩΡΙΑΣ ΑΣΑΦΩΝ ΣΥΝΟΛΩΝ ΣΕ ΠΡΟΒΛΗΜΑΤΑ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΚΑΙ ΕΛΕΓΧΟΥ ΠΑΡΑΓΩΓΗΣ

    … OF SCHEDULING PROBLEMS WERE DEALT WITH USING DUE-DATES DETERMINATION METHODS WERE THE DUE-DATES WERE TREATED AS DECISION VARIABLES. RESEARCH WAS ALSO FOCUSED ON IN MODELLING SCHEDULING PARAMETERS WHICH ARE CHARACTERIZED BY IMPRECISION VIA FUZZY SET THEORY. MATHEMATICAL ANALYSIS, ENUMERATIVE …

    greece Repository record for ΕΦΑΡΜΟΓΕΣ ΤΗΣ ΜΑΘΗΜΑΤΙΚΗΣ ΑΝΑΛΥΣΗΣ, ΕΥΡΕΤΙΚΩΝ ΜΕΘΟΔΩΝ ΚΑΙ ΤΗΣ ΘΕΩΡΙΑΣ ΑΣΑΦΩΝ ΣΥΝΟΛΩΝ ΣΕ ΠΡΟΒΛΗΜΑΤΑ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΚΑΙ ΕΛΕΓΧΟΥ ΠΑΡΑΓΩΓΗΣ (opens in a new tab)

  11. Mixed-model assembly line sequencing problem

    … the tradeoffs associated with sequencing to meet due dates versus sequencing to level component usage for the mixed-model sequencing problem with specific customer due dates. In this problem, the product due dates are determined by the customer and each product on the assembly line is associated …

    utk-theses Repository record for Mixed-model assembly line sequencing problem (opens in a new tab)

  12. Part selection in a dynamic job-shop type flexible manufacturing system (FMS)

    … of increasing productivity. The earliest-due-date part selection algorithm with the objective of meeting due dates is also investigated for the part selection problem. A hypothetical FMS is formulated for the investigation. Computer simulation is used for evaluation. The first-in-first-out …

    ttu Repository record for Part selection in a dynamic job-shop type flexible manufacturing system (FMS) (opens in a new tab)

  13. Regression Based Allowance Policy Determination Procedures in a General Job Shop: An Evaluation in Terms of Completion Inaccuracy Penalties

    … dissertation addresses the problem of setting due dates to minimize completion inaccuracy penalties in a general job shop environment. In this simulation study, lateness penalties are generated by four defined functions: lateness variance, mean squared lateness, mean absolute lateness, and …

    vcu Repository record for Regression Based Allowance Policy Determination Procedures in a General Job Shop: An Evaluation in Terms of Completion Inaccuracy Penalties (opens in a new tab)

Page 1 of 7