Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 14 of 14 for “"EIRR"”
-
Towards the validation of the educational interpreter roles and responsibilities (EIRR) guiding checklist: Exploring expert stakeholders’ perspectives
… Interpreter Roles and Responsibilities (EIRR) Guiding Checklist, designed to assist the Individual Education Program (IEP) team in determining and documenting the specific roles and responsibilities required of the educational interpreter, as appropriate to the needs of the individual …
-
Estudio de prefactibilidad para la implementación de una cadena de bodegas en la zona Norte de Lima Metropolitana
… part, the results were NPV = S/177 614,78 and an EIRR = 51,14% and for the Financial one an NPV= S/209 148,22 and an EIRR= 71,46%, the investment being S/284 180. On the social side we can affirm the generation of jobs and finally on the environmental side the implementation was implemented …
-
Estudio de prefactibilidad para la instalación de una planta productora de fosfato diamónico para el mercado de la selva
… through indicators such as NPV S/ 200,564, EIRR 24.10%, NPV S/ 655,861 and EIRR 29.99% for the implementation of the industrial plant, as well as the benefits that would be generated to the shareholders and the socioeconomic impacts in the area of influence of the Project.
-
Estudio de prefactibilidad para la implementación de una planta para la producción de arroz con verduras cocido para microondas
… that the NPV value is S/1 046 812,20, the EIRR value is 21,81%, the NPV value is S/1 025 127,05 and the IRR value is 25,24%, demonstrating the profitability of the project. Finally, Lurigancho-Chosica is identified as a zone of influence, since the plant will operate there and generate …
-
Estudio de prefactibilidad para la instalación de una planta productora de harina a base de sub-productos del proceso industrial de café (Coffea)
… NPV (S/.4’262,698 and S/.4’442,395); the eIRR of 46.67% and fIRR of 57.51%; and P/C ratio of 2.11 and 2.652.
-
Ανάλυση βιωσιμότητας και αποδοτικότητας επενδύσεων σε μεγάλα έργα υποδομής: η περίπτωση της σιδηροδρομικής σύνδεσης Αθήνας - Πάτρας
… ο Οικονομικός Εσωτερικός Βαθμός Απόδοσης (EIRR) και ο Οικονομικός Λόγος Οφέλους - Κόστους (Economic B/C). Οι ποσοτικοποιημένες κοινωνικοοικονομικές ωφέλειες αφορούν την εξοικονόμηση χρόνου μετακίνησης, τη μείωση του κοινωνικού κόστους των οδικών ατυχημάτων και τη μείωση των εκπομπών CO2. …
-
Negocio de E-Learning enfocado en el desarrollo de habilidades y exploración de intereses vocacionales para jóvenes
… period, where the WACC is 14.08% and the EIRR is 44.34%.
-
Estudio de prefactibilidad para la instalación de una planta productora de hojas de papel reciclado para impresión
… 099,85 soles are positive and the values of the EIRR = 21,00% and the IRR = 28,52 % are higher than the opportunity cost (COK = 19,53%), it is concluded that the project is profitable. Finally, in chapter VIII, the social evaluation was carried out, from which a favorable Product - Capital ratio …
-
Estudio de prefactibilidad para la instalación de una planta de producción de jelly shots a base de pisco
… because the NPV is S/. 181,807.08, the EIRR is 27.01%, the benefit/cost ratio is 1.33 and the recovery period is 3.62 years.
-
A study on the utilisation of small-scale hydropower for rural electrification in Malawi
… discount rate, and the economic rate of return (EIRR) was 5.98%. The benefit cost ratio was 6.25. The break- even tariff is MWK 44.80 per kWh. The average willingness to pay is MWK 5.58/kWh. The project would deliver 192,337 kWh/year of electricity and result in avoided emissions of 59.62 tons …
-
Estudio de prefactibilidad para la elaboración de una bebida energética a base mate de hoja de coca (Erythroxylum coca) y kiwicha (Amaranthus caudatus) con saborizantes naturales en Lima Metropolitana
… evaluation obtained a ENPV of S/1 761 970, an EIRR of 63% and a benefit-cost ratio (B/C) of 1,27. Finally, it was obtained that the accumulated added value at the end of the project would be S/6 944 403.
-
Estudo da expressão de citocinas, quimiocinas e metaloproteinases e associação da ocorrência de seus polimorfismos, em reabsorções radiculares inflamatórias e por substituição após reimplante de dentes permanentes
… in the RERR group when compared with EIRR (p<0,001). In conclusion our results confirmed that age at the moment of trauma and timing of pulpectomy are important risk factors for IERR prior to the onset of endodontic therapy. Storage condition of the avulsed teeth, splinting time and …
-
Estudo da expressão de citocinas, quimiocinas e metaloproteinases e associação da ocorrência de seus polimorfismos, em reabsorções radiculares inflamatórias e por substituição após reimplante de dentes permanentes
… in the RERR group when compared with EIRR (p<0,001). In conclusion our results confirmed that age at the moment of trauma and timing of pulpectomy are important risk factors for IERR prior to the onset of endodontic therapy. Storage condition of the avulsed teeth, splinting time and …
-
Development aid - a perspective on the World Bank performance
This doctoral thesis focuses on the evaluation of the World Bank (WB) performance in delivering development aid to the Least Developed Countries (LDCs). For this purpose, an extensive research was performed to analyze a set of 790 Implementation Completion and Results reports for key economic and …