Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 40 for “"ESCos"”

  1. Improved risk management processes for South African industrial ESCos

    … past, South African energy service companies (ESCos) primarily implemented demand side management (DSM) projects, which were supported by Eskom Integrated Demand Management (IDM) funding models. With the introduction of new Eskom IDM performance-based funding models, more risk involved with …

    nwu-za Repository record for Improved risk management processes for South African industrial ESCos (opens in a new tab)

  2. Development of technological capabilities in Chinese Energy Service Companies (ESCOs)

    … four research questions: 1. Why have Chinese ESCOs developed their technological capabilities? 2. Which and how do factors affect Chinese ESCO’s technological capabilities? 3. How have Chinese ESCOs developed technological capabilities? 4. How do case companies compare to US ESCOs in terms of …

    aston Repository record for Development of technological capabilities in Chinese Energy Service Companies (ESCOs) (opens in a new tab)

  3. Simplified high-level investigation methodology for energy saving initiatives on deep-level mine compressed air systems

    … energy wastage. Thus, energy service companies (ESCOs) have identified compressed air systems as an area with significant potential for reducing the operating costs of deep-level mines. ESCOs have expertise in different fields to investigate, quantify and realise new energy saving initiatives. …

    nwu-za Repository record for Simplified high-level investigation methodology for energy saving initiatives on deep-level mine compressed air systems (opens in a new tab)

  4. GUARANTEE DESIGN ON ENERGY PERFORMANCE CONTRACTS UNDER UNCERTAINTY

    … popular. However, most Energy Service Companies (ESCOs) set the savings guarantee roughly based on their previous experience, which leads to inaccurate estimates in practice. This paper has built the stochastic models for the savings risks both from the energy price volatility and the facility …

    maryland Repository record for GUARANTEE DESIGN ON ENERGY PERFORMANCE CONTRACTS UNDER UNCERTAINTY (opens in a new tab)

  5. Strategies to revive DSM mine pumping projects under the new ESCo model

    … model. The ESCo model entails Eskom contracting ESCos to implement DSM projects with the aim of reducing the electricity consumption or electricity cost of client systems. One such system commonly targeted for DSM projects under the ESCo model is mine pumping systems. Unfortunately, DSM mine …

    nwu-za Repository record for Strategies to revive DSM mine pumping projects under the new ESCo model (opens in a new tab)

  6. Development of processes to improve sustainability of industrial IDM projects

    … implemented by Energy Services Companies (ESCos). The IDM projects, also referred to as Demand Side Management (DSM) projects, are implemented by ESCos to reduce and manage the electricity usage on the demand side of the grid. In 2015, Eskom decided to change the DSM model to be more …

    nwu-za Repository record for Development of processes to improve sustainability of industrial IDM projects (opens in a new tab)

  7. A unique energy–efficiency–investment–decision–model for energy services companies

    … the need for Energy Service Companies (ESCos) has arisen to address the supply constraint of national utilities and emission reductions faced by governments, to mitigate climate change. This has led to the development of two energy-efficiency finance business applications in South …

    nwu-za Repository record for A unique energy–efficiency–investment–decision–model for energy services companies (opens in a new tab)

  8. A systems engineering approach to improve the measurement and verification process of energy services companies

    … on energy usage. Energy Services Companies (ESCOs) all over the world are implementing initiatives to save energy. The South African ESCO industry must still overcome many barriers for it to be as effective as other global ESCOs. One of the stakeholders of an energy-savings intervention is …

    nwu-za Repository record for A systems engineering approach to improve the measurement and verification process of energy services companies (opens in a new tab)

  9. A new integrated procedure for energy audits and analyses of buildings

    … strategy by financing Energy Service Companies (ESCOs) to reduce the demand load of major electricity end-users during peak times. Buildings consume a large percentage of the total energy supply in the world. Most of the energy consumed in buildings is used by the heating, ventilation and …

    nwu-za Repository record for A new integrated procedure for energy audits and analyses of buildings (opens in a new tab)

  10. Optimising deep-level mine refrigeration control for sustainable cost savings

    … Management (DSM). Energy Services Companies (ESCos) are employed by Eskom to implement DSM initiatives on large electricity consumers such as gold mines. However, research proves that implemented load management initiatives (part of DSM) were not sustainable in the past. This is mainly due to …

    nwu-za Repository record for Optimising deep-level mine refrigeration control for sustainable cost savings (opens in a new tab)

  11. The impacts of project scale, scope and risk allocation on financial returns for clients and contractors in Energy Performance Contracts – a stochastic modelling analysis

    … partners, known as Energy Service Companies (ESCOs), would enable investment programmes to be targeted more effectively. This study uses probabilistic energy modelling of hypothetical case studies in the UK schools sector to assess the scale of possible energy savings from a range of retrofit …

    ucl Repository record for The impacts of project scale, scope and risk allocation on financial returns for clients and contractors in Energy Performance Contracts – a stochastic modelling analysis (opens in a new tab)

  12. Overcoming barriers to microgeneration in new homes: coevolutionary analysis and attitudes to different deployment models

    … homes, but that householder attitudes towards ESCOs may be mixed. An existing theory that more innovative householders will prefer private ownership of microgeneration to ESCOs (and vice versa), is tested quantitatively. No relationship between innovativeness and choice of deployment model is …

    whiterose Repository record for Overcoming barriers to microgeneration in new homes: coevolutionary analysis and attitudes to different deployment models (opens in a new tab)

  13. Identification model for cost-effective electricity savings on a mine cooling system

    … initial funding from Eskom has however limited ESCos to load shifting or bulk air cooler peak clipping projects. An integrated methodology was needed to identify scope for electricity cost savings on mine cooling systems due to the interconnected nature of these systems. Existing studies do not …

    nwu-za Repository record for Identification model for cost-effective electricity savings on a mine cooling system (opens in a new tab)

  14. Investigating the effects of different DSM strategies on a compressed air ring

    … companies, called Energy Service Companies or ESCOs, and individuals to help in this regard and also join in on a rewarding business opportunity. To be able to reduce electricity demand, these companies, ESCOs, have different strategies. Some focus on buildings, usually heating, ventilation and …

    nwu-za Repository record for Investigating the effects of different DSM strategies on a compressed air ring (opens in a new tab)

  15. A new approach to ensure successful implementation and sustainable DSM in RSA mines

    … makes it possible for Energy Services Companies (ESCos) to undertake DSM projects that were previously not possible with currently available technology. Through these new approaches, maximum results can be obtained on a sustainable basis on the clear water pumping systems of South African mines. …

    nwu-za Repository record for A new approach to ensure successful implementation and sustainable DSM in RSA mines (opens in a new tab)

  16. Developing ESCO procedures for large telecommunication facilities using novel simulation techniques

    … procedures to enable Energy Service Companies (ESCOs) to evaluate DSM potential. Studies in South Africa have shown that 20°/o of the total municipal energy is utilised in commercial buildings. Additional investigations have shown that in the commercial sector approximately 50% of energy is used …

    nwu-za Repository record for Developing ESCO procedures for large telecommunication facilities using novel simulation techniques (opens in a new tab)

  17. An automated solution to facilitate sustainable DSM in the mining environment

    … with the help of energy services companies (ESCOs). The aim is to reduce demand peaks and to promote the efficient use of electricity. These projects can be implemented much faster than building new power stations and are also more cost-effective. In 2008 an accelerated DSM program was …

    nwu-za Repository record for An automated solution to facilitate sustainable DSM in the mining environment (opens in a new tab)

  18. Evaluating the feasibility of a carbon reducing project : a case study in the mining industry

    … measures: carbon tax, Energy Service Companies (ESCOs) and carbon credits. Carbon tax has been implemented in many countries over the last decade with different levels of success. Carbon tax will be implemented in South Africa during 2013/2014. ESCOs have been implemented to assist companies with …

    nwu-za Repository record for Evaluating the feasibility of a carbon reducing project : a case study in the mining industry (opens in a new tab)

Page 1 of 2