A Comparative Study of Production‑Based Earned Value Management (PEVM) and Conventional Earned Value Management (EVM) in Construction Projects
Earned Value Management (EVM) is widely recognized by Project Management Institute and various US government agencies as a recommended method for measuring and analyzing contractor cost and schedule performance and forecasting Estimate at Completion (EAC). However, since the release of …
-
Planning to execution earned value risk management tool
This study presents a proof-of-concept software application capable of producing risk-based estimates for project costs and schedules, tracking project performance against baseline plans, and providing real-time updates for cost and schedule at completion. Current budget and schedule estimation …
-
An Improved Earned Value Management Method Integrating Quality and Safety
… of COVID-19 highlighted the need to improve the Earned Value Management (EVM) method within construction to reflect these quality and safety activities. The central goal of this dissertation is to present an improved EVM method, which is named the Earned Value Construction Management (EVCM) …
-
Alternative Project Management Practices in Earned Value and Black-Scholes
… to two project management techniques, the earned value approach for project performance reporting and the deterministic discounted cash flow analysis in decision making. Both are criticised in the literature due to their inherent deficiencies and inapplicability in practice. Earned value, a …
-
Forecasting cost at completion with growth models and Earned Value Management
… of an S-shaped growth model and combines the Earned Schedule (ES) concepts into its equation to provide more accurate and stable cost estimates. Widely used conventional index-based methods for CEAC have inherent limitations such as reliance on past performance only, unreliable forecasts in …
-
Die Betrachtung der Earned Value Methodik im agilen Projektumfeld hinsichtlich des Projekterfolgs
The Earned Value analysis has proven to be beneficial in waterfall and located software projects for monitoring the project management triangle. Nowadays, more and more virtual and agile project teams are used to manage the software requirements process. However, it remains unclear whether using …
-
Analysis and application of earned value management to the Naval Construction Force
This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing …
-
An investigation of possible discriminating earned value variables in Department of Defense major acquisition program cancellation
… while others are not. The research evaluates earned value (EV) data reported by 12 cancelled MDAPs and compares it to the EV data reported by 12 MDAPs that had significant cost overruns yet were not cancelled (referred to as troubled programs). The study investigates whether there are …
-
Deficient contractor business systems: applying the Value At Risk (VAR) model to earned value management systems
The focus of our MBA project is in Earned Value Management System (EVMS). This MBA project objectively and quantitatively portrays EVMS risk in a way that supports a monetary withhold decision and can withstand push-back (to include litigation) from the defense contractor. The government is …
-
An analysis of Earned Value Management Implementation within the F-22 System Program Office's Software Development
Department of Defense (DoD) use of Earned Value Management (EVM) program control tool has significantly increased in the last ten years. DoD acquisition policy and training promotes EVM as a cost and schedule management tool, tracking the earned value of the work completed per the baseline plan. …
-
EFFECT OF THE EARNED VALUE MANAGEMENT SYSTEM (EVMS) COMPLIANCE REVIEW THRESHOLD INCREASE ON DATA INTEGRITY AND CONTRACTOR PERFORMANCE
… Regulation Supplement (DFARS)-required Earned Value Management System (EVMS) compliance reviews and their effect on contractor Earned Value Management (EVM) performance and data integrity metrics. The primary objective is to determine if the 2015 DFARS deviation, which raised the …
-
A Comparison of Earned Value and Earned Schedule Duration Forecast Methods on Department of Defense Major Defense Acquisition Programs
Earned value management is a project management tool that integrates project scope with cost, schedule, and performance elements for optimum project planning and control. Earned value management is required by the Department of Defense for cost and incentive type contracts equal or greater than $20 …
-
An analysis of the benefits and application of Earned Value Management (EVM) project management techniques for DOD programs that do not meet DOD policy thresholds
… of this research was to demonstrate how Earned Value Management (EVM) principles can be applicable for non-major programs that spend money within the Department of Defense. This Joint Applied Project provided a tailorable EVM approach, both for contracts that do not meet the threshold, …
-
Integración de los metodos last planner® system y earned value management en la construcción de muros anclados con el método “pachamanca”, caso del “edificio multifamiliar liri”, distrito de Pueblo Libre, provincia y departamento de Lima
… de la aplicación combinada de los métodos Earned Value Management (EVM) y Last Planner® System (LPS) en la programación semanal de proyectos de construcción que involucren muros de contención para sótanos; para lo cual, hemos utilizado como base el estudio de “Combined Application of Earned …
-
Propuesta de mejora del control de costos aplicando el Método de Valor Ganado en un proyecto de infraestructura
… La gestión del valor ganado EVM (del inglés Earned Value Management) es probablemente uno de los sistemas más importantes, y al mismo tiempo menos comprendidos de la Dirección de Proyectos. Es importante, porque ha demostrado ser una técnica fundamental de seguimiento y control, y que no ha …
-
Automated Construction Progress Tracking using 3D Sensing Technologies
… exceeds typical manual performance. However, the earned value tracking is the most commonly used method in the industry. That is why the object based automated progress tracking system is further explored, and combined with earned value theory into an earned value based automated progress tracking …
-
A Simulation Based Optimization Approach for Stochastic Resource Constrained Project Management with Milestones
… Cost Resource Constrained Method (TCRCM) and the Earned Value Resource Constrained Method (EVRCM). The TCRCM seeks to minimize the total project cost, including activity and penalty costs due to lateness at project completion, while considering the RCPSP with stochastic activity times and costs in …
-
Software Development and Platform Adoption as Successive Games of Real Options Investment and Valuation
… term research plan for quantifying the cost and earned value of engaging in platform-based software engineering from the perspective of a software product developer adopting a software platform. We have illustrated the adoption decision through two scenarios that exemplify strategic concerns …