Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 14 of 14 for “"Earned value analysis."”
-
An inclusion of value leaks into earned value analysis as a measure of project management
This study originally emanated from the debate on value creation through projects, which has become more prevalent in project management literature in recent times. Earned value analysis, which is widely used to measure and report the performance of project value, does not include the occurrence of …
-
Die Betrachtung der Earned Value Methodik im agilen Projektumfeld hinsichtlich des Projekterfolgs
The Earned Value analysis has proven to be beneficial in waterfall and located software projects for monitoring the project management triangle. Nowadays, more and more virtual and agile project teams are used to manage the software requirements process. However, it remains unclear whether using …
-
Analysis and application of earned value management to the Naval Construction Force
This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing …
-
Progress in Transferable Work-load Projects : Development of a Robust Method for the Evaluation and Forecasting of Distributed Progress
… projets, comme la méthode de la valeur acquise (Earned Value Analysis), Progress Plot, Milestone and Resource slip charts, Concurrent Engineering, peuvent être utilisés. Le problème étudié est lié à l'industrie pharmaceutique où de nouveaux traitements ou médicaments sont développés, et où …
-
Automated Site Data Acquisition for Effective Project Control
… operations that characterize the work progress. Earned Value Analysis (EVA) is being used for reporting work progress and for forecasting project status at completion and at any future time horizon. Critical to its reliable application is accurate and timely data for quantifying the budgeted cost …
-
Automated Spatial Progress Monitoring for Asphalt Road Construction Projects
… to identify schedule deviations and support the earned value analysis often used as the baseline for contractor progress payments. Unfortunately, the current methods for producing these completion percentages are not as correct or time efficient as they should be to enable effective project …
-
Using Monte Carlo Simulation to Evaluate Performance of Forecasting Models in Project Control
… planned and actual performance data: earned value analysis (EVA), earned schedule (ES), non-linear regression Gompertz growth model (NLR-GGM), and the Kalman filter forecasting model (KFFM). These methods are evaluated in terms of forecasting accuracy, timeliness, and stability under …
-
Investigating the performance of the construction process of an 18-storey mass timber hybrid building
… the construction schedule (actual progress), (7) Earned value analysis, and (8) Planned percent complete to study the reliability of weekly work plans relative to construction schedules. All metrics were validated by the senior project manager through a discussion and confirmation of the inputs, …
-
Applying the Principles of Project Management to a Collegiate Automotive Engineering Design Project
… to gather detailed financial data to perform an earned-value analysis and create improved budgets. By understanding income and expense patterns, the Project Manager can create economic forecasts to determine the economic viability of the team. The strategy was successfully implemented and allowed …
-
Integrated carbon emission management for the United Arab Emirates construction industry
… can be integrated into a framework with use of Earned Value analysis and simple in use tools, to provide a holistic evaluation of environmental efficiency in building construction. Findings include that the Construction industry can apply the Integrated CEM Framework and associated models in …
-
Measuring and Visualizing Integrated Project Interface Status
… as CPM (critical path method) scheduling and Earned Value Analysis. To manage these projects and their complex nature, new methods that can detect overloaded interfaces, identify unhealthy relationships between stakeholders and measure engineering progress are needed in addition to the …
-
Evaluating the optimal innovative cost control techniques used in the South African construction industry
… control techniques identified in the study were Earned Value Analysis (EVA), Last Planner System (LPS), 4D Scheduling, Fuzzy Project Scheduling, Integrated critical path and Line of Balance, and Reserve Analysis. Study findings determined that the critical contributors to cost overruns included …
-
The use of project management procedures by construction contractors
… were carried out with 20 project managers. Analysis of the data investigated the use of a number of different project management procedures and identified differences in their use between private and public sector contractors. The results showed that despite tendering for and carrying out …
-
UM INSTRUMENTO DE AVALIAÇÃO DO PROGRESSO FÍSICO DE UM PROJETO
… a project management, focusing on the system of earned value, emphasizing the weekly physical progress of projects using the man hour as its unit of acting measure. After a study of the best theories in the area of Project Management, a bibliographical research was conducted which originated a …