Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 12 of 12 for “"Engineering Estimates"”.

  1. An analysis of spare parts forecasting methods utilized in the United States Marine Corps

    … exist in documenting contractor provided engineering estimates maintained in the Marine Corps Provisioning Files. (2) The current inventory is inadequate and state of the art methods and models should be implemented by the Marine Corps. (3) Contractor-provided engineering estimates tend to …

    nps Repository record for An analysis of spare parts forecasting methods utilized in the United States Marine Corps (opens in a new tab)

  2. Utility cost accounting and market pricing of electricity at the Naval Postgraduate School

    … costs with market pricing methods instead of engineering estimates of consumption for nonmetered users and by streamlining the current invoice processing procedures. Electricity demand curves for each element of the supplier rate structure were constructed from recent consumption data and …

    nps Repository record for Utility cost accounting and market pricing of electricity at the Naval Postgraduate School (opens in a new tab)

  3. Evaluation Of A Residential Retrofit Program In Omaha Nebraska: A Comparison Of Actual Energy Savings With Audit Predictions Using Quantitative Analysis.

    … did induce savings but by much less than the engineering estimates predicted. It is likely that housing characteristics and upgrade measures play a role in inducing consumption savings but homeowner behavior is a stronger factor that influences savings.

    nebraska Repository record for Evaluation Of A Residential Retrofit Program In Omaha Nebraska: A Comparison Of Actual Energy Savings With Audit Predictions Using Quantitative Analysis. (opens in a new tab)

  4. Optimization of small modular nuclear reactor integration at a remote mine site in Canada

    … of design envelope demands was produced based on engineering estimates to represent the anticipated actual nominal and peak demands of the mine, with a focus on preserving characteristic variability on a per-utility basis. The formulation of design envelope optimization was successful in …

    laurentian Repository record for Optimization of small modular nuclear reactor integration at a remote mine site in Canada (opens in a new tab)

  5. Laboratory Study on the Effects of Exit Face Inclination of Critical Gradients

    … and exit face conditions. Current geotechnical engineering does not consider these factors because they are not thoroughly understood. Despite the attempts to better predict critical gradients, methods developed over 70 years ago to model the heave mechanism are used to model failure mechanisms …

    utahstate Repository record for Laboratory Study on the Effects of Exit Face Inclination of Critical Gradients (opens in a new tab)

  6. ASSESSMENT OF ANNULAR FLOW BOILING IN THE CONTEXT OF COMPUTATIONAL FLUID DYNAMICS (CFD) SIMULATIONS, EXPERIMENTS, AND EXISTING CORRELATIONS

    … been used to develop a general but first order engineering estimates-methodology for design of annular flow-boilers and flow-condensers. The first order estimates-methodology, thus developed for annular flow-boiler operations, was used to: (i) make a priori estimates of flow predictions towards …

    mtu Repository record for ASSESSMENT OF ANNULAR FLOW BOILING IN THE CONTEXT OF COMPUTATIONAL FLUID DYNAMICS (CFD) SIMULATIONS, EXPERIMENTS, AND EXISTING CORRELATIONS (opens in a new tab)

  7. Essays in mineral and energy policy

    … implicit abatement cost functions to bottom-up, engineering estimates. A key benefit of this calibration method is that the elasticities are optimized over an entire relevant range of marginal abatement costs whereas other techniques are local approximations. The fourth and final chapter develops …

    colo-mines Repository record for Essays in mineral and energy policy (opens in a new tab)

  8. Link travel time estimation based on connected vehicle probe data

    [ACCESS RESTRICTED TO THE UNIVERSITY OF MISSOURI-COLUMBIA AT AUTHOR'S REQUEST.] Connected vehicle technology is a wireless system to support communication for enhancing safety and mobility. The thesis proposes a single-link connected vehicle probe data (CVPD) model to estimate travel time on urban …

    missouri Repository record for Link travel time estimation based on connected vehicle probe data (opens in a new tab)

  9. Modeling methane emissions from US natural gas operations: national gathering station emission factor development and facility/regional-scale top-down to bottom-up reconciliations

    … and processing sector and reconciling emissions estimates developed using top-down (tracer flux and aircraft) vs. bottom-up (on-site component-level) measurement approaches. In the first study, facility-level CH4 emissions measurements were made at 114 natural gas gathering facilities and 16 …

    colostate Repository record for Modeling methane emissions from US natural gas operations: national gathering station emission factor development and facility/regional-scale top-down to bottom-up reconciliations (opens in a new tab)