Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 240 for “"Eskom"”.

  1. Developing load models for Eskom residential customers

    … and energy efficiency being implemented by Eskom. In addition, it was equally important to understand the dynamics of the load, and the behaviour of customers to these initiatives and to the situation in all sectors. Understanding the load and the behaviour of the customers was achieved …

    nwu-za Repository record for Developing load models for Eskom residential customers (opens in a new tab)

  2. Benchmarking an Eskom divisional quality management system

    … was then conducted to determine if the available Eskom quality management systems were adequately designed to eliminate rework. From the literature survey information it was evident that the company's quality management systems were in place. However, just like the ISO standards, these were …

    nwu-za Repository record for Benchmarking an Eskom divisional quality management system (opens in a new tab)

  3. The exposure of maintenance workers to heat stress within ESKOM

    … to assist with the prevention of heat stress on Eskom maintenance workers. This guideline will assist by addressing factors such as weight loss and cardiovascular conditions of employees exposed to hot environments.

    nwu-za Repository record for The exposure of maintenance workers to heat stress within ESKOM (opens in a new tab)

  4. Real time pricing as a demand side management option for Eskom

    … PRICING AS A DEMAND SIDE MANAGEMENT OPTION FOR ESKOM In the early 80s the South African economy grew at a fairly steady rate, which was echoed by similar growth in the electricity industry. Eskom responded by building more low running cost, coal-fired power stations. Early action needed to be …

    nwu-za Repository record for Real time pricing as a demand side management option for Eskom (opens in a new tab)

  5. Factors causing workplace absenteeism in a selected power station of ESKOM

    … absenteeism in a selected power station in ESKOM. Workplace absenteeism has been a common problem encountered by many organisations and in a selected power station in Eskom, absenteeism in the operating, maintenance and safety departments is causing production problems. The key theory that …

    nwu-za Repository record for Factors causing workplace absenteeism in a selected power station of ESKOM (opens in a new tab)

  6. Measuring the job satisfaction of young engineers at Eskom power stations

    … of writing, South African electricity parastatal Eskom was losing critical skills at an alarming rate at a time in which it battled to supply the country's energy demand (Grindrod, 2008). With electricity demand forecasted to double in the next two decades, the power giant could ill afford loss of …

    nwu-za Repository record for Measuring the job satisfaction of young engineers at Eskom power stations (opens in a new tab)

  7. The extent to which performance management system drives employee productivity at Eskom

    … drives employee performance (productivity) at Eskom. The study adopted a descriptive research design that was conducted at the Eskom Komati Power Station with the key aim of ascertaining the effect of the performance management system (PMS) on employee performance at Eskom. More precisely, the …

    nwu-za Repository record for The extent to which performance management system drives employee productivity at Eskom (opens in a new tab)

  8. Minimising engineering delivery cycle time variability on similar projects: An Eskom Case Study

    Eskom Generation is experiencing high levels of cycle times variabilities on the delivery of similar engineering deliverables within similar project phases and similar plant areas across different power stations. These variabilities of cycle times deprive Eskom power stations the benefit of …

    nwu-za Repository record for Minimising engineering delivery cycle time variability on similar projects: An Eskom Case Study (opens in a new tab)

  9. Exploring the benefits of implementing ISO14001 in Electricity Transmission Utilities : an Eskom study

    … standard to which the Transmission division of Eskom Holdings Limited has certified its EMS to, and the aim of this research was to explore the benefits that are being realised. The study followed a quantitative approach, and a literature study was conducted to explore the relationship between …

    nwu-za Repository record for Exploring the benefits of implementing ISO14001 in Electricity Transmission Utilities : an Eskom study (opens in a new tab)

  10. Factors influencing career advancement of managers of ESKOM in the District of Ngaka Modiri Molema

    … influencing career advancement of employees at Eskom to managerial positions: case study: Ngaka Modiri Molema District. The fundamental goal of the research study was to establish which facto rs drove the career advancement and a critique was unde1taken of the substantial literature on career …

    nwu-za Repository record for Factors influencing career advancement of managers of ESKOM in the District of Ngaka Modiri Molema (opens in a new tab)

  11. Design and optimization of an intermediate heat exchanger in the Eskom advanced high temperature reactor

    The Eskom AHTR forms part of the next generation of nuclear reactors and aims to have a load following capability by storing heat in molten salt. The heat generated in the reactor is removed by Helium gas and should be transferred to the molten salt storage through an intermediate heat exchanger. A …

    nwu-za Repository record for Design and optimization of an intermediate heat exchanger in the Eskom advanced high temperature reactor (opens in a new tab)

  12. A management framework for accelerated development and retention of young engineers : Eskom as a case study

    Eskom Holdings SOC Ltd was in need of a means to optimise their existing engineer training programme in order to accelerate the development of young engineers and improve the retention rate of young engineers in the organisation, thus retaining critical skills and receiving maximum return on the …

    nwu-za Repository record for A management framework for accelerated development and retention of young engineers : Eskom as a case study (opens in a new tab)

  13. Rent-seeking dynamics in South Africa’s Minerals Energy Complex: the political economy of procurement at Eskom

    … Africa’s minerals energy complex (MEC) using Eskom, the country’s national electricity company, as a case study. Recurrent periods of power cuts demonstrate Eskom’s inability to supply reliable electricity to consumers. Meanwhile, the company is heavily indebted and involved in protracted …

    whiterose Download PDF for Rent-seeking dynamics in South Africa’s Minerals Energy Complex: the political economy of procurement at Eskom (opens in a new tab)

  14. The effectiveness of the use of funds in Capital Projects: Case study of Eskom a hedging perspective

    Eskom is currently one of the biggest importers of goods and services in the country. Companies exposed to foreign exchange rate risk should hedge as a mitigation strategy. Eskom hedges all commitments above R150 000 according to their policy. The most common hedging instrument that is used is …

    cape-town Repository record for The effectiveness of the use of funds in Capital Projects: Case study of Eskom a hedging perspective (opens in a new tab)

  15. An assessment of the effectiveness of management review as an ISO 14001:2004 continual improvement element : an Eskom distribution case study

    Eskom Holdings SOC Limited (referred to as Eskom), a public state owned company, is required to continually demonstrate environmental duty of care and report on its environmental performance. In furthering its commitment to sustainable development and in line with environmental compliance of its …

    nwu-za Repository record for An assessment of the effectiveness of management review as an ISO 14001:2004 continual improvement element : an Eskom distribution case study (opens in a new tab)

  16. Delay modelling and synchronisation of telecontrol networks

    Eskom, South A6ica's largest supplier of electricity, uses a vast telecommunication network to control and monitor all operations in remote locations such as substations. As Eskom expanded the electricity network across South Africa, the telecommunications network expanded as well. With changing …

    nwu-za Repository record for Delay modelling and synchronisation of telecontrol networks (opens in a new tab)

  17. Electricity tarrif structure and revenue collection in South Africa : a case study of the greater Mafikeng area

    … economic rates or tariff increases to enable Eskom to achieve the statutory financial performance standard. However, in October 2004, the Mbeki government took the first bold step and allowed Eskom to lead this current phase of building new electricity generation capacity, which it was …

    nwu-za Repository record for Electricity tarrif structure and revenue collection in South Africa : a case study of the greater Mafikeng area (opens in a new tab)

  18. Examining the implementation of quality control procedures in a selected power station

    … is a problem of quality control processes in Eskom South Africa. There have been some continuous unsatisfactory remarks by Eskom directed to contractors due to various reasons such as plant failures and continuous repairing, job not well-done that prompt rework and defects among other quality …

    nwu-za Repository record for Examining the implementation of quality control procedures in a selected power station (opens in a new tab)

  19. Maintenance management for effective operations management at Matimba Power Station

    … Public Enterprises), as an owner and investor in Eskom, is looking at optimising operational excellence within state-owned enterprises like Eskom. Eskom is presently experiencing problems with increased electricity consumption which it cannot meet due to the limited plant capacity it presently …

    nwu-za Repository record for Maintenance management for effective operations management at Matimba Power Station (opens in a new tab)

  20. Energy savings through the automatic control of underground compressed air demand

    The sole electricity supplier in South Africa, Eskom, currently has an electricity supply crisis. The supplier requires additional available electricity urgently, particularly during the evening peak period between 18:00 and 20:00. This electricity shortage is due to a steady increase in the demand …

    nwu-za Repository record for Energy savings through the automatic control of underground compressed air demand (opens in a new tab)

Page 1 of 12