Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 6 of 6 for “"Facility Lifecycle"”.
-
A Comparison of Building Information Modeling (BIM) Use Within the Department of the Air Force (DAF) and the Architecture, Engineering, and Construction (AEC) Industry
… challenges as they manage the DAF’s global facility and infrastructure portfolio. As the demand and cost for construction escalate and the DAF’s Real Property portfolio grows, it is essential for projects to economically generate high-quality acquisitions, decrease facility lifecycle costs, …
-
Informing Complexity: The Business Case for Managing Digital Twins of Complex Process Facilities as a Valuable Asset
… process industry to manage throughout the facility lifecycle. A maturity model is provided to illustrate the stages of digital twin evolution and serves as a tool to help communicate each of the five levels of digital twin maturity achievable in various use cases. An industry analysis …
-
Maintenance strategy decision making leveraging facility past performance data in military dormitories
… is the longest and most expensive portion of the facility lifecycle and accounts for over 60% of all costs. In the O&M phase, facility maintenance accounts for 19% of costs, yet many organizations adopt an ad hoc approach to maintenance planning and decision-making which costs billions of dollars …
-
An Integrated BIM Framework to Support Facility Management in Healthcare Environments
… environment within the healthcare settings facility managers need to ensure that complex systems are working properly. Facility management tasks need to be completed with minimal interference with clinical services. This is often difficult to do because facility information is often stored …
-
A structured, systemic methodology to improve maritime fire safety in machinery spaces
… also only has success if applied into the facility lifecycle during the operational phase. The novelty of applying a structured systemic approach to achieving fire safety during HAZID with a direct link to safety auditing is therefore fundamental to the impact of this thesis.;Within the …
-
Information-augmented building information models (BIM) to inform facilities management (FM) guidelines
… at different points in their operational lifecycle, have different characteristics, rehabilitation cost, maintenance costs, and mission criticality. In the resource-constrained context of higher education Facilities Management (FM), building data for all facilities needs to be integrated …