Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 6 of 6 for “"Facility Plan"”.
-
Cal Poly Pier Master Plan
The Cal Poly Pier (Pier) Master/Facility Plan (FP) document provides the vision of the future for the Pier, a marine science research facility. The Plan facilitates project development and management of the Pier while meeting university and department research goals. Specifically, the FP document …
-
A Study on the Use of Proxy Reservoir Models in Field Development Optimization and Value of Information Problems
… an optimizing model in GAMS to get the desired facility plan. A workflow with these components also allows us to look at the value of buying more information to mitigate uncertainty and the value of incorporating a ‘real’ option of modifying facilities after n years to support initial capital …
-
RELIABILITY EVALUATION OF MICROELECTRONIC DEVICES
… devices and (3) a cost analysis and reliability facility plan.
-
Student achievement and school condition: Examining the relationship in West Virginia's high schools.
… was required to submit a Comprehensive Education Facility Plan (CEFP) for the next ten years to the State School Building Authority in January of 2000, the research used the facility evaluation instruments that were a part of this document. Building condition comprised the three facility …
-
Simulation of an automobile service department
… more complex The relative effect of a manpower plan and a facility plan is difficult to assess, considering all of the possible interactions a service customer's job may have with each; and so, at best it has been an intuitive judgement on the part of a General Motors Service Department advisor, …
-
World class manufacturing during prototyping for production
… process, integrating Enterprise Resource Planning (ERP) system, developing standard operating procedures, continually improving processes and adapting facility layouts, along with assessing ergonomic factors. The management team selected a modular assembly which allowed uncoupling …