  1. ASSESSMENT OF PROJECT RISKS IN FAST-TRACK CONSTRUCTION PROJECTS

    Fast-tracking has been extensively used to respond to demands for reduced construction project delivery times. Unique risks arising from the overlapping of activities can threaten the project. A framework is proposed to assess project risks in fast-track construction projects to better understand …

    unm Repository record for ASSESSMENT OF PROJECT RISKS IN FAST-TRACK CONSTRUCTION PROJECTS (opens in a new tab)

  2. Fast track construction of a research development building for multiple users

    … to provide the reader with an insight into the construction management concepts adopted in a fast track construction project. Problems encountered during construction have also been highlighted to give the reader a realistic feel of the actual proceedings of the project.

    nanyang Repository record for Fast track construction of a research development building for multiple users (opens in a new tab)

  3. Risk management in fast-track projects

    This thesis is about risk management in fast-track construction projects. The aim of the study is to identify the risks in the UAE construction industry, understand how they are dealt with, and propose more effective frameworks for risk management in fast-track construction. A mixed method approach …

    wlv Repository record for Risk management in fast-track projects (opens in a new tab)

  4. Project management for design and build residential projects

    … were used as case studies. It is claimed that fast-track construction, acceptable quality and cost competitiveness are achievable in design and build residential projects. A comparison is made between projects awarded under the two different form of contracts.

    nanyang Repository record for Project management for design and build residential projects (opens in a new tab)

  5. Verification of AASHTO-LRFD Specifications Live Load Distribution Factor Formulas for HPS Bridges

    … unavoidable during the bridge field tests, the Fast Fourier Transform (FFT) was used to filter out these dynamic effect and noise to obtain the static component or “true” data. The distribution factors extracted from these “true” data were compared with the results from AASHTO-LRFD formulas. The …

    ohiolink Repository record for Verification of AASHTO-LRFD Specifications Live Load Distribution Factor Formulas for HPS Bridges (opens in a new tab)

  6. Análise de obras rápidas considerando aspectos de sustentabilidade

    … estratégias baseadas em metodologias como Fast Track Construction, Lean Construction e Engenharia Simultânea, visando atender às exigências de sustentabilidade empresarial. Para isso, foi realizada uma revisão bibliográfica detalhada e aplicado um estudo de caso, no qual soluções inovadoras …

    brazil-uff Repository record for Análise de obras rápidas considerando aspectos de sustentabilidade (opens in a new tab)

  7. Early age strength development of GGBS concrete cured under different temperatures

    … furnace slag (GGBS) has not gained popularity in fast track construction. It is believed to be due to its slower strength development at early age cured under standard curing temperature. The benefits that are obtained when using GGBS in concrete such as economic, sustainability and durability are …

    liverpool Repository record for Early age strength development of GGBS concrete cured under different temperatures (opens in a new tab)

  8. Metaheuristic based soil parameter identification in deep excavations

    … Moreover, acquiring these parameters in a faster method aids in the calibration of the parameters during fast track construction projects. In this study, a finite element based backcalculation is developed through the use of Particle Swarm Optimization algorithm (PSO). The PSO algorithm, …

    metu Repository record for Metaheuristic based soil parameter identification in deep excavations (opens in a new tab)

  9. Mechanical Properties and Microstructural Characteristics of Hydrated BCSA Cement at Extreme Temperatures

    … making it ideal for applications such as fast-track construction and repair. This study presents a comprehensive investigation into the behavior of BCSA cement under a wide range of curing temperatures, with emphasis on early-age strength development, admixture effects, and the use of the …

    arkansas Repository record for Mechanical Properties and Microstructural Characteristics of Hydrated BCSA Cement at Extreme Temperatures (opens in a new tab)

  10. Quantification of risks during feasibility analysis for capital projects

    … for the "go-no go" decision, adopting phased or fast-track construction, etc. Project cost and revenue are evaluated in terms of current and discounted dollars, thereby emphasising the economic effect of time and inflation on net present value which is considered as the decision criterion. The …

    ubc Repository record for Quantification of risks during feasibility analysis for capital projects (opens in a new tab)

  11. Web crippling design of optimised cold-formed channel beams

    … in emergency housing in 2017 alone. The current construction model is failing to deliver efficiently and on time, which may ultimately lead to a large-scale economic crisis. However, since 2010 there has been an increase in productivity as the economy recovered from the 2008 market crash, this …

    northumbria Repository record for Web crippling design of optimised cold-formed channel beams (opens in a new tab)

  12. Best Practices for the Management of Design in Fast Track Industrial Projects

    The fast track project delivery strategy is designed to leverage the ability to execute design, procurement and construction phases simultaneously to substantially reduce the project schedule. The design phase assumes increased importance in fast track projects because design and construction are …

    ohiolink Repository record for Best Practices for the Management of Design in Fast Track Industrial Projects (opens in a new tab)

  13. Seismic Damage-Resistant System for Modular Steel Structures

    Multi-storey modular construction is a new form of construction in New Zealand and involves the on-site stacking of factory-made volumetric units (i.e., modules) used as fitted-out and serviced “building blocks.” Over recent years, modular construction has been gaining increasing popularity …

    auckland-ms Repository record for Seismic Damage-Resistant System for Modular Steel Structures (opens in a new tab)

  14. Analytical method for quantification of economic risks during feasibility analysis for large engineering projects

    … "go-no go" decisions and adopting phased or fast track construction. The method is developed by applying a risk measurement framework to the project economic structure. The risk measurement framework is developed for any function Y = g(X), between a derived variable and its correlated primary …

    ubc Repository record for Analytical method for quantification of economic risks during feasibility analysis for large engineering projects (opens in a new tab)

  15. Integration of Overlapped Design and Construction Stages Through Location-Based Planning Tools

    The overlap of design and construction stages is a current practice in the construction industry, which aims to shorten the project lead time and cost. Apart from the construction industry fragmentation and its difficulties imposed on project management, this type of project faces some additional …

    huddersfield Repository record for Integration of Overlapped Design and Construction Stages Through Location-Based Planning Tools (opens in a new tab)

  16. Numerical modelling of geosynthetic reinforced embankments over soft ground improved with deep cement mixed columns

    Embankment construction for infrastructure projects has increased considerably during the past few decades in coastal and low lying regions where soft clay is common. Geotechnical engineers dealing with foundation design under such site conditions face a real challenge due to the low shear strength …

    uws Repository record for Numerical modelling of geosynthetic reinforced embankments over soft ground improved with deep cement mixed columns (opens in a new tab)