Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 9 of 9 for “"Fast Track Project"”

  1. Best Practices for the Management of Design in Fast Track Industrial Projects

    The fast track project delivery strategy is designed to leverage the ability to execute design, procurement and construction phases simultaneously to substantially reduce the project schedule. The design phase assumes increased importance in fast track projects because design and construction are …

    ohiolink Repository record for Best Practices for the Management of Design in Fast Track Industrial Projects (opens in a new tab)

  2. Parental Monitoring: An Examination of Antecedents and Bidirectional Associations With Child and Adolescent Conduct Problems

    … problems. This study examined data from the Fast Track project, a multisite longitudinal study aimed at the development and prevention of conduct problems in children at-risk for these behaviors. Latent trajectory modeling (LTM) was used to examine growth in parental monitoring from Grades …

    washington Repository record for Parental Monitoring: An Examination of Antecedents and Bidirectional Associations With Child and Adolescent Conduct Problems (opens in a new tab)

  3. Change management with building information modeling : a case study

    … for the efficient delivery of construction projects. Building Information Models (BIM) and the use of parametric modeling provide significant benefits in coordinating changes across different views in a model. However, coordinating changes across several discipline-specific models is …

    ubc Repository record for Change management with building information modeling : a case study (opens in a new tab)

  4. Soil incorporation of bio-solids into arable cropping

    … doctoral study, in collaboration with a parallel fast track project, a improved, shallow injection system has been developed, based on soil mechanics theory and extensive laboratory and field testing. Environmental pollution, in terms of odour and ammonia emissions, may be signicantly reduced …

    cranfield Repository record for Soil incorporation of bio-solids into arable cropping (opens in a new tab)

  5. Testing Bidirectional Contextual Effects of Adolescent Risk Factors on Young Adulthood Outcomes: A Life Course Perspective to Gangs

    … Data for this dissertation came from the Fast Track Project, a multi-site investigation of the development and prevention of conduct problems in a sample of high-risk youth. Given the quasi-experimental design of gang research, I matched gang members to non-gang members using balanced risk …

    south-carolina Repository record for Testing Bidirectional Contextual Effects of Adolescent Risk Factors on Young Adulthood Outcomes: A Life Course Perspective to Gangs (opens in a new tab)

  6. Hybrid numerical simulation and characteristic representation of wind loads on buildings

    … engineering company to stay competitive. Due to fast-track project and higher labor cost, time and cost of a wind tunnel experiment can be impractical when there is a shape change or unavailable laboratory during the design phase. Because the efficiency of time transient CFD simulations is …

    hkust Repository record for Hybrid numerical simulation and characteristic representation of wind loads on buildings (opens in a new tab)

  7. Can a Broader Education Narrow the Gap? Evidence on Non-Academic Features of Schooling

    … study of three assesses mechanisms by which the Fast Track project, a randomized intervention in the early 1990s for high-risk children in four communities (Durham, NC; Nashville, TN; rural PA; and Seattle, WA), reduced delinquency, arrests, and health and mental health service utilization in …

    duke Repository record for Can a Broader Education Narrow the Gap? Evidence on Non-Academic Features of Schooling (opens in a new tab)

  8. Parent Predictors of Social-Emotional Strengths in Kindergartners

    … variables included the Parent Involvement Project Questionnaire-Modified, the Fast Track Project Parent-Teacher Involvement Questionnaire, the Parent Practices Interview, Parental Support for Learning Scale, Trust Scale from the Family-School Relationship Survey, and the Social-Emotional …

    usf Repository record for Parent Predictors of Social-Emotional Strengths in Kindergartners (opens in a new tab)

  9. Categorizing Accelerated Bridge Construction Projects for Improving Decision-Making

    … as ABC, is a methodology that seeks to improve project development of bridges by reducing the overall project schedule and the impact on the traveling public by implementing innovative technologies and strategies in any phase of project development. However, ABC may incur additional direct costs …

    vt Repository record for Categorizing Accelerated Bridge Construction Projects for Improving Decision-Making (opens in a new tab)