Results 1 to 20 of 26 for “"Front-End Planning"”
-
Information Flow to Support Front End Planning
Previous research has demonstrated the value of front end planning as it impacts project performance. This dissertation summarizes the findings of a research project which examined ways to improve information flow through the front end planning process. The front end planning process was carefully …
-
The Supervising Discipline Engineer's (SDE) role in the Front End Planning Process
… Discipline Engineer's (SDE) role in the Front End Planning (FEP) Process is thought to be an important one by engineering managers at an Engineering, Procurement and Construction (EPC) firm. Although FEP and the role of the SDE have been defined independently, the roles of the SDE in the …
-
Case study analysis in support of front end planning on capital projects
… have a higher chance of success when thorough front end planning is performed. Previous research efforts have sought to determine a statistical link between front end planning and the performance metrics for both building and industrial projects. The author of this thesis intends to supplement …
-
The Application of Front End Planning and Special Purpose Simulation Templates to Drainage Tunnel Construction
… (CII) has a best practice under the heading “Front End Planning” (1995) that is meant to ensure that projects are as complete, as optimized, and as certain as possible throughout the project life cycle. In order to demonstrate this, the Project Definition Rating Index (PDRI) was optimized to …
-
Investigating the Effect of Front-End Planning in Fast-Track Delivery Systems for Industrial Projects
… to examine the processes and effectiveness of Front-End Planning. However, very little is known about the impact of the “level” of Front-End Planning to the cost, schedule and change order performance, specifically for Fast-track Delivery Systems for Industrial projects. This study aims to …
-
Quality control of front-end planning for electric power construction: a collaborative process-based approach using systems engineering
… gasoline to electric vehicles and to emerging trends such as artificial intelligence and use of cryptocurrency. However, managing electric utility construction project costs requires that the risk of field change orders (FCOs) during construction be controlled. In the electric power industry, …
-
Planning in the front end of flagship projects post-disaster : a Canterbury earthquake study : a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy in Construction Management at Massey University, Albany, New Zealand
… outcomes and their causes, the researcher intends to understand how planning in the front end affects flagship projects in post-disaster rebuilding. The findings will be used to produce a set of guidelines for the planning of future post-disaster flagship projects. The researcher intends to …
-
CONSTRUCTABILITY ISSUES FOR CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS
… the phases of a construction project including planning, design, and construction stages. Success of constructability implementation can be easily measured by taking into consideration cost and schedule performance. Higher the degree of constructability implementation, the more efficiently a …
-
Developing Benchmarking Metrics for Pipeline Projects in Alberta
… the time and work required through the front end-planning phase of pipeline projects sharply increase due to this fact that pipelines vary in lengths and the products they carried inside. Pipelines need a huge amount of study and design prior to the detailed engineering and construction …
-
ESTUDO DE PRÁTICAS COM ÊNFASE NA ESTRATÉGIA EMPRESARIAL PARA A GESTÃO DE MEGAPROJETOS: O CASO DAS ORGANIZAÇÕES ENVOLVIDAS COM ENGENHARIA E CONSTRUÇÃO
… and analytical statistics. In this way, the Front-End Planning was identified as the mostly applied practice in the industry. Ten main topics were raised to compare the theoretical reference with the organizational practices. From the ten topics, only three presented relevant differences that …
-
Application of systems thinking in reviewing power-infrastructure capital investment in South Africa=Ukusebenzisa umcabangozinhlelo ekubuyekezeni Utshalozimali Olukhulu Lwengqalasizinda Enamandla eNingizimu Afrika.
… from foreign companies, and lack of proper front- end planning. The participants that were subject matter experts in capital power-infrastructure investments linear regression analysis have proven the consistent relationship between scope liquidity and cost variances and further concurred …
-
Integrating project planning objectives as part of sizing battery energy storage systems
… coming years. Two key concerns are at the forefront of entities undertaking these installations. The first is determining the optimal BESS size for a given application. The second is whether this optimal BESS size reflects the goals (referred to as planning objectives in this dissertation) set …
-
A Machine Learning-Based Approach for Predictive Analysis of Cost Growth in Heavy Industrial Construction Projects
The construction industry spends billions of dollars on large-scale projects annually. These projects typically experience cost overruns, which differ across regions. For instance, Alberta's average cost growth is much higher than similar projects in the United States. This study focuses on …
-
The last planner system of production control
… e.g., specialty contractors. This thesis extends system application to those coordinating specialists, both in design and construction, through a series of case studies, one of which also explores the limits of unilateral implementation by specialists. In addition to the extended application, …
-
An Advanced Construction Supply Nexus Model
… resource shortages, design delays, and planning and scheduling deficiencies, all of which result in decreased productivity, cost and time overruns, conflicts, and time-consuming legal disputes. To mitigate the effects of these difficulties, four new prototype systems are created: a …
-
UNCERTAINTY, EQUIVOCALITY AND INTEGRATIVE PRACTICES IN A PRODUCT DEVELOPMENT CONTEXT
… through the ways project teams manage fuzzy front end processes (Khurana and Rosenthal, 1998). However, in spite of substantial research on fuzzy front end processes, the nature of the fuzziness (i.e., uncertainty and equivocality) and the front-end integrative practices are unclear and not …
-
Successful delivery of mega-projects
… studies that provide guidance on the effective planning and execution of megaprojects. Given the enormous amount of capital dollars at stake and the prevailing trend towards poor performance, the Construction Industry Institute initiated Research Team 315 (RT 315), Successful Delivery of …
-
Understanding Applications of Project Planning and Scheduling in Construction Projects
… and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide construction projects appear to give insufficient attention to effective management and definition of project …
-
The Human Factor Imperative Effect on Projects’ Success
… aspect management is scarce; however, a new trend in research began to recognize the critical importance of the human factor, thus, the first part of the eight chapters in the body of this thesis is dedicated to developing in-depth understanding of the human factor effect and identifying …