Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 1 of 1 for “"Gang Operated breaker"”.

  1. Improving Stability by Enhancing Critical Fault Clearing Time

    … enhancement by making a comparison between a Gang Operated (GO) and Independent Pole Operated (IPO) Breaker. An extreme event was considered as a fault scenario for the case study that consisted of three phase fault followed by breaker failure scenario. PSS®E 33.9 software was used to perform …

    usf Repository record for Improving Stability by Enhancing Critical Fault Clearing Time (opens in a new tab)