Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 6 of 6 for “"Gangway."”
-
Maritime claims: gangway to ship arrest: a case study of South Africa and Nigeria.
The arrest of a ship cannot be granted in any court exercising its admiralty jurisdiction if the claimant/plaintiff cannot ascertain that he/she has a maritime claim. Arresting a ship is a unique concept. A maritime claimant who has a maritime claim against a ship could only arrest in an action in …
-
Optimal working conditions of a floatel along an FPSO
… FPSO. The connection is organized by a strike gangway. However, the gangway connection is too weak to carry any loads, as it is meant for the transfer of people, tools, etc. between the two. The only way for this specific set up to work is if the accommodation unit follows the motions of the …
-
Implications of Bunker Consumption Monitoring in Liner Shipping
… DP operators. The survey identified: PMS, PRS, Gangway system, Human Factors, Follow Target and Communication as critical elements. These categories have been arranged in a declining order. Respondents in the interviews then singled out the three most critical elements to include in an …
-
Sannegården waterfront dwellings; Residential qualities and applicaiton of floating housing in Gothenburg
… floating houses will be reached through a common gangway connecting the houses to the mainland. Some of the main residential qualities that have been developed in the dwelling’s design are outside water view, axiality, and proximity to the water itself. A conventional building has also been …
-
La klimax dans l’art antique
Ce travail trouve son origine dans l’étude d’une stèle funéraire exposée aujourd’hui au Musée archéologique d’Apollonia d’Illyrie, sous le numéro d’inventaire 5030. Le relief, exceptionnel à plus d’un titre, montre une descente aux Enfers par le biais d’un accessoire qui tient autant de l’échelle …
-
Innovative hull design for servicing offshore wind turbines
Accessing turbines for maintenance is a key operational issue for an offshore wind farm. Currently there is a 1.5m significant wave height (Hs) limit for the standard “step over” method of transferring personnel to an offshore wind turbine, though this varies with, vessel type, wave period and …