Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 278 for “"Gantt"”.

  1. Platsbaserad tidplanering som analysverktyg till Gantt-schema

    … och effektivitet. Traditionellt används Gantt-schema som den vanligaste metoden för planering av byggprojekt i Sverige. Metoden har dock begränsningar vid visualisering av produktionsflöde, arbetslagskollisioner och platsberoenden. Samtidigt har platsbaserade tidplaneringsmetoder …

    chalmers Repository record for Platsbaserad tidplanering som analysverktyg till Gantt-schema (opens in a new tab)

  2. The Effects of a Modified Gantt Chart Depicting Schedule Risk

    … tool for monitoring a project's schedule is the Gantt chart. The Gantt chart provides information about projected start and end times for each task of a project. A critical limitation of the Gantt chart, however, is its inability to depict uncertainty surrounding the project schedule, or project …

    odu Repository record for The Effects of a Modified Gantt Chart Depicting Schedule Risk (opens in a new tab)

  3. Modelo de Lean Manufacturing basado en el ciclo de Deming y desarrollado en Gantt para incrementar la eficiencia en empresas plásticas

    … Deming y desarrolladas bajo un cronograma de Gantt para la solución del caso y que se desarrollan en este artículo pudiendo servir de guía inicial a otros técnicos que buscan incrementar la productividad de sus procesos en otras fábricas del sector.

    upc-peru Repository record for Modelo de Lean Manufacturing basado en el ciclo de Deming y desarrollado en Gantt para incrementar la eficiencia en empresas plásticas (opens in a new tab)

  4. “Integration with Difference:” Harvey Gantt’s Legacy at Clemson Recontextualized and Resurrected into Architecture

    … Green Clemson's statue near Tillman Hall as "Gantt Circle." Named after Harvey Gantt, the first Black student at the university, it was an initiative pushed by the History Task Force to contextualize the Upstate land grant school's history better. The stonework complements the historical …

    clemson Repository record for “Integration with Difference:” Harvey Gantt’s Legacy at Clemson Recontextualized and Resurrected into Architecture (opens in a new tab)

  5. Design study of MovementSlicer : an interactive visualization of patterns and group meetings in 2D movement data

    … meetings of multiple actors. We argue that Gantt charts have many advantages for understanding the movements and meetings of small groups of moving entities, and present the design of a Gantt chart that can nest people within locations or locations within people along the vertical axis, and …

    ets-quebec Download PDF for Design study of MovementSlicer : an interactive visualization of patterns and group meetings in 2D movement data (opens in a new tab)

  6. On merging sequencing and scheduling theory with genetic algorithms to solve stochastic job shops.

    … and to evaluate chromosomes using probability Gantt charting. The second was a stochastic constrained genetic algorithm to minimize total tardiness and to evaluate chromosomes using simulation. In these two algorithms, the fitness function was altered to a utility function defined as follows: …

    oklahoma-thes Repository record for On merging sequencing and scheduling theory with genetic algorithms to solve stochastic job shops. (opens in a new tab)

  7. A model for colleges of engineering to select a strategic planning methodology and implement a strategic planning process

    … instrument, a planning template, and a Gantt Chart. I designed the preplanning instrument based on six success/fail criteria identified from the research, desired outcomes and outputs of the planning process, and selected planning steps from the Virginia Productivity Center (VPC) …

    vt Repository record for A model for colleges of engineering to select a strategic planning methodology and implement a strategic planning process (opens in a new tab)

  8. PERT as a Management Tool

    … Reporting and Line-of-Balance--are essentially Gantt charts which do not appear to meet the requirements for management control of scheduling. An investigation of PERT is made to see if it will provide additional controls necessary for proper scheduling.

    unt Repository record for PERT as a Management Tool (opens in a new tab)

  9. Measuring the Validity of F.E.A.T.S Using the Apple Tree Projective Drawing with Children Diagnosed with ADHA

    … 26 PPAT’s were evaluated using the FEATS. Linda Gantt and Carmello Tabone created the FEATS to provide clinicians and researchers with a standardized design and a sound scientific method of studying the drawing. The FEATS is an objective, valid and reliable instrument which measures various …

    dominican Repository record for Measuring the Validity of F.E.A.T.S Using the Apple Tree Projective Drawing with Children Diagnosed with ADHA (opens in a new tab)

  10. "A Dream Deferred": The Desegregation and Integration of Clemson Athletics

    … first African-American student, Harvey Gantt, was admitted in 1963, the first African-American athlete did not sign with Clemson until 1969. This thesis assesses the years leading up to athletic desegregation at Clemson University, and explores the alleged barriers to the successful …

    clemson Repository record for "A Dream Deferred": The Desegregation and Integration of Clemson Athletics (opens in a new tab)

  11. The Effectiveness of the Hybrid Graphical Representation Method in Visually Combining and Communicating Logical and Spatial Relationships between Scheduled Activities

    … schedule visualization methods, the Linked Gantt Charts (LGC) and Flowline graphs (FLG), derived from the activity-based and location-based scheduling systems, to help resolve some of their shortcomings by capitalizing on their combined strengths. In order to accomplish the goal of the …

    tamu Repository record for The Effectiveness of the Hybrid Graphical Representation Method in Visually Combining and Communicating Logical and Spatial Relationships between Scheduled Activities (opens in a new tab)

  12. A methodology for parsimoniously structuring a set of activities

    In project or program planning, a Gantt or PERT chart is usually employed as a graphical representation of schedule for activities. Planners utilize this chart in performing analyses such as the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT). Very little effort, …

    vt Repository record for A methodology for parsimoniously structuring a set of activities (opens in a new tab)

  13. The "Bridge Drawing" Used as an Assessment of Chemically Dependent Veterans

    … on the Hayes and Lyons “bridge drawing” and the Gantt (1990) FEATS instrument. There are examples of the scales and the training manual in the study.

    dominican Repository record for The "Bridge Drawing" Used as an Assessment of Chemically Dependent Veterans (opens in a new tab)

  14. Black candidates facing white electorates

    … significant senatorial campaigns (Brooke 1966, Gantt 1990, Braun 1992, Steele 2006, Ford 2006), which have been sourced using newspaper articles, television and radio advertisements, printed campaign literature, internal campaign documents, opinion polls, demographic data, and fifty interviews …

    oxford Repository record for Black candidates facing white electorates (opens in a new tab)

  15. Changing Attachments: The Client-Therapist Relationship and Outcome

    … Attachment to Therapist Scale (Mallinckrodt, Gantt, & Coble, 1995) and the Outcome Questionnaire-45 (Lambert et al., 1996) at baseline and every eighth session. Multilevel linear growth curve analyses showed that secure attachment to therapist increased and avoidant-fearful attachment to …

    maryland Repository record for Changing Attachments: The Client-Therapist Relationship and Outcome (opens in a new tab)

  16. The Palestinian Museum in California: A Fundraising Plan

    … Through literature research, an action plan, and Gantt Chart, the project presented in this document includes initial plans to register the Palestinian Museum as a nonprofit, forge partnerships with other museums, and develops a fundraising strategy for the first three-years of operation.

    usfca Repository record for The Palestinian Museum in California: A Fundraising Plan (opens in a new tab)

  17. OPTIMAL CONTROL OF PROJECTS BASED ON KALMAN FILTER APPROACH FOR TRACKING & FORECASTING THE PROJECT PERFORMANCE

    Traditional scheduling tools like Gantt Charts and CPM while useful in planning and execution of complex construction projects with multiple interdependent activities haven?t been of much help in implementing effective control systems for the same projects in case of deviation from their desired or …

    tamu Repository record for OPTIMAL CONTROL OF PROJECTS BASED ON KALMAN FILTER APPROACH FOR TRACKING & FORECASTING THE PROJECT PERFORMANCE (opens in a new tab)

Page 1 of 14