Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 155 for “"Gantt chart"”.
-
The Effects of a Modified Gantt Chart Depicting Schedule Risk
… tool for monitoring a project's schedule is the Gantt chart. The Gantt chart provides information about projected start and end times for each task of a project. A critical limitation of the Gantt chart, however, is its inability to depict uncertainty surrounding the project schedule, or project …
-
A model for colleges of engineering to select a strategic planning methodology and implement a strategic planning process
… instrument, a planning template, and a Gantt Chart. I designed the preplanning instrument based on six success/fail criteria identified from the research, desired outcomes and outputs of the planning process, and selected planning steps from the Virginia Productivity Center (VPC) …
-
Design study of MovementSlicer : an interactive visualization of patterns and group meetings in 2D movement data
… meetings of multiple actors. We argue that Gantt charts have many advantages for understanding the movements and meetings of small groups of moving entities, and present the design of a Gantt chart that can nest people within locations or locations within people along the vertical axis, and …
-
Dubai Urban Planning 2040: Resource Requirements in the Urban District 5
… resources and budget estimates, and a timeline Gantt chart.
-
The Palestinian Museum in California: A Fundraising Plan
… Through literature research, an action plan, and Gantt Chart, the project presented in this document includes initial plans to register the Palestinian Museum as a nonprofit, forge partnerships with other museums, and develops a fundraising strategy for the first three-years of operation.
-
DEVELOPMENT OF A NEW INTRAOCULAR PRESSURE MEASUREMENT DEVICE: SELF-TONOMETRY DEVICE FOR MONITORING OF INTRA-OCULAR PRESSURE (STOP) FOR GLAUCOMA
… refine the STOP tonometer. We also proposed a Gantt chart for commercialization plans in the future.
-
Implementation of Standardized Mobilization Assessment Tools to Promote Patient Ambulation at Medical Surgical Units
… causal analysis, cost-benefit analysis, Gantt chart, pre & post survey, and flyer education for staff to guide the project implementation. The results are that after the intervention, the compliance of PLOF and CLOF documentation and the number of patients achieving the ambulation goal …
-
ANALYZING THE COSTS TO RECONFIGURE THE U.S. NAVY PLATFORM TO SUPPORT THE SINGLE FUEL CONCEPT - JP5
… determine the cost of reconfiguration. Using a Gantt chart, we show the series of actions that various stakeholders need to take prior to a ship entering the maintenance availability cycle as well as future actions to ensure maintenance is planned, executed, and completed. Since the energy …
-
Impact of Supply Organizational Culture within a Surgical Unit
… anesthesia C-lockers. Resources such as the GANTT Chart, Fishbone Analysis, Budget Analysis, SWOT Analysis, and PDSA Worksheet were utilized to assist the quality improvement team in assessing the microsystem, pinpointing the exact issue, and creating an appropriate intervention for this …
-
Some aspects of scheduling in a group technology manufacturing system
… operator utilisation and work-in-progress. The Gantt chart technique is used to represent the schedule for both machines and operators. An outline of Petrov's heuristic rules for scheduling is described in the thesis and comparisons of the performance of the proposed rule with Petrov's rules III …
-
Implementing Emergency Bedside Backpacks in the NICU to Improve Patient Outcomes
… to determine what steps needed improvement. A Gantt chart was formulated to provide an anticipated time guideline, and process mapping was then completed to act as another planning guideline. A survey of the staff showed conflicting knowledge of what the current emergency protocol entails …
-
Dynamic project management techniques for business intelligence solutions in public policies
… support system that can globally optimize Gantt chart activities based on specific time parameters, allowing public agencies to tailor project timelines according to their unique needs and assumptions. The novelty of this work lies in the employment of dual-annealing algorithms and a …
-
Adapting Critical Chain Project Management to Army Engineer Construction Projects
… the Critical Path Method (CPM) and multi-level Gantt chart planning system for its construction projects. While these methods are well accepted, they are not without their flaws. Research and literature in project management has given weight to several viable alternative options to planning …
-
Cyclo-Static Scheduling of Large Grain Dataflow Algorithms on a Local Area ATAMM Multicomputing Testbed
… (ATAMM), which consists of marked graphs and Gantt chart representations that model the iterative execution of deterministic LGDF algorithms for different values of throughput and computation time. It is postulated that the behavior of these algorithms could be represented by the aggregate …
-
Analyzing Value Networks for Change Decision Making in a Collaborative Environment With a Case Study in Healthcare
… Actors’ value interchanges matrix, Value Gantt chart, Identifying problematic actors flowchart, and Actors’ ease of substitution table. Employing these hybrid analyses, decision makers gain a better understanding of the bottlenecks in the value network, current conditions and contributions …
-
A methodology for parsimoniously structuring a set of activities
In project or program planning, a Gantt or PERT chart is usually employed as a graphical representation of schedule for activities. Planners utilize this chart in performing analyses such as the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT). Very little effort, …
-
Impact Of Critical Path Method (CPM) Of Scheduling On On-Time Completion Of Transportation Projects
… revealed that most state DOTs use CPM along with Gantt chart for scheduling and perceived complexity and risk are used to select projects for CPM schedules. Resident construction engineers indicated that delay before the start of work on the field do not impact the overall duration of the project. …
-
Application of project management tools to assist in the process of developing emergency exercises
… activity/ milestone list, progress diagram, Gantt chart, and activity network. A group of experts in emergency exercise development acted as a source of information on how project management tools could be used in emergency exercise development. This group of experts were given a hands-on …
-
Forecasting the success of megaprojects with Judgmental methods
… is not needed in thiscontext: the master Gantt chart of the tasks with assigned person-hours plus therespective Bill of Materials should suffice for an accurate estimation of the duration andcost of a project. If that was the case then every project would finish on time and on budget– but …
Page 1 of 8