Results 1 to 14 of 14 for “"Grade Uncertainty"”
-
Open-pit mine production scheduling under grade uncertainty
Common challenges associated with grade uncertainty involve failing to meet decisive operational targets, which include (among others) the following: ore tonnage sent to the mill, total metal processed at the mill, blending requirements on ore feed, total waste tonnage mined, maximum allowable …
-
Long-Term Mine Planning in Presence of Grade Uncertainty
… used to extract natural resources. Low cut-off grades and large operations can make open-pit mining profitable. An important challenge is to determine the optimum production schedule. Usually the goal is to maximize the net present value of the project while delivering ore to the plant at full …
-
Efficient Stope Sequencing Optimization Under Grade Uncertainty Using Genetic Algorithms
… with a set of constraints. However, the inherent grade uncertainty, stemming from limited drilling data, arises as a key challenge in mine planning. If not properly managed, this uncertainty can lead to deviations from production targets, and misleading financial expectations of the project, …
-
Block-Cave Extraction Level and Production Scheduling Optimization under Grade Uncertainty
… deterministic ore-body models, which ignore the uncertainty in the geological resources. Grade uncertainty has profound impact on production targets which also impacts the financial expectations of the project. Initial evaluation of a range of levels for starting the extraction of block-cave …
-
Incorporating grade uncertainty in oil sands mine planning and waste management using stochastic programming
… costs. However, spatial variability such as grade uncertainty results in ore tonnage variations, which leads to fluctuations in the quantity of ore to be processed and waste to be managed. If grade uncertainty is not incorporated in oil sands mine planning, it may lead to under- or …
-
RISK CONTROL IN PRODUCTION SCHEDULING BY CONSIDERING VOLUME AND GRADE UNCERTAINTIES IN RESOURCE ESTIMATION
… drilling. Complex host geology with variable grades and geological controls increases difficulty in resource estimation. In these situations, volume (tonnage) and grade are often over- or underestimated, resulting in inaccurate mine plan that leads to costly financial decisions. In this study, …
-
Uncertainty-based mine planning framework for oil sands production scheduling and waste management
… and sustainable mining. In this research, an uncertainty-based mathematical programming framework is developed based on mixed integer linear goal programming (MILGP) model for oil sands production scheduling and waste management. The effect of grade uncertainty on production schedules is …
-
Stochastic optimization approaches to open pit mine planning : applications for and the value of stochastic approaches
… schedule approaches are unable to incorporate grade uncertainty into the scheduling problem formulation and may lead to serious deviations from forecasted production targets. Stochastic mine production schedulers are considered to obtain more robust mine production schedule solutions. The …
-
New integer solution algorithm to solve open-pit mine production scheduling problems, A
… problems modeled with multi capacities, grade blending, grade uncertainty, stockpiles, variable pit slopes, multi destinations and truck hours. It should be emphasized that the blocks will not have any pre-determined destinations based on grades, cycle times, material type or some other …
-
Influência da incerteza dos teores no planejamento de lavra aplicado ao sequenciamento de longo prazo
O mapeamento da incerteza dos teores através de métodos de simulação geoestatística é uma metodologia que está começando a ser amplamente utilizada na indústria mineira. No entanto, o uso correto desse intervalo de incerteza para os processos subsequentes à avaliação de recursos ainda carece de …
-
A novel stope layout optimization based on robust genetic algorithms
… model combined with GAs to account for grade uncertainty and improve the heuristic algorithm efficiency. The first step computes the stope layout uncertainty, the second step creates an average design where feasibility evaluation breeds the initial population, and the third step uses GAs …
-
Novel optimization models for surface and underground mine planning
… heuristic to identify stopes with high grade concentration and the latter uses a greedy heuristic based on dynamic programming to solve the sub-problems and explore the promising stope combinations. Fifth manuscript tailors the greedy heuristic algorithm to poly-metallic mines with …
-
Genetic algorithm framework for stochastic open pit mining optimization problems
… This approach, however, does not consider grade uncertainties. These uncertainties have a significant impact on the NPV and can only be accounted for when modelled as part of the optimization problem. However, modeling these as part of the optimization problem increases the complexities …
-
Multi-zone mine valuation using modern asset pricing (real options) techniques
… development strategies for a satellite low-grade zone, given that current operations are focused on a developed high-grade zone. One strategy, production expansion (parallel development), combines the early development of the low-grade zone with the expansion of project mineral processing …