Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 8 of 8 for “"Ground delay programs"”.
-
Predicting the occurrence of ground delay programs and their impact on airport and flight operations
A flight is delayed when it arrives 15 or more minutes later than scheduled. Delays attributed to the National Airspace System are one of the most common delays and can be caused by the initiation of Traffic Management Initiatives (TMI) such as Ground Delay Programs (GDP). A Ground Delay Program is …
-
PROBLEMS ORIGINATING FROM THE PLANNING OF AIR TRAFFIC MANAGEMENT INITIATIVES
… ability of an airport to accommodate flights, a ground delay program is used to control the rate at which flights arrive at the airport. This prevents excessive congestion at the airport. In this thesis, we discuss several problems arising from the planning of these programs. Each of these …
-
IMPACT ASSESSMENT OF DYNAMIC SLOT EXCHANGE IN AIR TRAFFIC MANAGEMENT
… such as arrival slots and reduce flight delays during Ground Delay Programs. Two of the mechanisms that have been implemented for increasing utilization at resource-constrained airports are those of Compression and Slot Credit Substitution (SCS). SCS is a conditional, dynamic means of …
-
An Analysis of the Relationship Between Traffic Management Initiatives
… types: Miles-in-Trail (MIT) restrictions, Ground Delay Programs (GDP), Airspace Flow Programs (AFP), and Ground Stops (GS). Yearly and regional patterns are investigated to find temporal and geographic tendencies, which are then compared across restriction types. We use various metrics of …
-
A strategic prioritization approach to airline scheduling during disruptions
… resolves these imbalances by implementing the Ground Delay Programs (GDP). In a GDP, the FAA first assigns new arrival slots to the airlines using the Ration By Schedule (RBS) approach, which is an allocation procedure that assigns slots to incoming flights based on a First-Scheduled, …
-
Optimization Models for Speed Control in Air Traffic Management
… and tromboning. These maneuvers serve to delay the arrival time of the flight while also burning additional fuel. On the other hand, if the arrival time was established much earlier, then such delay could be realized by simply having flights fly slower while still at a higher altitude, …
-
Improving Airline Schedule Reliability Using A Strategic Multi-objective Runway Slot Assignment Search Heuristic
… been a constant endeavor, particularly as system delays grow with ever-increasing demand. Airline schedules need to be resistant to perturbations in the system including Ground Delay Programs (GDPs) and inclement weather. The strategic search heuristic proposed in this dissertation significantly …
-
Shaping the Next Generation Air Transportation System with an Airspace Planning and Collaborative Decision Making Model
… slot-exchange mechanisms induced by multiple Ground Delay Programs (GDPs) to permit airlines to improve flight efficiencies through a mediated bartering of assigned slots, and (b) considering issues related to sector workloads, airspace conflicts, as well as overall equity concerns among the …