Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 21 for “"High-rise construction"”.
-
Computer assisted methods selection for high-rise construction
The intention of this thesis is to represent construction methods and resources, determine how their description can be tailored to the project at hand, represent the construction context and key attributes of the design solution, and show how methods and physical description should be linked. …
-
Leveraging radio frequency technology identification for productivity analysis in high-rise construction
… identification technology within various construction sites including asset tracking, inventory management, and on-site security upgrades. Additional construction improvements can be identified in terms of productivity analysis of work crews, material transport, and the overall approach to …
-
Innovation in hybrid mass timber high-rise construction : a case study of UBC’s Brock Commons project
With the advocacy for sustainable construction on the rise, use of timber as the main building material is being championed in large-scale construction projects. While the advancement of engineered timber products is addressing some issues that previously limited the use of wood in high-rise …
-
Quality control and quality assurance in hybrid mass timber high-rise construction : a case study of the Brock Commons
Wood has seen a resurgence recently as a construction material driven by technological advances and a growing concern for the environment. Although an increasing amount of mass timber high-rises are being built all around the world, lack of information and outdated preconceptions are some of the …
-
Tall Timber
From the inception of high rise construction concrete and steel have been the foundation both literally and figuratively of the construction process. As we, a society, become more aware and conscious of the environmental impacts of our built environment we must ask ourselves, are our current …
-
Reclaiming the Right of Way: A New Infill Model for the Urban US A Seattle Case Study
… and greenways, this study explores building low-rise infill housing in the right of way as an alternative density strategy to high-rise construction. Achieved by layering “medieval” fabric over three urban village sites near transit hubs, the proposed interventions tap human-scale, incrementalist …
-
Evaluation of linear-scheduling-based 4D modeling approaches
… these demands, contractors must explore various construction strategies to meet delivery dates. Using existing tools for large-scale horizontal and vertical projects characterized by significant repetition of components, the lack of ease with which alternative strategies can be formulated and …
-
Resource leveling and linear scheduling
… in this thesis. Multilocation projects such as high rise construction, bridges and so forth have special characteristics which should be taken into account in resource leveling procedures - e.g., flow line characteristics should be maintained or a specified location execution sequence must be …
-
Seismic design of outrigger systems for tall buildings
… structural scheme that is commonly used in high-rise construction to increase stiffness and distribute the moment demand within the core to the exterior columns. Despite the on-going use of outrigger structural systems around the world, a formal seismic design procedure for outrigger system …
-
Static and Dynamic Analysis of Framed-Tube Structures
… begins with a review of the developments of high-rise constructions and the methods of analysis of high-rise buildings. Then study is carried out to investigate some special structural problems, such as the shear lag effect in the normal frames, which form the flanges of a "perforated tube" …
-
Residence on the margin of the central business district : a case study of apartment development in the west end of Vancouver, B.C.
… indicates a close correlation between recent high-rise construction and the increasing numbers of persons, in both relative and absolute terms, who form small household units and have few family responsibilities. Such persons are either young adults or elderly retired individuals. In either …
-
A knowledge management tool for method selection and feasibility reasoning
… for the various physical components that comprise a project is central to its successful and timely execution. The selection of appropriate construction method for a given project context is a daunting task given the plethora of available methods, resources, and change in technologies. …
-
Experimental and Analytical Inelastic Behavior of C- and T- Shaped Composite Plate Shear Walls/Concrete-Filled (C-PSW/CF)
… them, ideally suited for core-wall structures in high-rise construction. The steel plates are connected to each other using tie bars that are embedded in the concrete infill and, in some instances, steel-headed stud anchors. This research project was conducted to investigate the cyclic lateral …
-
Lime and Cement Technology: Transition from Traditional to Standardized treatment Methods
… such as roads, bridges, dams, sewers, and high-rise structures. In order to facilitate high-rise construction with cement, masonry units such as commercially produced brick were developed with similar strength and compression characteristics as cement. Historically, lime mortar preparation …
-
Rebuilding Lanna: Constructing And Consuming The Past In Urban Northern Thailand
… These ruins stood alongside the shells of new highrise construction, providing an unwelcome resemblance that put a pall on the hope placed on the new buildings. Both sites, both newly constructed and abandoned, became sources of stories of ghosts and violent crime. I explore how ruins and …
-
Investigating the performance of the construction process of an 18-storey mass timber hybrid building
The use of mass timber in high rise construction is an innovation. Mass timber construction has influential benefits including a lower overall construction time, a lower environmental impact, the use of renewable resource and an improved aesthetics. Despite the mentioned benefits, mass timber is …
-
Causes of Construction Delays for High Rise Buildings: a Quantitative Comparison between the USA and India
High rise buildings are complex, high risk, and multi-contractor projects which make them prone to construction delays. Delays can lead to time overrun, affect the total project duration and the total cost, and could result in litigation. Most construction schedules are deterministic and do not …
-
Planning for Efficiency at Karlatornet
Construction of high-rise constructions has during past decades seen an incremental increase, which is now also evident in the Swedish market with the forthcoming construction of Karlatornet at Lindholmen in Gothenburg. When constructing high-rise constructions new constraints are imposed, …
-
The Seismic Performance of Coupled Reinforced Concrete Walls
… core walls are used commonly in modern building construction as the primary lateral-load resisting system. Common core wall configurations include solid walls in one direction and walls with openings in the orthogonal direction to access elevators or to meet architectural requirements. Therefore, …
-
Cracking Mode And Shear Strength Of Lightweight Concrete Beams
Lightweight concrete is a high performance material with advantages for a myriad of applications. It has the potential to be used in sophisticated structures like prefabricated high-rise construction and architectural icons, to simple low-cost housing and rapidly erected semi-permanent structures. …
Page 1 of 2