Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 9 of 9 for “"Highway overpass"”

  1. Combined Fuzzy and Probabilistic Simulation for Construction Management

    … developed and employed to estimate the cost of a highway overpass project. Second, a hybrid framework that considers both fuzzy and probabilistic uncertainty for discrete event simulation of construction projects is suggested. The application of the proposed framework is discussed using a real …

    alberta Repository record for Combined Fuzzy and Probabilistic Simulation for Construction Management (opens in a new tab)

  2. ADVANCING GREEN STORMWATER INFRASTRUCTURE THROUGH UNIQUE APPLICATIONS, UNDERDRAIN IMPROVEMENTS, AND DESIGN CRITERIA

    … system treating runoff from an elevated highway interchange, which is a unique setting that generates runoff with high energy and pollutant concentrations. Results showed that total suspended solids and total phosphorus concentrations in highway runoff are orders of magnitude greater than …

    marquette Repository record for ADVANCING GREEN STORMWATER INFRASTRUCTURE THROUGH UNIQUE APPLICATIONS, UNDERDRAIN IMPROVEMENTS, AND DESIGN CRITERIA (opens in a new tab)

  3. Lange overspanningen in geprefabriceerd beton: Een onderzoek naar brugoplossingen om langere overspanningen, tot 100 meter, mogelijk te maken in geprefabriceerd beton

    … and railway network. Therefore more and more highways are widened and expanded. These wider highways create a demand for bridges which are suited for longer spans. These bridge solutions should constructed with a minimum of hindrance for other traffic. Rijkswaterstaat, also wishes to reduce …

    delft Repository record for Lange overspanningen in geprefabriceerd beton: Een onderzoek naar brugoplossingen om langere overspanningen, tot 100 meter, mogelijk te maken in geprefabriceerd beton (opens in a new tab)

  4. History, Narrative, and Production in the Cheonggyecheon Reconstruction

    … the project began with the demolition of a highway overpass and transformed the site into a urban stream park, sharing similar design and operational characteristics of a landscape urbanism project. Yet the Cheonggyecheon carries unique cultural, political, and historical dimensions that …

    washington Repository record for History, Narrative, and Production in the Cheonggyecheon Reconstruction (opens in a new tab)

  5. Triangle Park: addressing residual urban space

    … overhead canopy beneath the Interstate-35 overpass provides shelter for pedestrians; a raised walking path enhances an already prominent pedestrian route; and a wooden deck provides opportunities for sitting and lingering. The ability of the design to meet the community’s stated needs and …

    ksu Repository record for Triangle Park: addressing residual urban space (opens in a new tab)

  6. CONTINUOUS AND AUTOMATED REAL-TIME BRIDGE HEALTH MONITOR & DISSEMINATION OF STRUCTURAL RATING FACTORS VIA THE WWW

    … site of HAM-126-0881L, a typical steel stringer highway overpass bridge located along the Ronald Reagan Cross County Highway in Cincinnati, OH. The instrumentation at this site consists of two components: (1) a weigh-in-motion scale, a digital camera, and a suite of 116 high speed gages together …

    ohiolink Repository record for CONTINUOUS AND AUTOMATED REAL-TIME BRIDGE HEALTH MONITOR & DISSEMINATION OF STRUCTURAL RATING FACTORS VIA THE WWW (opens in a new tab)

  7. Návrh konstrukčního řešení dálničního nadjezdu s nevýhodným poměrem délek polí

    Tato bakalářská práce s názvem "Návrh konstrukčního řešení dálničního nadjezdu s nevýhodným poměrem délek polí" se zabývá analýzou problémů vznikajících při návrhu dálničních nadjezdů s nevýhodným poměrem polí. Práce se skládá ze dvou hlavních částí. Obsahem první z nich je teoretická část a …

    cz-tech Repository record for Návrh konstrukčního řešení dálničního nadjezdu s nevýhodným poměrem délek polí (opens in a new tab)

  8. Návrh předpjatého mostu o dvou polích

    Předmětem této bakalářské práce je návrh tří variant přemostění dálnice a podrobnější zpracování vybrané varianty. Zvolenou variantou je jednotrámová předpjatá mostní konstrukce o dvou polích. Rozpětí každého z polí je 26,5 m. Navrhovaný most slouží k převedení silnice III. třídy S6,5/70 přes …

    brno-tech Repository record for Návrh předpjatého mostu o dvou polích (opens in a new tab)

  9. Nadjezd přes dálnici D35 u Vysokého Mýta

    Tato bakalářská práce se zabývá návrhem alternativního řešení mimoúrovňového křížení pozemní komunikace přes nově budovanou dálnici D35 v lokalitě Vysoké Mýto. Cílem práce je volba optimálního typu nosné konstrukce z hlediska prostorového uspořádání i ekonomické efektivity. Jako nejvhodnější …

    cz-tech Repository record for Nadjezd přes dálnici D35 u Vysokého Mýta (opens in a new tab)