Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 7 of 7 for “"Hydrosoil"”.

  1. BIOGEOCHEMICAL PROCESSES IN HYDROSOIL OF PILOT-SCALE CONSTRUCTED WETLAND TREATMENT SYSTEMS DESIGNED FOR TREATMENT OF SELENIUM

    … of this study were: (i) measure and correlate hydrosoil conditions with Se concentrations vertically through the hydrosoil; (ii) investigate Se-accumulating biogeochemical processes (dissimilatory Se reduction and sorption) operating in the hydrosoil; and (iii) evaluate the effect of a nutrient …

    clemson Repository record for BIOGEOCHEMICAL PROCESSES IN HYDROSOIL OF PILOT-SCALE CONSTRUCTED WETLAND TREATMENT SYSTEMS DESIGNED FOR TREATMENT OF SELENIUM (opens in a new tab)

  2. Biogeochemical Processes in Hydrosoil of a Pilot-Scale Constructed Wetland Treatment System Designed for Treatment of Metals

    … and Zn) distribution, and metal fractionation in hydrosoil (sediment and overlying organic detritus) of a free water surface pilot-scale constructed wetland treatment system (CWTS) were investigated to determine treatment processes. Chemical and mineralogical analyses were performed on organic …

    clemson Repository record for Biogeochemical Processes in Hydrosoil of a Pilot-Scale Constructed Wetland Treatment System Designed for Treatment of Metals (opens in a new tab)

  3. Some effects of two phthalic acid esters on the life cycle of the midge (Chironomus plumosus)

    … these PAEs: and to develop a method for using hydrosoil in the chronic exposure of benthic macroinvertebrates to aquatic contaminants. Because PAEs have been found at relatively high concentrations in. hydrosoil, it was desirable to examine the effect of sand and hydrosoil aubstrates on the …

    missouri Repository record for Some effects of two phthalic acid esters on the life cycle of the midge (Chironomus plumosus) (opens in a new tab)

  4. Renovation of Ammonia Contaminated Produced Water Using Constructed Wetlands

    … bacteria when ranges of conditions (e.g. hydrosoil redox and equilibrium ammonia concentration) were met. Vertical tracer tests performed on bench-scale constructed wetlands demonstrated that plant transpiration enhances transport of water and dissolved constituents though the hydrosoil, …

    clemson Repository record for Renovation of Ammonia Contaminated Produced Water Using Constructed Wetlands (opens in a new tab)

  5. PILOT-SCALE CONSTRUCTED WETLAND TREATMENT SYSTEM FOR AMMONIA REMOVAL FROM OIL-FIELD PRODUCED WATER

    … contained wetland plants (Typha latifolia) and hydrosoil in 5-gallon buckets. Single wetland cells were constructed by adding hydrosoil and plants (T. latifolia and Schoenoplectus californicus) to 70-gallon containers. The pilot-scale CWTS included four constructed wetland series, each …

    clemson Repository record for PILOT-SCALE CONSTRUCTED WETLAND TREATMENT SYSTEM FOR AMMONIA REMOVAL FROM OIL-FIELD PRODUCED WATER (opens in a new tab)

  6. Water Quality Guidelines and Water Quantity Analysis with Application to Construction of a Pilot-scale Wetland Treatment System

    … retention time and organic content of the hydrosoil) to be adjusted to promote the conditions needed to achieve maximum removal of COCs by the identified biogeochemical pathways. The pilot-scale treatment system consisted of three series of wetland cells, with four cells in each series. Two …

    clemson Repository record for Water Quality Guidelines and Water Quantity Analysis with Application to Construction of a Pilot-scale Wetland Treatment System (opens in a new tab)

  7. Evaluation of a pilot-scale constructed wetland treatment system for ash basin water

    … a maximum of 10% of CWTS influent entered the hydrosoil and the concentration of trace elements was decreased, the modeling study suggests that removal of trace elements by the surface-flow constructed wetland reactor occurred near the sediment water interface.

    clemson Repository record for Evaluation of a pilot-scale constructed wetland treatment system for ash basin water (opens in a new tab)