Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 10 of 10 for “"Industrial Construction Project"”

  1. Phase-aligned AI framework for industrial construction project management: multi-model synergy & lifecycle data integration

    … Artificial Intelligence (AI) can reshape modern project management practices. With the increasing project complexity and data dependence, traditional management methods struggle to maintain efficiency and adaptability. To address these challenges, this study proposes a stage-aligned AI-driven …

    nanyang Repository record for Phase-aligned AI framework for industrial construction project management: multi-model synergy & lifecycle data integration (opens in a new tab)

  2. Analyzing Scaffolding Needs for Industrial Construction Sites Using Historical Data

    Industrial construction covers a wide range of projects including petroleum refineries, chemical and power plants, which involve several disciplines such as civil, mechanical, and electrical. Different trades often depend on scaffolds to access their work areas. Quantification of scaffold …

    alberta Repository record for Analyzing Scaffolding Needs for Industrial Construction Sites Using Historical Data (opens in a new tab)

  3. Spatial information acquisition and its use for infrastructure operation and maintenance

    … death (or damage to equipment and materials) on construction sites. Also, site modeling is required for realtime applications such as equipment control and as-built data acquisition. Site-modeling methods that are currently in use, including 3D CAD and dense 3D scanning systems, have certain …

    texas Repository record for Spatial information acquisition and its use for infrastructure operation and maintenance (opens in a new tab) Restricted access

  4. BIM-based Motion Planning of Mobile Crane Operation in Modular-based Heavy Construction Sites

    Modular-based construction is becoming increasingly a key role in oil sands development in Alberta, Canada. Modules are generally installed by large-capacity mobile cranes based on one of two lifting options: (1) pick from fixed positions, in which case the crane delivers the payloads from a single …

    alberta Repository record for BIM-based Motion Planning of Mobile Crane Operation in Modular-based Heavy Construction Sites (opens in a new tab)

  5. Impact of Spatial Cognitive Abilities on the Effectiveness of Augmented Reality in Construction and Fabrication

    Modular construction has emerged to help address the challenges posed to the construction industry by stagnant productivity rates and a shortage of skilled labor as it allows for greater automation and for work to be completed in a controlled fabrication shop environment as opposed to on a …

    waterloo Repository record for Impact of Spatial Cognitive Abilities on the Effectiveness of Augmented Reality in Construction and Fabrication (opens in a new tab)

  6. Impact Assessment of Construction Supply Chain Risk Changes on Project Time and Cost

    The supply chain plays a key role in the construction industry. The importance of the Construction Supply Chain (CSC) is not less than that of the onsite construction phases. There are many risk factors that influence the progress of a supply chain, and it is problematic when the probabilities and …

    waterloo Repository record for Impact Assessment of Construction Supply Chain Risk Changes on Project Time and Cost (opens in a new tab)

  7. Hybrid Fuzzy System Dynamics–Fuzzy Agent-Based Modeling of Construction Labor Productivity

    Construction labour productivity (CLP) is a key performance indicator for determining the success of construction undertakings, and notably affects the profitability of construction companies. To this effect, the construction industry and researchers have pursued better ways of addressing the CLP …

    alberta Repository record for Hybrid Fuzzy System Dynamics–Fuzzy Agent-Based Modeling of Construction Labor Productivity (opens in a new tab)

  8. A Data-Driven Decision Support System to Enhance Planning and Scheduling in Industrial Construction Projects

    The planning and execution of industrial construction projects—such as nuclear plants, and oil and gas production facilities—present significant challenges due to their large scale, fast-tracked timelines, and the complexity of managing extensive resources and a workforce. These projects often …

    alberta Repository record for A Data-Driven Decision Support System to Enhance Planning and Scheduling in Industrial Construction Projects (opens in a new tab)

  9. Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints

    Analytical decision support for project scheduling and workface planning under time-dependent resource constraints is limited in industrial-construction. Previous project scheduling research endeavors in the construction engineering and management domain focused on formulating resource-constrained …

    alberta Repository record for Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints (opens in a new tab)

  10. Impact of Best Practices on the Cost and Schedule Performance of Heavy Industrial Construction Projects

    The heavy industrial sector is important to the North American economy, however, projects in this sector are often overbudget and behind-schedule. An improvement in project delivery can positively impact the organizations involved in the heavy industrial sector and subsequently on the economy. …

    calgary Repository record for Impact of Best Practices on the Cost and Schedule Performance of Heavy Industrial Construction Projects (opens in a new tab)