Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 9 of 9 for “"Industrial Mathematics"”.

  1. A Study of Benefits Gained from Industrial Mathematics by Students in the Inglewood Unified School District, Inglewood, California

    In order to study the benefits gained from Industrial Mathematics by the students in the Inglewood Unified School District, something of a geometric approach has been used. Starting from several varied points, an attempt has been made to plot a single “unknown point,” the actual value of Industrial …

    central-wash Repository record for A Study of Benefits Gained from Industrial Mathematics by Students in the Inglewood Unified School District, Inglewood, California (opens in a new tab)

  2. Imaging system for detection, classification and quantification

    … conducted at the Fraunhofer Chalmers Centre for Industrial Mathematics in collaboration with the Fraunhofer-Institut f¨ur Techno- und Wirtschaftsmathematik. The aim of this thesis is to develop an imaging system for the automated detection of holes in images of supermarket shelves. The proposed …

    chalmers Repository record for Imaging system for detection, classification and quantification (opens in a new tab)

  3. Continuous Methods for Elliptic Inverse Problems

    Numerous mathematical models in applied and industrial mathematics take the form of a partial differential equation involving certain variable coefficients. These coefficients are known and they often describe some physical properties of the model. The direct problem in this context is to solve the …

    rit Repository record for Continuous Methods for Elliptic Inverse Problems (opens in a new tab)

  4. Virtual Manikin Controller - Calculating the movement of a human model

    Simulation of assembly line industrial robots has long been an area of great research interest. At Fraunhofer-Chalmers Research Centre for Industrial Mathematics (FCC) a main objective has been to automatically calculate valid motions - solving problems of inverse kinematics, path planning and …

    chalmers Repository record for Virtual Manikin Controller - Calculating the movement of a human model (opens in a new tab)

  5. Automation of Connector Mating to Improve Wire Harness Assembly on Instrument Panel of Trucks

    … of Skövde, and Fraunhofer Chalmers for Industrial Mathematics (FCC). The research was conducted at the Smart Factory Lab at Scania Group. The focus of the experimentation was the instrument panel of the Scania truck, being manufactured at the Oskarshamn factory, due to identified …

    chalmers Repository record for Automation of Connector Mating to Improve Wire Harness Assembly on Instrument Panel of Trucks (opens in a new tab)

  6. Automation of Connector Mating to Improve Wire Harness Assembly on Instrument Panel of Trucks

    … of Skövde, and Fraunhofer Chalmers for Industrial Mathematics (FCC). The research was conducted at the Smart Factory Lab at Scania Group. The focus of the experimentation was the instrument panel of the Scania truck, being manufactured at the Oskarshamn factory, due to identified …

    chalmers Repository record for Automation of Connector Mating to Improve Wire Harness Assembly on Instrument Panel of Trucks (opens in a new tab)

  7. Mathematical modelling of elastoplasticity at high stress

    <p>This thesis is concerned with the mathematical modelling of elastic-plastic deformation in regimes of stress far exceeding the yield stress. Such scenarios are typically encountered in violent impact testing, where millimetre-thick samples of metal are subjected to pressures on the order of the …

    oxford Repository record for Mathematical modelling of elastoplasticity at high stress (opens in a new tab)

  8. Scheduling an Automotive Manufacturing Facility Using Hyper-Heuristics

    Since the automotive crisis of 2008 manufactures world wide have been forced to adopt leaner styles of day to day operation. This study focuses on modelling a real world scheduling problem for a high volume company which plays an integral part of the global supply chain. Two models are considered …

    guelph Repository record for Scheduling an Automotive Manufacturing Facility Using Hyper-Heuristics (opens in a new tab)