Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 4 of 4 for “"Integrated project delivery system."”

  1. Delays and disruptions on construction projects within the public sector integrated project delivery system as an alternative.

    … industry has earned a reputation for poor project delivery, particularly within the public sector. Successful project delivery has been identified as attaining the project objectives with regards to time, cost, quality and scope within the constraints as outlined by the client. Research and …

    ukzn Repository record for Delays and disruptions on construction projects within the public sector integrated project delivery system as an alternative. (opens in a new tab)

  2. The relationship between procurment duration and design-build success in transportation projects

    … the design and construction of transportation projects. As a result, they are adopting more integrated process. Projects that previously used separate steps and parties may now be included in a single Design-Build system. When making a decision between a traditional Design-Bid-Build delivery …

    unm Repository record for The relationship between procurment duration and design-build success in transportation projects (opens in a new tab)

  3. Performance Driven Architecture

    … change development patterns affordable housing projects, along with their limited considerations, continue to create standardized, repetitive developments without any true responsiveness to the end user or surrounding context.We commonly see industries outside of architecture heavily influenced …

    ohiolink Repository record for Performance Driven Architecture (opens in a new tab)

  4. Attitude of Turkish and Middle Eastern architecture engineering construction (AEC) industry toward integrated project delivery (IPD) method

    … industry are inability in completing the projects in schedule or budget, insufficient architectural drawings (according to the owners), inadequacy in decreasing the waste, tremendous energy consumption of buildings and inefficiency in controlling carbon emissions from buildings. …

    metu Repository record for Attitude of Turkish and Middle Eastern architecture engineering construction (AEC) industry toward integrated project delivery (IPD) method (opens in a new tab)