  1. The last planner system of production control

    … of variances. This thesis proposes a control system, the Last Planner system, that causes the realization of plans, and thus supplements project management’s concern for management of contracts with the management of production. The Last Planner system has previously been successfully applied …

    birmingham Repository record for The last planner system of production control (opens in a new tab)

  2. Last Planner System við áætlanagerð : straumlínustjórnun í byggingariðnaði

    … hönnun og afhendingu byggingaframkvæmda og er Last Planner System (LPS) eitt tól til þess. Markmiðið með ritgerðinni var að: - Fjalla um aðferðafræðina LPS við áætlanagerð. - Gera grein fyrir því hvernig aðferðin er notuð í verkefnum. Í ritgerðinni verður farið yfir það hvernig LPS hefur þróast …

    reykjavik Repository record for Last Planner System við áætlanagerð : straumlínustjórnun í byggingariðnaði (opens in a new tab)

  3. Last Planner System – Areas of Application and Implementation Challenges

    In recent years projects have increasingly used Last Planner System (LPS) in building construction. However project managers still struggle with figuring out how the LPS could be applied on their specific projects. One main reason for this struggle is that explicit instructions for systematically …

    tamu Repository record for Last Planner System – Areas of Application and Implementation Challenges (opens in a new tab)

  4. Improving construction processes in Nigeria using the Last Planner System

    … investigation into the implementation of the Last Planner System (LPS) in Nigeria, to improve construction processes within the Nigerian construction industry. LPS is known to be the most developed practical use of Lean Construction. It focuses on minimising the negative impacts of …

    wlv Repository record for Improving construction processes in Nigeria using the Last Planner System (opens in a new tab)

  5. Does Stakeholder ‘Autonomous Agent’ Gaming in the General Economy Affect Last Planner System Performance?

    … affects the performance of LC tools such as the Last Planner System (LPS). Using a qualitative approach, the researcher collected data through personal interviews of 74 participants, spread over eight projects throughout Texas, all of which were built by four construction companies. A …

    tamu Repository record for Does Stakeholder ‘Autonomous Agent’ Gaming in the General Economy Affect Last Planner System Performance? (opens in a new tab)

  6. Implementación de Last Planner System en actividades de concreto armado para proyectos de edificación industrial

    … trabajo tiene como finalidad implementar el Last Planner System en actividades de concreto armado en proyectos de edificación industrial. En los proyectos de construcción se tienen problemas de retraso según lo programado, es decir que se tiene problemas de planificación y a veces se …

    upc-peru Repository record for Implementación de Last Planner System en actividades de concreto armado para proyectos de edificación industrial (opens in a new tab)

  7. Mejorando la eficiencia de proyectos de ingeniería a través de la aplicación de last planner system

    Evaluar el impacto del uso del sistema Last Planner, en el desarrollo de la ingeniería de detalles del proyecto "Contrato integral Sistema de Limpieza de escorias CT por Flotación" de la empresa Codelco Chile, División Salvador.

    bello Repository record for Mejorando la eficiencia de proyectos de ingeniería a través de la aplicación de last planner system (opens in a new tab)

  8. Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction Process Delay

    … of Building Information Modeling (BIM) and Last Planner System (LPS) together to measure the execution time of construction projects. The aim of this study was to determine whether using BIM and LPS together affect construction process delay differently than using BIM or LPS alone. The …

    wku-diss Repository record for Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction Process Delay (opens in a new tab)

  9. Using the last planner system and lean principles to improve workflow in BIM-based building design projects

    … workflow. Other studies have shown that the Last Planner system (LPS) of production planning and control reduces workflow variability during the construction stage of building projects by increasing planning reliability through greater collaboration in the planning of construction tasks and …

    huddersfield Repository record for Using the last planner system and lean principles to improve workflow in BIM-based building design projects (opens in a new tab)

  10. The Impact of the Last Planner System on Construction Project Performance in Terms of Schedule and Cost

    … prevailing project management and control systems. The Earned Value Method (EVM) and the Last Planner System (LPS) are found to be based on MBR and MBM view respectively. According to existing literature, the LPS, as a MBM-based system, is claimed to be more efficient in comparison with EVM …

    tamu Repository record for The Impact of the Last Planner System on Construction Project Performance in Terms of Schedule and Cost (opens in a new tab)

  11. Exploration of Implementation of the Last Planner System of Production Control by Chinese Contractors: A Case Study

    … been made regarding the applicability of the Last Planner System of Production Control (hereafter referred to as LPS) in China, on site exploration effort of LPS implementation in China is still lacking, and subsequently the clear strategies for implementation on site. The thesis presented the …

    tamu Repository record for Exploration of Implementation of the Last Planner System of Production Control by Chinese Contractors: A Case Study (opens in a new tab)

  12. Propuesta de adaptación de Last Planner System para mejorar la gestión de reclamos en postventa de proyectos multifamiliares

    … investigación plantea la adaptación del sistema Last Planner System (LPS) como mecanismo de mejora en la gestión de reclamos del servicio de postventa en edificios multifamiliares. Se desarrolló un estudio de tipo aplicado, con enfoque cuantitativo, sustentado en información real proporcionada …

    lima Repository record for Propuesta de adaptación de Last Planner System para mejorar la gestión de reclamos en postventa de proyectos multifamiliares (opens in a new tab)

  13. Análisis de la productividad de las partidas críticas mediante el criterio last planner system, caso: edificio multifamiliar Eco Design - Perú

    … vigas y losas, mediante la aplicación de Last Planner System en el edificio multifamiliar Eco Design en San Isidro. Para ello, se empleó una metodología de alcance descriptiva y enfoque mixto. En primer lugar, se analizó los conceptos Lean y Last Planner System mediante la revisión de …

    lima Repository record for Análisis de la productividad de las partidas críticas mediante el criterio last planner system, caso: edificio multifamiliar Eco Design - Perú (opens in a new tab) Restricted access

  14. Aplicación de last planner SYSTEM en habilitaciones urbanas para la mejora de la productividad en el proyecto “Residencial Villa Bonita”

    … inicios de ejecución. Con la implementación de Last Planner System, lograremos efectuar unas comparaciones entre cada indicador de las productividades tradicionales versus las gestiones de cada obra con las filosofías Lean Construction. Al implementar Last Planner System se aplicaron en el …

    upc-peru Repository record for Aplicación de last planner SYSTEM en habilitaciones urbanas para la mejora de la productividad en el proyecto “Residencial Villa Bonita” (opens in a new tab)

  15. IMPLEMENTACIÓN DE LAST PLANNER SYSTEM DENTRO DE LA EJECUCIÓN DEL PROYECTO DE INFRAESTRUCTURA EDUCATIVA Nº 50718 - AUSARAY - CCATCA – QUISPICANCHI- CUSCO

    … conceptos y criterios técnicos de la metodología Last Planner System, como una alternativa de solución para una mejor planificación, control y seguimiento en la etapa de ejecución a fin de pretender culminar los trabajos dentro de los periodos estimados en el expediente técnico.

    upc-peru Repository record for IMPLEMENTACIÓN DE LAST PLANNER SYSTEM DENTRO DE LA EJECUCIÓN DEL PROYECTO DE INFRAESTRUCTURA EDUCATIVA Nº 50718 - AUSARAY - CCATCA – QUISPICANCHI- CUSCO (opens in a new tab)

  16. A Seminal Case Study on Application of Last Planner System with Cash Flow Data for Improvements in Construction Management Practices

    A major challenge faced by project managers is balancing the variables of scope, cost, and schedule. Changes in scope usually result in cost/schedule overruns. Variance in either or both of them creates disorder (typically increases) in the estimated or projected time and cost. Therefore, …

    tamu Repository record for A Seminal Case Study on Application of Last Planner System with Cash Flow Data for Improvements in Construction Management Practices (opens in a new tab)

  17. Diseño Metodológico del Last Planner System para la Dirección de Proyectos en el Área Operativa de Servicios Eléctricos de Selin SRL

    … metodológica aplicando las técnicas del método Last Planner System (LPS) en la dirección de proyectos que ejecuta el área operativa de Servicios Eléctricos de Selin SRL. Para esto, se establecieron los niveles de planeación asociados el Sistema Last Planner, mediante la programación maestra, …

    upc-peru Repository record for Diseño Metodológico del Last Planner System para la Dirección de Proyectos en el Área Operativa de Servicios Eléctricos de Selin SRL (opens in a new tab)

  18. Propuesta de metodología para mejorar la planificación y programación en construcciones de redes externas de gas natural usando Last Planner System

    … ello se plantea una base metodológica aplicando Last Planner System a estos proyectos de redes externas de gas natural. En esta investigación se propone una planificación más ordenada que aborda una planificación inicial, planificación intermedia, plan a corto plazo y análisis de resultados. Para …

    upc-peru Repository record for Propuesta de metodología para mejorar la planificación y programación en construcciones de redes externas de gas natural usando Last Planner System (opens in a new tab)

  19. A Process-Based Approach for Integrating the Last Planner System In 4D Modeling for Equipment Workspace Planning in Elevated Urban Highway

    … a detailed 4D model by integrating the Last Planner System (LPS), a LC planning and scheduling technique in a 4D model with multiple LOD's was proposed. The development of this 4D model can help facilitate the reduction of non-physical wastes during the construction phase of elevated …

    concordia

  20. Propuesta de implementación del sistema Last Planner System incluyendo mejoras en la gestión de requerimientos de información en obras de corta duración

    … que la investigación propone el uso del sistema Last Planner System (LPS) para mejorar el seguimiento y control de avance, y la gestión de Requerimientos de Información (RDI), analizando retrospectivamente un proyecto de corta duración del tipo estación de servicio: ENEX Los Domínicos. En este …

    bello Repository record for Propuesta de implementación del sistema Last Planner System incluyendo mejoras en la gestión de requerimientos de información en obras de corta duración (opens in a new tab)