Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 10 of 10 for “"Lead time variability"”.
-
Analysis of setup time reductions at NADEP, North Island, utilizing the SMED approach (Single-Minute-Exchange-of-Die)
This thesis is an analysis of setup time considerations currently employed by the Power Plant Facility at the Naval Aviation Depot, North Island. The system is analyzed within a production context, citing present procedures that adversely affect lead time. To reduce lead time variability, reduction …
-
An experimental investigation: uncertainty in MRP systems
… in this study is that which is caused by variability in the lead time of purchased parts. Experiments are conducted in order to assess the impact of lead time variability, the amount of safety stock buffering, the amount of safety lead time buffering, and the lot-size rule on the average …
-
Analyzing impacts on backorders and ending inventory in MRP due to changes in lead-time, demand variability and safety stock levels
… chain often remains unrecognized. Increased lead-time due to global sourcing represents one of the commonly unrecognized costs. Hence, the simulation model developed in this study demonstrates the impact of lead-time length and variation as well as variation in demand and safety stocks on the …
-
Suitability of MRP II to material planning for component repair at Naval Aviation Depot, North Island.
… of part replacement error, and material lead-time variability in order to make recommendations for success in implementing MRP II. Fifteen percent of requisitions for work-in-process components are between one and two years old. If lead-times are reduced to a maximum of one year, the …
-
Spreadsheet decision support model for training exercise material requirements planning
… and materials, and the anticipated effects of lead times, in determining the net requirement and time period an item must be placed on order to ensure its availability for the training exercise. The capability of this model to enhance planning through what if analysis and the investigation of …
-
Process redesign of the Norwegian Navy Materiel Command's replenishment of inventory items
… on delivery from inventory. Long replenishment lead-time, with variability in both lead-time itself and lead-time demand, make it hard to achieve the desired service level. The lead-time becomes costly, both in form of holding cost of safety stock and in form of stock-outs. Current inventory …
-
Exploration of Stochastic Lead Times Within the Aftermarket A case study at Volvo Service Market Logistics
… business environment, variations in demand and lead time contribute to that many organizations have difficulties in matching supply and demand. To manage uncertainties in demand and supply, many organizations use inventories and safety stocks, where the calculations often neglect variations in …
-
Η επίδραση του διασυνοριακού εμπορίου και της βιωσιμότητας στο στρατηγικό σχεδιασμό διεθνοποιημένων εφοδιαστικών αλυσίδων
… and unpredictable customs’ clearance and service times at ports of entry, along with the subsequent increased emissions generated from transporting cargo over far away production sites can severely undermine the efficiency of offshoring within global supply chain networks. Nearshoring, namely the …