Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 3 of 3 for “"Likelihood of Failure (LOF)"”.
-
Risk-based Renewal Prioritization Models (RPM) for Potable Water Pipeline Infrastructure Systems
… pressures from source to customers. A majority of these pipelines were installed in the mid-twentieth century without adequate financial planning for future renewal, creating a growing renewal backlog under tight budget and operational constraints. Decades of utility data and practice-based …
-
A Risk-Informed Framework for Identifying and Warehousing Critical Spare Parts for Primary Water Mains: A Case Study of the City of Saskatoon
… systems depend on the timely availability of spare parts to support emergency maintenance and repair activities. For large-diameter primary water mains, critical components are often costly, procured from limited suppliers, and associated with long lead times, making inventory shortages …
-
Criticality and Risk Assessment for Pipe Rehabilitation in the City of Santa Barbara Sewer System
… and greater risk to the health and well-being of City residents. Issues can range from pipe blockages in sewer laterals to Sanitary Sewer Overflows. This thesis develops a risk analysis method that can be used by municipalities to maintain and rehabilitate sewer assets. Risk combines the effect …