Showing 1 to 19 of 19 for “"Linear Scheduling"”.

  1. Linear scheduling and 4D visualization

    … 3D CAD software and a software implementation of linear planning that includes the ability to define a project product model and associate it with the process model. Strengths of the approach include the ability to readily modify construction sequences and examine their consequences using 4D CAD, …

    ubc Repository record for Linear scheduling and 4D visualization (opens in a new tab) Download PDF for Linear scheduling and 4D visualization (opens in a new tab)

  2. Resource leveling and linear scheduling

    Resource leveling in the context of linear scheduling has been explored in this thesis. Multilocation projects such as high rise construction, bridges and so forth have special characteristics which should be taken into account in resource leveling procedures - e.g., flow line characteristics …

    ubc Repository record for Resource leveling and linear scheduling (opens in a new tab) Download PDF for Resource leveling and linear scheduling (opens in a new tab)

  3. Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control

    … describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices, are unable to accomplish these two tasks with any …

    iastate Repository record for Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control (opens in a new tab)

  4. Evaluation of linear-scheduling-based 4D modeling approaches

    … that leverages a generalized implementation of linear scheduling coordinated with a 3D building information model to produce 4D images. This approach enables a more generic mapping mechanism between product and process models that works at multiple levels of detail. In this thesis, we compare …

    ubc Repository record for Evaluation of linear-scheduling-based 4D modeling approaches (opens in a new tab) Download PDF for Evaluation of linear-scheduling-based 4D modeling approaches (opens in a new tab)

  5. Extending the range of linear scheduling in highway construction

    Linear Scheduling Method is a powerful graphical scheduling method which is best suited for scheduling projects involving repetitive activities. Highway construction projects are excellent examples of projects displaying repetitive characteristics. The research explores usefulness of linear …

    vt Repository record for Extending the range of linear scheduling in highway construction (opens in a new tab)

  6. An analysis of the use of Linear Scheduling Techniques in the construction industry.

    A construction scheduling technique is presented which is, in many cases, more advantageous, to both the contractor & the owner, than bar charts typically provided by contractors, particularly for projects that are linear in nature or have repetitive activities scheduled in phases (e.g. roads, …

    nps Repository record for An analysis of the use of Linear Scheduling Techniques in the construction industry. (opens in a new tab)

  7. Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects

    <p>By integrating Linear Scheduling Method (LSM) concepts with risk modeling methods and using state-of-the practice contractual risk management, a framework is proposed to manage geotechnical uncertainty in construction projects. LSM provides an effective tool for graphically depicting a …

    iastate Repository record for Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects (opens in a new tab)

  8. Work process : determination of a schedule for the IH 635 state highway improvement using the linear scheduling method, Dallas County

    The Linear Scheduling Method is applied in the scheduling of a Texas Department of Transportation (TxDOT) highway improvement project. The Linear Scheduling Method (LSM) is applied through the use of Microsoft Excel spreadsheets and graphs, and gives a working day schedule output. The data used …

    texas Repository record for Work process : determination of a schedule for the IH 635 state highway improvement using the linear scheduling method, Dallas County (opens in a new tab) Restricted access

  9. An Expert System Integrated with a Bridge Information Management System (BrIMS), Cost Estimating, Deterioration Forecasting, and Linear Scheduling at the Conceptual Design Stage

    … type, forecasting elemental deteriorations, linear scheduling, and estimating construction costs at the conceptual design stage. The proposed methodology comprises a framework to deploy a system that automatically generates conceptual cost estimates by integrating objective functions with …

    ottawa-retro Repository record for An Expert System Integrated with a Bridge Information Management System (BrIMS), Cost Estimating, Deterioration Forecasting, and Linear Scheduling at the Conceptual Design Stage (opens in a new tab)

  10. A process for determining construction contract duration for highway projects

    … repetitive construction items with the linear scheduling method. This is chiefly done by the identification of strategic sequencing options and critical-path-limited scoping of the model.

    texas Repository record for A process for determining construction contract duration for highway projects (opens in a new tab) Restricted access

  11. A FRAMEWORK FOR SPATIO-TEMPORAL UNCERTAINTY-AWARE SCHEDULING AND CONTROL OF LINEAR PROJECTS

    Linear repetitive projects, which are resource-driven in nature, are characterized by a series of repetitive activities in which the resources share the same space either in sequential or parallel manner. The frequent movement of resources over limited shared space needs to be well-planned to avoid …

    mcmaster Repository record for A FRAMEWORK FOR SPATIO-TEMPORAL UNCERTAINTY-AWARE SCHEDULING AND CONTROL OF LINEAR PROJECTS (opens in a new tab)

  12. Offline-Online Multiple Agile Satellite Scheduling using Learning and Evolutionary Optimization

    … degrees of freedom in maneuverability, the scheduling problem has become increasingly difficult than its non-agile predecessors. The AEOS scheduling problem consists of finding an optimal assignment of user-requested imaging tasks to the respective AEOSs in their orbits by satisfying the …

    mcmaster Repository record for Offline-Online Multiple Agile Satellite Scheduling using Learning and Evolutionary Optimization (opens in a new tab)

  13. Optimized hardware accelerators for data mining applications

    … architectures are developed systematically using linear scheduling and projection operations. The obtained architectures are classified based on the size and dimensionality of input datasets, analyzed in terms of speed and area, and compared with previous architectures in the literature. Motivated …

    uvic Repository record for Optimized hardware accelerators for data mining applications (opens in a new tab)

  14. Novel trajectory prediction and flight dynamics modelling and control based on robust artificial intelligence algorithms for the UAS-S4

    … (FDC). Relying on the available UAS-S4 Local Linear Scheduled Flight Dynamics Model (LLS-FDM) at the Laboratory of Research in Active Controls, Avionics and Aeroservoelasticity (LARCASE), a nonlinear FDM was designed based on the Takagi-Sugeno (TS) Fuzzy Logic approach. Simultaneously, the …

    ets-quebec Download PDF for Novel trajectory prediction and flight dynamics modelling and control based on robust artificial intelligence algorithms for the UAS-S4 (opens in a new tab)

  15. Automated Dynamic Scheduling and Factory Layout Optimization for Off-Site Construction

    … and (vi) the lack of a dynamic manufacturing scheduling method capable of responding effectively to changing site demands. These imbalances result in a range of adverse outcomes, including increased project completion time (PCT), workstation idle time (WIT), work-in-progress (WIP) duration, …

    concordia Download PDF for Automated Dynamic Scheduling and Factory Layout Optimization for Off-Site Construction (opens in a new tab)

  16. Optimized Planning and Scheduling for Modular and Offsite Construction

    … research studies have introduced planning and scheduling techniques for modular and offsite construction using Building Information Modeling (BIM) and simulation tools. In this research, a questionnaire survey was carried out in collaboration with the modular building institute (MBI), Niagara …

    concordia Download PDF for Optimized Planning and Scheduling for Modular and Offsite Construction (opens in a new tab)

  17. Optimal scheduling and resource utilization for repetitive construction projects

    … project, moving from one location to the next. Scheduling this type of projects often requires maximizing work continuity for these crews while reducing the project duration and the use of overtime. The main goal of this study is to present the development of novel models for optimizing the …

    uiuc Repository record for Optimal scheduling and resource utilization for repetitive construction projects (opens in a new tab)

  18. Risk management of repetitive construction projects

    … resource utilization with its stochastic scheduling in repetitive construction projects. To achieve this goal, the research objectives of this study are to develop: (1) a novel scheduling model for both serial and non-serial repetitive construction projects to quantify the impact of any …

    uiuc Repository record for Risk management of repetitive construction projects (opens in a new tab)