Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 23 for “"Logistics, Naval."”.
-
Logistics support of naval expeditionary units
This project is an assessment of the NAVCENT logistics system as it relates to support of naval expeditionary units such as Naval Construction Forces (NCF), Naval Special Warfare (NSW) forces, Explosive Ordnance Disposal (EOD) units, and Fleet Hospitals. Based on literature from strategic …
-
The costs and benefits of high speed vessels relative to traditional C-17 military airlift
This cost-benefit analysis conducted on behalf of MSC compared HSVs against C-17 aircraft. Using financial and operational data garnered from the WestPac Express, as well as third-party research, the researchers investigated the following questions: Is the HSV a better choice for intra-theater lift …
-
Multivariate analysis of the effect of source of supply and carrier on shipping times for issue priority group one (IPG-1) requisitions
The objective of this thesis is to examine the effects of source of supply and carrier on shipping times of high-priority requisitions to primary destinations of Navy units in the Pacific Theater and Persian Gulf. Our focus was primarily on determining whether source of supply, carrier, and the …
-
An analysis of logistics response times for requisitions of naval aviation repairable items
… of the United States Navy supply system. The Naval Inventory Control Point (NAVICP) uses the Uniform Inventory Control Program to compute safety levels for each of the stock items they maintain. To assist in computing these levels, NAVICP aggregates repairable items based on demand and cost. …
-
Analysis of the Head of the Contracting Activity (HCA) oversight responsibilities within the Naval Supply System Command (NAVSUP)
… (HCA) oversight responsibilities within the Naval Supply Systems Command (NAVSUP). Statutes as implemented by the Federal Acquisition Regulation (FAR) (and lower level regulations) mandate the oversight responsibilities of the HCA. This responsibility is further delegated in NAVSUP …
-
Supportability for the V-22 Osprey
… support plan in the form of Performance Based Logistics versus a traditional government supportability plan is measured in readiness. Impacts to cost over the lifecycle of the weapons system are measured in flying hours per dollar.
-
Cost benefit and capability analysis of Sea-Base connectors
S) cost of the connectors studied is used along with specific performance data such as maximum payload (in tons), maximum speed (in knots) when loaded to maximum payload, and maximum range (in nautical miles) when operated at maximum payload and maximum speed to obtain a number of comparative …
-
An evaluation of contract termination models for secondary items in long supply
… used in the Chapman Termination Model and the Naval Supply Systems Command's termination model are evaluated in an attempt to determine the feasibility of using each in a working environment at the Navy Aviation Supply Office. The Chapman Termination Model is determined to be an unsuitable …
-
Optimizing operational and logistical planning in a theater of operations
… United States Navy (USN) as well as other allied naval forces deploy their ships worldwide to support and conduct various maritime missions ranging from humanitarian aid to combat. In order to accomplish these missions and maintain a sustained deployment it is paramount to establish a robust means …
-
An analysis of the requisition process and readiness for F/A-18E/F Integrated Readiness Support Team (FIRST) program
Naval Aviation is beginning a transformation into a new era of logistics support. The beginning of a U.S. Navy/Industry teaming effort started with the U.S. Navy's F/A-18 E/F program. The new aircraft is supported through both standard military logistics programs and a brand new commercial …
-
Littoral Combat Ship (LCS) manpower requirements analysis
The Littoral Combat Ship's (LCS) minimally manned core crew goal is 15 to 50 manpower requirements and the threshold, for both core and mission-package crews, is 75 to 110. This dramatically smaller crew size will require more than current technologies and past lessons learned from reduced manning …
-
Optimizing global Combat Logistics Force support for sea base operations
… number of, and designs for, ships in the Combat Logistics Force (CLF), and then plan how to use them to provide logistical support to our Carrier Strike Groups, Expeditionary Strike Groups, and Seabasing platforms engaged in any variety of worldwide conflicts. CLF ships are very expensive to …
-
Analysis of high-speed vessels for Seventh Fleet logistics support
Commander, Logistics Group, Western Pacific (COMLOGWESTPAC) is concerned with the delivery of high priority material, ordnance, and passengers to U.S. Navy ships due to a very large operations area and limited Combat Logistics Force (CLF) assets. High-speed vessels (HSVs) may have the potential to …
-
An optimization model for Sea-Based Logistics Supply System for the Navy and Marine Corps
… difficulties when sustaining forces from logistics bases ashore. For example, advancing the Army and Marines to Baghdad in OIF consumed large amounts of fuel and ammunition. The resupply could not replenish supplies and an operational pause began on 29 March, 2003. In order to prevent …
-
Requirement analysis framework of naval military system for expeditionary warfare
… systems, there is a need to develop a new naval logistic asset that can respond to global missions effectively. This development is based on the requirement which must be satisfice-able within the budgetary constraints, address pressing real world needs, and allow designers to innovate. …
-
Simulation of Naval Student Flow Using Pipeline Management Model
The U.S. Navy's training system is an extensive, complex system of interrelated and interacting components. This paper presents the results of several approaches to the problem of modeling this system and developing computer programs to simulate and analyze its operation. Two programs using …
-
A Heuristic Approach for the Scheduling of Technical Training Courses in the U.S. Navy
… courses are labor intensive throughout the Naval Education and Training Command. The major constraints affecting this scheduling are planned input requirements and the suitability/availability of instructors, equipment, and facilities. An additional constraint is that schedules must be …
-
The effect of leadtime on effectiveness at Naval Supply Center, Oakland, California
The area of research was to determine a mathematical relationship between the leadtimes of replenishment requisitions and the subsequent net effectiveness of the corresponding items at a military inventory stock point. This thesis determined that leadtime did not predict actual net effectiveness …
-
Evaluation of aircraft turbine redesigns
… an analysis procedure for detecting changes in logistics parameters. The data for this report come from aviation organizational level maintenance activities and squadrons. The thesis reached the conclusion that the effects of CIP are more effectively assessed at the component level rather than …
-
Simulation of Naval Training Pipelines
Flow of enlisted Navy men through basic training, BEE school and "A" school was simulated using SLAM. Queuing for courses, pass, setback and failure of students, and the limitation of resources in the BEE schools were modeled for variable numbers of "A" courses and enlisted student ratings. A …
Page 1 of 2