Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 10 of 10 for “"Long Term Bridge Performance Program"”.

  1. Temperature Effects on Integral Abutment Bridges for the Long-Term Bridge Performance Program

    The Long-Term Bridge Performance (LTBP) program was started by the Federal Highway Administration (FHWA) in 2009 to gather high-quality data on a collection of typical bridges over a twenty-year period of time. The goal of this program is to create databases of high quality data acquired through …

    utahstate Repository record for Temperature Effects on Integral Abutment Bridges for the Long-Term Bridge Performance Program (opens in a new tab)

  2. Dynamic Testing for a Steel Truss Bridge for the Long Term Bridge Performance Program

    … of the Federal Highway Administration the Long Term Bridge Performance Program (LTBP) selected Minnesota Bridge number 5718 as a pilot bridge for evaluation. This program focuses on the monitoring of bridges for a 20-year period to understand the structural behavior over time due to the …

    utahstate Repository record for Dynamic Testing for a Steel Truss Bridge for the Long Term Bridge Performance Program (opens in a new tab)

  3. Dynamic Testing and Finite Element Modeling of a Steel Girder Bridge for the Long-Term Bridge Performance Program

    The Long-Term Bridge Performance (LTBP) Program, under the direction of the Federal Highway Administration’s (FHWA’s) Office of Infrastructure Research and Development, is monitoring nation’s pilot highway bridges to promote the safety, durability, and reliability on the bridges of the nation. …

    utahstate Repository record for Dynamic Testing and Finite Element Modeling of a Steel Girder Bridge for the Long-Term Bridge Performance Program (opens in a new tab)

  4. The Utah Pilot Bridge, Live Load and Dynamic Testing, Modeling and Monitoring for the Long-Term Bridge Performance Program

    As part of the Federal Highway Administration's Long-Term Bridge Performance Program, Live Load and Dynamic tests were conducted. A long-term monitoring plan was developed and presented for the Utah Pilot Bridge based on Live Load and Dynamic tests. As one of seven pilot bridges, the Utah Pilot …

    utahstate Repository record for The Utah Pilot Bridge, Live Load and Dynamic Testing, Modeling and Monitoring for the Long-Term Bridge Performance Program (opens in a new tab)

  5. Live Load Test and Finite Element Model Analysis of a Box Girder Bridge for the Long Term Bridge Performance Program

    The Long Term Bridge Performance (LTBP) Program is a 20-year program initiated by the Federal Highway Administration to better understand the behavior of highway bridges as they deteriorate due to environmental variables and vehicle loads. Part of this program includes the periodic testing of …

    utahstate Repository record for Live Load Test and Finite Element Model Analysis of a Box Girder Bridge for the Long Term Bridge Performance Program (opens in a new tab)

  6. Live-Load Testing and Finite-Element Analysis of a Steel Cantilevered Deck Arched Pratt Truss Bridge for the Long-Term Bridge Performance Program

    The Long Term Bridge Performance (LTBP) program is an organization within the Federal Highway Administration that inspects, tests, analyzes, and observes, for an extended period of time, a variety of bridge types throughout the United States. Part of the program includes periodic testing of select …

    utahstate Repository record for Live-Load Testing and Finite-Element Analysis of a Steel Cantilevered Deck Arched Pratt Truss Bridge for the Long-Term Bridge Performance Program (opens in a new tab)

  7. Dynamic Testing, Finite Element Modeling, and Long-Term Instrumentation of a Box Girder Post-Tensioned Bridge for the Long-Term Bridge Performance Program

    As part of the Long-Term Bridge Performance (LTBP) program, a flagship research program funded by the Federal Highway Administration in response to the aging bridge network, the Lambert Road Bridge near Elk Grove California was selected as the California Pilot bridge set to undergo non-destructive …

    utahstate Repository record for Dynamic Testing, Finite Element Modeling, and Long-Term Instrumentation of a Box Girder Post-Tensioned Bridge for the Long-Term Bridge Performance Program (opens in a new tab)

  8. Influence of Bridge Parameters on Finite Element Modeling of Slab on Girder Bridges

    The present study is part of the Long Term Bridge Performance Program (LTBP) funded by the Federal Highway Administration. The objectives of this program are to create a comprehensive database of quantitative information of the long-term performance of selected pilot bridges and to develop a …

    vt Repository record for Influence of Bridge Parameters on Finite Element Modeling of Slab on Girder Bridges (opens in a new tab)

  9. Dynamic Testing and Modeling of a Superelevated Skewed Highway Bridge

    … aging infrastructure in the United States, the Long Term Bridge Performance Program (LTBPP) under the Federal Highway Administration (FHWA) proposes to assess the long-term performance of representative bridges through nondestructive evaluation (NDE) techniques and visual inspection. For …

    vt Repository record for Dynamic Testing and Modeling of a Superelevated Skewed Highway Bridge (opens in a new tab)

  10. Live Load Testing and Analysis of the Southbound Span of U.S. Route 15 over Interstate-66

    … The Federal Highway Administration's (FHWA) Long-Term Bridge Performance (LTBP) Program has been developed to help bridge stakeholders make the best decisions concerning the allocation of these funds. This is done through the use of high quality data obtained through numerous testing …

    vt Repository record for Live Load Testing and Analysis of the Southbound Span of U.S. Route 15 over Interstate-66 (opens in a new tab)