Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 46 for “"Long lead time"”

  1. An alternative method of long lead-time tool purchases

    … Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2002.

    mit Repository record for An alternative method of long lead-time tool purchases (opens in a new tab)

  2. Oceanic-Atmospheric and Hydrologic Variability in Long Lead-Time Forecasting

    … as predictors was investigated to improve the long lead-time (three to nine months) forecast of streamflow and snowpack. Singular Value Decomposition (SVD) analysis was used to identify a region of Pacific and Atlantic Ocean SSTs and a region of 500 mbar geopotential height (Z500mb) that were …

    utk-theses Repository record for Oceanic-Atmospheric and Hydrologic Variability in Long Lead-Time Forecasting (opens in a new tab)

  3. Spare parts provisioning decision support model for long lead time spares

    … indirect and direct cost that comes from storing long lead time spares. A combined Monte-Carlo and Genetic Algorithm based optimization approach to finding the optimal spare parts storage strategy is proposed. In this study, the indirect and direct cost of having a spare part in the storage …

    alberta Repository record for Spare parts provisioning decision support model for long lead time spares (opens in a new tab)

  4. Modeling and centralization of strategic inventory for repairable and long lead-time spare parts

    … an optimal inventory model for repairable and long leadtime spare parts for an Engine overhaul business. In addition, it presents a business case for centralization of inventory. Pratt & Whitney purchased the Norway Engine Center (NEC) in 2000. Two new engine centers, the Shanghai Engine Center …

    mit Repository record for Modeling and centralization of strategic inventory for repairable and long lead-time spare parts (opens in a new tab)

  5. A study of the reduction of simulation modeling development time

    … for example, the concept of treating the time that is spent in production activities as lead-time, and the feasibility of reducing the lead-time through different mechanisms, which are presented in a framework [44]. One of the main obstacles in developing simulation model is time. …

    ut-knoxville Repository record for A study of the reduction of simulation modeling development time (opens in a new tab)

  6. Atmospheric /oceanic climatic influences for improved water management

    … on continental U.S. streamflow, based on the long-term phase (warm / positive or cold / negative) of the interdecadal variable, were identified using nonparametric statistical testing. Next, sea surface temperature variability in the Pacific and Atlantic Oceans, and the resulting continental …

    unlv Repository record for Atmospheric /oceanic climatic influences for improved water management (opens in a new tab)

  7. Material Coefficient of Thermal Expansion Investigation for Use in Additive Manufacturing Fused Deposition Modeling for Composite Tooling

    … quality repair, however, tooling generally has a long lead time. Additive manufacturing could be used to manufacture rapid tooling to create tooling for composite repairs. The issue is that polymer printed tooling has a much higher coefficient of thermal expansion (CTE) than the composites that …

    usm Repository record for Material Coefficient of Thermal Expansion Investigation for Use in Additive Manufacturing Fused Deposition Modeling for Composite Tooling (opens in a new tab)

  8. Multi echelon supply chain design for Amazon private brands

    … sourcing larger quantities to account for long-lead time between production runs and high variability in demand to maintain competitive costs.

    mit Repository record for Multi echelon supply chain design for Amazon private brands (opens in a new tab)

  9. Demand forecasting for job order products in highly technological and emerging industries

    … may not be readily available or may involve a long lead time. Developing a demand forecasting model which accurately projects the needs of components for a company can decrease costs while decreasing overall lead times of final products. This demand forecast model takes into account projected …

    texas Repository record for Demand forecasting for job order products in highly technological and emerging industries (opens in a new tab)

  10. Effects of responsiveness on supply chain management

    … the suppliers with fair price, high quality and timely delivery. Late delivery or long lead time may result in both lost sales and loss of goodwill. Effects of Responsiveness on Supply Chain are important, but surprisingly have seldom been pursued in literature. In this paper, we study this issue …

    hkust Repository record for Effects of responsiveness on supply chain management (opens in a new tab)

  11. Strategic raw material inventory optimization

    … alloys are capital intensive and require long lead-times in order to bring new capacity online. The combination of these factors often results in an inflexible titanium alloy raw material supply chain for Pratt & Whitney. At the same time, Pratt & Whitney experiences a variety of rare but …

    mit Repository record for Strategic raw material inventory optimization (opens in a new tab)

  12. MICROLAN file transfer program for microprocessors

    … networking. Both Local Area Networks and long-haul networks presently exist, but they are either very expensive or hardware dependent. It would normally require a long lead time and high costs for the military to acquire an information transfer system. To provide a readily available, …

    nps Repository record for MICROLAN file transfer program for microprocessors (opens in a new tab)

  13. River ice breakup forecasting using artificial neural networks and fuzzy logic systems

    … consequent flooding, especially when some lead-time is needed. In most northern regions, the sparse network and short record of data have impeded the successful development of empirical and statistical models. In this study, a multi-layer modeling approach was investigated for forecasting …

    alberta Repository record for River ice breakup forecasting using artificial neural networks and fuzzy logic systems (opens in a new tab)

  14. Job satisfaction among United States Navy and Marine Corps Aviation Officers - a study of the impact on career retention

    … the services in recent years. In robust economic times all branches of the armed forces face the challenge of retaining sufficient highly-trained volunteers. The aviation community is disproportionately affected due to the long lead time associated with aviation officer training and the potential …

    nps Repository record for Job satisfaction among United States Navy and Marine Corps Aviation Officers - a study of the impact on career retention (opens in a new tab)

  15. Optical correction of space-based telescopes using a deformable mirror system

    … offer the potential to reduce the high cost and long lead time associated with manufacturing mirrors for spaced-based telescopes by allowing lighter materials to be substituted. These lighter materials lack the optical performance of traditional space-based mirrors. Deformable mirrors could be …

    nps Repository record for Optical correction of space-based telescopes using a deformable mirror system (opens in a new tab)

  16. Simulation-Based Decision Support System for Cell Therapy Manufacturing and Supply Chain

    … remains unattainable for most patients, with a long lead time and low production capacity. This Ph.D. thesis will describe the development and application of an agent-based simulation platform that can create digital representations of a single or multi-network of manufacturing facilities …

    gatech Repository record for Simulation-Based Decision Support System for Cell Therapy Manufacturing and Supply Chain (opens in a new tab)

Page 1 of 3