Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 11 of 11 for “"Long-Term Mine Planning"”
-
Long-Term Mine Planning in Presence of Grade Uncertainty
… profitable. An important challenge is to determine the optimum production schedule. Usually the goal is to maximize the net present value of the project while delivering ore to the plant at full capacity. The best production plan would require complete knowledge of the orebody and all other …
-
Predictive model for long term mine planning using sensor based bulk ore sorting technology for a porphyry deposit
Efficient mine planning is essential for optimizing resource recovery, operational efficiency, and sustainability in modern mining. This thesis investigates the application of MineSense’s ShovelSenseTM technology, a bulk sensor-based sorting (SBS) system, in enhancing long-term mine planning for a …
-
Stochastic optimization of strategic mine planning of a hypothetical copper deposit through a parametrizable algorithm
To perform a surface mine planning it is necessary to start from an initial evaluation of the mineral resource. The open pit schedule evaluation is a key step in the process of planning the extraction activities of a mining company. Traditional approaches applied to define the ultimate pit limit …
-
Geostatistical Modeling for Grade Control and Long Range Models
… in the unsampled volume. The success of a mine is dependent on accurate grade control. The grade control process establishes the final planned destination of mined material, directly influencing the operation’s profitability. Mistakes at this stage are costly and irreversible. Resource …
-
An Integrated Optimization Model for Strategic Open-Pit Mine Planning and Tailings Management
A strategic mine planning model determines the best order of extraction and destination of material over the mine-life, in a way that maximizes the net present value of the produced minerals. In case of oil sands open-pit mining, further processing of the extracted oil sands generates massive …
-
Establishing Total Airflow Requirements for Underground Metal/Non-metal Mines based on the Diesel Equipment Fleet
… requirements for modern, mechanized underground mines have been based upon the power of the diesel equipment fleet, with a multiplier (determined from empirical data collected and compiled over a long period of time or required by regulations) being applied in order to determine the total airflow …
-
Efficient Stope Sequencing Optimization Under Grade Uncertainty Using Genetic Algorithms
Long-term mine planning refers to the optimization of strategies to exploit ore from a deposit efficiently and economically. It indicates which part of the orebody to extract, when to extract it, and where to send it in a way that the profitability of the operation is maximized, while complying …
-
The simulation of material types in a Western Australian iron deposit
… are currently used by mining companies to determine a resource model of the tonnage and head grade that may be obtained from a potential orebody, making it one of the first and most vital operational stages in any mining project. Currently long term mine planning is based on the estimated …
-
Block-Cave Extraction Level and Production Scheduling Optimization under Grade Uncertainty
… smaller volume of waste to be moved and handled. Planning of caving operations poses complexities in different areas such as safety, environment, ground control, and production scheduling. As the mining industry is faced with more marginal resources, it is becoming essential to generate production …
-
Apport des modèles géo-métallurgiques et de la catégorisation des ressources à la définition de la fosse ultime d'une mine à ciel ouvert : Application à la mine de cuivre de Mantos de la Luna au Chili
… du gisement.Les unités géo-métallurgiques sont déterminées par une combinaison des principaux paramètres géologiques, type de roche, altération, minéralisation, etc. Chaque unité présente un comportement différent au processus de traitement métallurgiques avec des caractéristiques de récupération …
-
Diseño de fases de minado mediante el algoritmo Lerchs–Grossmann para maximizar el valor económico de una operación minera a tajo abierto del norte del Perú
… algoritmo Lerchs–Grossmann (LG) en una operación minera a cielo abierto del norte del Perú. La situación identificada radica en que las fases generadas con un software comercial convencional de planificación minera presentan limitaciones geométricas que restringen la recuperación del valor …