Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 1 of 1 for “"Long-term Water Recovery"”
-
An Integrated Workflow to Analyze Pre-fracturing Test and Post-fracturing Production Data and to Characterize Unconventional Reservoirs
… reservoirs while paying limited attention to water recovery. Hydraulic fracturing requires injection of 10,000 – 100,000 m3 of freshwater per well, often sourced from river, lake and water well, while the long-term water recovery is less than 50%. In addition to low water recovery, rapid …