Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 6 of 6 for “"Low-Income Housing--Durban."”

  1. Restructuring the apartheid city of Durban through low-cost housing development : opportunities and limitations.

    … and age, when apartheid has been repealed , the housing backlog determined and the government has committed itself to housing the previously disadvantaged and made resources available , it is imperative to deliver housing at scale. This delivery should happen in a manner that not only provides …

    ukzn Repository record for Restructuring the apartheid city of Durban through low-cost housing development : opportunities and limitations. (opens in a new tab)

  2. The impact of peripherally located low income housing projects in Ethekwini municipality : a case-study of slum clearance project, Welbedacht East.

    … 23 kilometres from Pinetown, 43 kilometres from Durban, and 15 kilometres from Chatsworth Centre. It is one of the development projects undertaken to spearhead the very ambitious programme of slums clearance, in order to confront the challenge of informal settlements in the eThekwini Municipal …

    ukzn Repository record for The impact of peripherally located low income housing projects in Ethekwini municipality : a case-study of slum clearance project, Welbedacht East. (opens in a new tab)

  3. An investigation into alternative domestic water, sewer and electricity supply systems in the eThekwini municipal area.

    … South Africans still lack access to adequate housing, mainly as a result of apartheid era development policies. The delivery of low income, state subsidised, housing includes the provision of water, sewer drainage and electricity supply services. These services are provided via individual …

    ukzn Repository record for An investigation into alternative domestic water, sewer and electricity supply systems in the eThekwini municipal area. (opens in a new tab)

  4. An investigation into why housing consolidation projects only reach 70%-80% of intended beneficiaries on closure of the project in Metropolitan Durban.

    … to power in South Africa in 1994, it inherited a housing sector with severe abnormalities as a result of the policies and political turbulence of the apartheid era (Department of Housing/DOH, 2000a). One of the main problems was and is still the enormous housing backlog facing large sections of …

    ukzn Repository record for An investigation into why housing consolidation projects only reach 70%-80% of intended beneficiaries on closure of the project in Metropolitan Durban. (opens in a new tab)