Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 55 for “"Military Construction"”.

  1. Analysis of Naval Facilities Engineering Command Military Construction projects and the overall military construction process

    … Naval Facilities Engineering Command (NAVFAC) Military Construction (MILCON) projects. It utilizes estimates and actual costs throughout the life of the projects to assess the general MILCON process. Furthermore, this thesis aids in the determination of trends and possible recommendations for …

    texas Repository record for Analysis of Naval Facilities Engineering Command Military Construction projects and the overall military construction process (opens in a new tab) Restricted access

  2. Analysis of Naval Facilities Engineering Command Military Construction projects and the overall Military Construction process

    … Naval Facilities Engineering Command (NAVFAC) Military Construction (MILCON) projects. It utilizes estimates and actual costs throughout the life of the projects to assess the general MILCON process. Furthermore, this thesis aids in the determination of trends and possible recommendations for …

    nps Repository record for Analysis of Naval Facilities Engineering Command Military Construction projects and the overall Military Construction process (opens in a new tab)

  3. Program budgeting as applied to military construction

    nps Repository record for Program budgeting as applied to military construction (opens in a new tab)

  4. Optimal selection of Army military construction projects

    … Installation Management (ACSIM) manages all Army military construction (MILCON) implementation and requests. Annually, the ACSIM submits a prioritized list of MILCON projects requiring Congressional approval. Typically, Congress does not approve all Army requests. This thesis develops an integer …

    nps Repository record for Optimal selection of Army military construction projects (opens in a new tab)

  5. The development of a readiness model for military construction (Navy) Infrastructures

    … Engineering Command (NAVFAC) currently approves construction projects and how additional information about an activity's facility condition, available in existing databases, could assist the approval system. The major development was an infrastructure readiness model that assesses the condition …

    nps Repository record for The development of a readiness model for military construction (Navy) Infrastructures (opens in a new tab)

  6. Implementation of Integrated Project Delivery on Department of Navy Military Construction Projects

    … is what establishes the framework that enables a construction project to be developed and ultimately executed. The construction industry has observed that projects (both private and public) frequently suffer from factors such as adversarial relationships, low roductivity, high inefficiency and …

    unlv Repository record for Implementation of Integrated Project Delivery on Department of Navy Military Construction Projects (opens in a new tab) Download PDF for Implementation of Integrated Project Delivery on Department of Navy Military Construction Projects (opens in a new tab)

  7. Economic analysis supporting the increase of the unspecified minor military construction threshold

    … meeting the constraints of the Unspecified Minor Military Construction (UMMC) threshold. By examining the Department of the Navy's Minor and Military Construction programs, conducting a comparative analysis of DD Form 1391s from past projects to evaluate cost escalation factors and analyzing …

    nps Repository record for Economic analysis supporting the increase of the unspecified minor military construction threshold (opens in a new tab)

  8. HIGH-INFLUENCE FACTORS FOR THE TIMELINESS OF PROJECT AWARD FOR NAVY MILITARY CONSTRUCTION

    … Engineering Command (NAVFAC) uses to bring Military Construction (MILCON) projects from concept to contract award fails to provide reliable and timely results. This poor performance leads to the untimely delivery of critical facilities, which directly impacts warfighting and power projection …

    nps Repository record for HIGH-INFLUENCE FACTORS FOR THE TIMELINESS OF PROJECT AWARD FOR NAVY MILITARY CONSTRUCTION (opens in a new tab)

  9. Alternative to low bid selection in Air Force reserve military construction: approach to best value procurement

    … used procurement methods in the facility construction industry. The Federal Government and the Air Force Reserve predominant project delivery approach has been via the low-bid award. This process has not been successful, documented by large numbers of construction modifications, as well as …

    gatech Repository record for Alternative to low bid selection in Air Force reserve military construction: approach to best value procurement (opens in a new tab)

  10. Investigating the Ballistic Performance of Cross-laminated Timber (Clt) and Enhanced Timber Composites for Military Construction

    Permanent and temporary military structures must meet force protection design requirements, namely resistance to blast explosion, ballistic impact, and forced entry. Historically, the United States’ Military has used carbon intensive and single use building materials (e.g. concrete and steel) to …

    gatech Repository record for Investigating the Ballistic Performance of Cross-laminated Timber (Clt) and Enhanced Timber Composites for Military Construction (opens in a new tab)

  11. A comparison of design-bid-build and design-build project delivery methods on military construction projects

    … project delivery method as a means to produce military facilities faster and cheaper. An analysis was conducted on 119 military construction projects executed by the US Army Corps of Engineers. While design-build awards may be made earlier in the delivery of military construction projects the …

    iastate Repository record for A comparison of design-bid-build and design-build project delivery methods on military construction projects (opens in a new tab)

  12. Analysis of contract modifications on Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command

    … analyzes the contract modifications on 135 Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command (NAVFAC). Data for this study came from projects from 9 of the 10 Engineering Field Divisions (EFD' s)/Engineering Field Activities (EFA' s) that …

    nps Repository record for Analysis of contract modifications on Military Construction (MILCON) projects administered by the U.S. Naval Facilities Engineering Command (opens in a new tab)

  13. RESTORATION AND MODERNIZATION CAPITAL IMPROVEMENTS OF ARMY INFRASTRUCTURE UNDER HQ AMC AS A VIABLE REPLACEMENT FOR MILITARY CONSTRUCTION

    … as a practical alternative to demolition and new construction through military construction (MILCON). The Army has been struggling over the past few years with the ever-declining mission readiness and quality of infrastructure. Lack of MILCON funds hinders efforts to demolish outdated facilities …

    nps Repository record for RESTORATION AND MODERNIZATION CAPITAL IMPROVEMENTS OF ARMY INFRASTRUCTURE UNDER HQ AMC AS A VIABLE REPLACEMENT FOR MILITARY CONSTRUCTION (opens in a new tab)

  14. Effects of Contract Delivery Method on the LEED™ Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006)

    … the LEED score of projects over the design and construction time horizon. The Navy uses almost exclusively Design-Bid-Build and Design-Build contracting methods to deliver Military Construction (MCON) projects. Twenty-five projects were analyzed and there were no statistically significant …

    nps Repository record for Effects of Contract Delivery Method on the LEED™ Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006) (opens in a new tab)

  15. The effect of military construction transformation on project cost and schedule within the United States Army Corps of Engineers South Atlantic Division

    … Corps of Engineers (USACE) has been the primary Construction Agent of the United States Army and Air Force. Its members are considered the experts in project delivery for the Department of Defense (DoD). In 2006, the Base Realignment and Closure Program (BRAC) and the Global War on Terrorism …

    gatech Repository record for The effect of military construction transformation on project cost and schedule within the United States Army Corps of Engineers South Atlantic Division (opens in a new tab)

  16. An analysis of public-private ventures for the construction of military family housing

    … involved the following: (1) Description of the Military Construction Process; (2) Analysis of the problems associated with the military construction process; and (3) Provide a detailed explanation of the publicprivate venture programs along with a description of how to initiate the programs at …

    nps Repository record for An analysis of public-private ventures for the construction of military family housing (opens in a new tab)

  17. Assessment of costs and benefits of the military housing privatization initiative in selected areas

    The Military Housing Privatization Initiative (MHPI) represents a dramatic revision in the construction and maintenance of military housing. The Basic Allowance for Housing (BAH) initiative is also a long waited major step towards providing an adequate quantity and quality of living quarters for …

    nps Repository record for Assessment of costs and benefits of the military housing privatization initiative in selected areas (opens in a new tab)

  18. An analysis of the Military Family Housing Construction Contractor supplier base at MCB Camp Pendleton and a report on how an understanding of these trends may improve the Acquisition Strategy for the Department of Defense

    … examined the emerging transformation of housing construction and property management responsibilities and risks from the Government to the private sector developer. Specifically, the study sought to answer two primary research questions: - How can the Navy improve construction management? - What …

    nps Repository record for An analysis of the Military Family Housing Construction Contractor supplier base at MCB Camp Pendleton and a report on how an understanding of these trends may improve the Acquisition Strategy for the Department of Defense (opens in a new tab)

Page 1 of 3