Linkage of Annual Oil Sands Mine Plan to Composite Tailings Plan
… a lack of a direct linkage between the long-term mine plans and the quantity of the tailings produced downstream. This research is focused on developing a linkage between oil sands long-term mine plans and the final composite tailings (CT) produced to assist the oil sands production process to be …
-
Geotechnical risk assessment of mine haulage drifts during the life of a mine plan
Mine developments such as haulage drifts and cross-cuts are the primary access to the mining blocks of an orebody in multilevel mining systems for tabular ore deposits. Thus, their stability is of utmost importance during the planned period of production or the life of a mine plan. Many Canadian …
-
Determination of the optimal equipment fleet for overburden stripping operation in a surface coal mine with discrete event simulation
… quality of coal continuously to thermal power plants to meet the increasing energy demand. In this study, discrete event simulation was implemented to determine the optimum equipment fleet for overburden removal operation in a surface coal mine. According to the long-term plan prepared by the …
-
DEVELOPMENT OF A CONDITIONAL SIMULATION MODEL OF A COAL DEPOSIT
… of the model showed that when the model is "mined" according to an actual daily mining sequence, the resulting daily variability corresponded extremely well to what was observed during the actual mining. This second verification served not only to validate the model but also served as a …
-
Development of a Tailings Management Simulation and Technology Evaluation Tool
… The developed model (TMSim) incorporates the mine plan, various stages of dewatering including classification, pre- and post-deposition dewatering, and an impoundment material balance including tailings, process water, construction material and capping materials. Through simulations of a …
-
RISK CONTROL IN PRODUCTION SCHEDULING BY CONSIDERING VOLUME AND GRADE UNCERTAINTIES IN RESOURCE ESTIMATION
Mineral deposits are the main assets for the mining industry. Mineral deposits are estimated based on the findings of exploration drilling. Complex host geology with variable grades and geological controls increases difficulty in resource estimation. In these situations, volume (tonnage) and grade …
-
Application of Electromagnetic Methods to Identify and Characterize Sub-surface Structures Associated with the Coles Hill Uranium Deposit
… County, Virginia represents the largest unmined uranium resource in the United States, with an estimated resource of 110 million pounds of U3O8 in place with a cutoff grade of 0.025 wt% U3O8. The deposit is localized along a geologic unit that parallels the Chatham Fault, which separates …
-
Design and stability of barrier pillars in longwall mining
… The influence of the geology, mining depth and mine-layout on barrier pillar stability was examined and design guidelines for determining sizes for such pillars were established using the "pillar core concept". The yield zone was better estimated by the use of the Coulomb failure/strength …
-
Stochastic mining supply chain optimization: a study of integrated capacity decisions and pushback design under uncertainty
… of all related aspects, including: the mine's extraction sequence, material destination decisions, material transport decisions, and equipment capacities. Further, if these decisions are to be robust, they must be made while considering sources of uncertainty. The contributions included …
-
A theoretical analysis of the implications of comminution practices on open pit mine planning
The implications of comminution practices on the planning of a typical open pit mine was investigated in this study by means of computer simulation. The objective was to assess the effects of mining costs as well as processing costs on the production plan of a typical open pit mine. For the purpose …
-
An alternative method for pillar stability analysis based on machine learning assisted geomechanical simulations
… pillar is a critical structure in an underground mine plan. Although various methodologies have been developed for designing a geotechnically stable pillar, structural and geological variations may be misleading. This study makes use of a 2D plane-strain based numerical modeling scheme to …
-
Incorporating grade uncertainty in oil sands mine planning and waste management using stochastic programming
The primary purpose of oil sands mine planning and waste management is to provide ore from the mine pit to the processing plant while containing the tailings in an efficient manner in-pit. Incorporating waste management in the mine plan is essential in maximizing the economic potential of the …
-
A Framework for Life of Mine Ventilation Planning with a Case Study of the Diavik Diamond Mine
A ventilation planning framework with a focus on life-of-mine plans has been developed and was validated with a case study. The framework reconciles the mine production plan with the ventilation plan by creating design acceptability criteria, and from these, minimum airflow requirements for the …
-
Production schedule optimization using linear programming concept in Minesight 3D for a multi-pit coal mine in Indonesia
Mine planning and production scheduling is the foundation from which optimal solutions are generated for the extraction of material while satisfying various constraints. The main purpose of this paper is to maximize the net present value (NPV) of an open-pit coal mine project. The entire modeling …
-
Avaliação da metodologia de sequenciamento direto de blocos aplicada em depósitos de minério de ferro
… the Direct Blok Scheduling with the conventional mine planning method, which uses the Lerchs-Grossmann algorithm. Direct Blok Scheduling applies a unique optimization process that encompasses all stages developed in the classical methodology, taking into account the geological uncertainty in the …
-
Smart mining simulation with an intelligent supervisory agent for automated shovel dig allocation and truck deployment
… processing rate, and quantity of material mined. The complexity of decision-making in mining has grown due to intricate mineral deposits and the need for improved productivity. The focus of this thesis is to develop a decision support framework referred to as smart mining architecture …
-
Effect of mining and geology on induced seismicity - A case study
… such parameters. It could also prove useful for mine planning to mitigate the occurrence of strong seismic events and to provide a safer work environment. This thesis reports the results of a case study of Young-Davidson (YD) mine of Alamos Gold Inc. in northern Ontario, a gold mining operation …
-
Methodology for the design of dynamic rock supports in burst prone ground
The depth at which underground mines operate has been increasing continuously which is particularly true in the case of hard rock mining. The stability issues associated with mining at great depth pose tough challenges to engineers and researchers alike. Long-term mine developments in deep hard …
-
Impacto de la inclusión de variables ambientales en la planificación minera de corto plazo
Actualmente el negocio minero tiende a fomentar un desarrollo sustentable minimizando sus impactos ambientales mediante el desarrollo de nuevos procesos y nuevas tecnologías. Sin embargo, en el área de planificación minera, no existe un modelo de planificación de corto plazo que incorpore variables …
-
Analysing the impact of the resource-to-reserve processes on financial viability in mining projects
South Africa has immense mineral resources, historically and contemporarily engendering the mining industry an integral part of the Country's economy. Considerable quantities of money are expended on the evaluation, implementation and eventual extraction of economically valued minerals, for …