Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 32 for “"Minimizing makespan"”
-
Minimizing Makespan of a Multi-mode, Multi-item Packaging Machine Subject to Resource and Inventory Constraints
… Two objectives are considered in this work: 1) Minimizing the total packing time over the planning horizon, and 2) Minimizing the maximum of packing time in each period within the planning horizon. The models are considered as a special case (no parallel activities and no precedence constraints) …
-
Approximation Algorithms for Generalized Path Scheduling
… of machines to be processed on. We consider minimizing makespan (largest completion time) and/or total completion time and we present several improved approximation algorithms for both objectives.
-
Designing Scheduling Algorithms via a Mathematical Perspective
… the best known approximation ratio for minimizing makespan is $O(c)$. An outstanding open problem in the top-10 list by Schuurman and Woeginger (and its recent update by Bansal) asks whether there exists a constant-factor approximation algorithm. In joint work with Janardhan Kulkarni, …
-
Scheduling flexible flow lines with sequence dependent setup times
… with sequence-dependent setup times to minimize makespan. This type of manufacturing environment is found in industries such as printed circuit board and automobile manufacture. Lower makespans can be associated with more efficient use of resources. Poor scheduling when sequence-dependent setup …
-
A Multi-Objective Genetic Algorithm Development For Scheduling Distributed Layout Based Job Shop
… in a distributed layout context, focusing on minimizing makespan, travel distance, and energy consumption. It develops an efficient Genetic Algorithm (GA) using the Weighted Sum Approach (WSA) and extends the Non-dominated Sorting Genetic Algorithm II (NSGA-II) to solve the Distributed Job …
-
A Multi-Objective Genetic Algorithm for Flexible Job Shop Scheduling with Next-Event Time Advance (NETA) Solution Construction
… extended to a multi-objective formulation minimizing makespan together with total earliness and tardiness relative to job due dates. The results confirm that the proposed approach is capable of producing high-quality and reasonable schedules within acceptable computational time.
-
Models and algorithms for a flexible manufacturing system
… so as to optimize various objectives such as minimizing makespan or maximizing machine utilization, or minimizing total flowtime. This problem is mathematically modeled, and heuristic algorithms are presented along with computational results for the case of minimizing the makespan.
-
New valid inequalities for a time-indexed formulation of the flexible job shop scheduling problem
… test instances, both with the objective of minimizing makespan as well as minimizing tardiness. For both objectives the new valid inequalities have yielded improved lower bounds, however with varying effect. Computational results are reported along with suggestions for implementation of the …
-
An enhanced healthcare IoT task scheduling using hybrid Q-NEH and CS-GW optimization in fog computing environment
… handle multiple competing objectives including minimizing makespan, maximizing resource utilization, and ensuring energy efficiency. Our hybrid solution leverages Q-NEH’s adaptive learning capabilities for intelligent task ordering alongside CS-GW’s balanced exploration-exploitation mechanisms …
-
Efficient Heuristics for Virtual Machine Migration in Data Centers
… parallel VM migrations has been studies less. Minimizing makespan (total migration time) while reducing energy and service quality degradation caused by using datacenter resources for migrations, are the main objectives of the problem. One of the issues in planning multiple live migrations is …
-
Planning and scheduling in pharmaceutical supply chains
… equally effective for both maximizing profit and minimizing makespan.
-
Minimization of weighted tardiness in job shops using shifting bottleneck and tabu search procedures
… research work concentrates on the problem of minimizing the total weighted tardiness in classical job shops. Job shop scheduling problems are among the hardest known combinatorial optimization problems. In particular the problem of minimizing tardiness in job shops is strongly NP-hard, which …
-
Modelling batch processing machines problems with symmetry breaking and arc flow formulation
Problems of minimizing makespan in scheduling batch processing machines are widely exploited by academic literature, mainly motivated by burn-in tests in the semiconductor industry. The problems addressed in this work consist of grouping jobs in batches and scheduling this in parallel machines. The …
-
The multiple resource constrained scheduling problem
… (worker) constraints with the objective of minimizing makespan, the maximum job completion time. Additionally, the machines are non-identical and parallel where job preemption is not allowed. The MRCS problem exists in systems where each job set requires processing by a specific machine and …
-
Large-Scale Solution Approaches for Healthcare and Supply Chain Scheduling
… with (i) maximizing total profit and (ii) minimizing makespan objectives. We conduct several sensitivity analysis to test the quality and robustness of the solutions on a real life case study.
-
Melhoria da eficiência produtiva através do sequenciamento de máquinas paralelas com tempos de mudança
… production and increase production efficiency by minimizing makespan function in two identical parallel machines. Thus, the evaluation and reduction of availability losses due to sequence dependent setup times, concerning the exchange of formats between products is crucial since it is the only …
-
Uma estrutura de vizinhança baseada em árvore de cobertura aplicada em uma colaboração de algoritmo genético e VNS para a minimização de makespan em problemas de programação reativa da produção
… Scheduling (PRP) in order to minimize the makespan is an important activity in the manufacturing industry, in view of the numerous articles reflecting this search today. Among these studies highlight the global search use in hybridization or collaboration with local search, especially of …
-
Supply chain optimization of batch production plants
… stage have variety of objective functions i.e. minimizing makespan or minimizing overall tardiness or minimizing earliness. By changing the objective function and few other constraints in the production model the objective of minimizing overall inventory and changeover costs can be achieved. For …