Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 87 for “"Mobile Crane"”

  1. Comparison of Lift Path Planning Algorithms for Mobile Crane Operations in Heavy Industrial Projects

    … factories, transported to sites and installed by mobile cranes. Due to a large number of lifts on the congested and dynamic site layouts in heavy industrial projects, the lift path planning has been attention for not only safe and efficient mobile crane operation but also better project …

    concordia

  2. BIM-based Motion Planning of Mobile Crane Operation in Modular-based Heavy Construction Sites

    … are generally installed by large-capacity mobile cranes based on one of two lifting options: (1) pick from fixed positions, in which case the crane delivers the payloads from a single (fixed) position for the duration of the project; and (2) pick and carrying operation, in which, because of …

    alberta Repository record for BIM-based Motion Planning of Mobile Crane Operation in Modular-based Heavy Construction Sites (opens in a new tab)

  3. Estimation of Mobile Crane Cycle Time to Improve the Accuracy of Modular-Based Heavy Construction Project Schedules

    Abstract Estimation of Mobile Crane Cycle Time to Improve the Accuracy of Modular-Based Heavy Construction Project Schedules Ali Nikeghbali Modular-based construction projects rely heavily on mobile cranes for lifting large quantities of materials. In recent years, these materials have become …

    concordia

  4. Shared and sustainable leadership of Northern Crane apprentice crane operators : multiple perspectives

    … shared and sustainable leadership culture at the mobile crane company, NCSG Crane & Heavy Haul Services Ltd (a.k.a. Northern Crane), based in Fort McMurray Alberta, Canada. This qualitative study used Action Research Engagement methodology with an appreciative stance. The first participants were …

    royalroads Repository record for Shared and sustainable leadership of Northern Crane apprentice crane operators : multiple perspectives (opens in a new tab)

  5. An integrated approach to assessing mobile crane mat requirements based on a novel approach to ground bearing pressure calculations and a redefining of crane mat selection and optimization

    … of modular construction is high-capacity mobile cranes, of which hydraulic and crawler cranes are the most widely used. With the surge in weight of modules, the mobile crane's ground bearing pressure also escalated. The traditional primary status quo technique to avoid ground failure is to …

    alberta Repository record for An integrated approach to assessing mobile crane mat requirements based on a novel approach to ground bearing pressure calculations and a redefining of crane mat selection and optimization (opens in a new tab)

  6. Gamybinio pastato Dargupių k. Prienų rajone statybos projektas /

    … of multi-layer wall panels was prepared, and a mobile crane was selected. The estimated part calculates the quantities and value of production building works.

    vilnius Repository record for Gamybinio pastato Dargupių k. Prienų rajone statybos projektas / (opens in a new tab)

  7. Tilt-up construction

    … they are tilted to a vertical position using a mobile crane, they are temporarily braced in their final upright position, and finally, they are tied into the building's roof and floor system to become an integral part of the finished structure. Tilt-up is a fast, simple, and economical technique …

    nps Repository record for Tilt-up construction (opens in a new tab)

  8. Real-time safety assistance to improve operators' situation awareness in crane lifting operations

    Operating a crane is a sophisticated job that not only requires the operators to have extensive skills and experience, but more importantly a comprehensive situation awareness (SA) of the crane and its surroundings throughout the operation. The objective of this research is to develop and test a …

    gatech Repository record for Real-time safety assistance to improve operators' situation awareness in crane lifting operations (opens in a new tab)

  9. Pulse rate, pulse pattern, and onset distance effects on subject braking responses while using an auditory collision warning signal

    … The warning signal's purpose was to alert mobile crane operators of their proximity to overhead power lines. The study consisted of two experimental phases. The first phase consisted of three sections; A) development and construction of the PWD's auditory warning signal. B) development of …

    vt Repository record for Pulse rate, pulse pattern, and onset distance effects on subject braking responses while using an auditory collision warning signal (opens in a new tab)

  10. Daugiabutis namas Gytariuose /

    … blocks. Third part includes selection of mobile crane, concluded cost of separate flat in finishing and calculation of hollow core slabs made the installation of emissions. In the fourth part there are calculations of building barriers heating conductivity, comparison with nominal values. …

    vilnius Repository record for Daugiabutis namas Gytariuose / (opens in a new tab)

  11. Computerized Analysis of Wire Rope Supported Lattice Crane Boom

    In the past several decades, the failure of mobile crane booms has been a problem of great concern in the heavy construction equipment industry, due to the potential loss of life and property which may result. Every year, construction equipment manufacturers are designing and building larger cranes …

    marquette Repository record for Computerized Analysis of Wire Rope Supported Lattice Crane Boom (opens in a new tab)

  12. Analysis, design, and construction of tilt-up wall panel

    … casting and to withstand the loading of the mobile crane which will be used to lift the panel. The crane capacity affects the panel size and weight. Proper curing and bondbreaker application are very important to reduce bonding and to ensure clear cleavage between concrete surfaces. Changing …

    vt Repository record for Analysis, design, and construction of tilt-up wall panel (opens in a new tab)

  13. A simulation methodology for dynamic analysis of geometrically-contrained rigid/flexible multi-link machines and vehicles

    … of motion. Three examples (double-robot arm, mobile crane and front end loader) were used to demonstrate the modeling procedure for open and closed-loop mechanical systems.</p>

    iastate Repository record for A simulation methodology for dynamic analysis of geometrically-contrained rigid/flexible multi-link machines and vehicles (opens in a new tab)

  14. Floating Urbanization

    … growing the vertical core acts as a home for a mobile crane to be attached and assist with the development of residential units or the larger urban-scape. This crane can also be positioned on a small mobile barge that floats around the city to serve any location at a given time.

    vt Repository record for Floating Urbanization (opens in a new tab)

  15. A dynamic behavior modeler for future inclusion into a multi-tasking motion planning system for material handling in construction

    … presents a sample animation case involving a mobile crane in a "pick and place task”. Although traditional animation methods have been employed for the sample case, the animation provides an insight to the realistic visualization that would be achieved through dynamic simulation. In order to …

    vt Repository record for A dynamic behavior modeler for future inclusion into a multi-tasking motion planning system for material handling in construction (opens in a new tab)

  16. Autonomous robotic construction using advanced AI-based hierarchical framework

    … aerial vehicles, and robotic arms), robotic cranes would be more suitable for heavy construction tasks due to their large payload and wide working range. However, few robotic cranes are currently used for construction practice and AI algorithms have not been widely applied in the construction …

    ubc Repository record for Autonomous robotic construction using advanced AI-based hierarchical framework (opens in a new tab)

  17. Improving lookahead assembly scheduling in modular building projects using linked data-based space constraint checking and multi-objective reinforcement learning

    … targeted space constraints related to mobile crane operations, which are critical to assembly. Validation on two case studies showed that the framework reduced manual effort in constraint checking while ensuring accuracy. Second, a novel Deep Reinforcement Learning (DRL) and Monte Carlo …

    auckland-ms Repository record for Improving lookahead assembly scheduling in modular building projects using linked data-based space constraint checking and multi-objective reinforcement learning (opens in a new tab)

  18. Improving crane safety by agent-based dynamic motion planning using UWB real-time location system

    The safe operation of cranes requires not only the experience of the operator, but also sufficient and appropriate support in real time. Due to the dynamic nature of construction sites, unexpected changes in the site layout may create new obstacles for the crane that can result in collisions and …

    concordia

  19. Automated Simulation Model for Crane Motion Planning in Heavy Industrial Projects

    … During the on-site installation, expensive mobile cranes are used for lifting activities, and appropriate use of these cranes can reduce costs and shorten the construction process. On the contrary, improper management of crane operations can lead to budget overruns, schedule delays, and …

    alberta Repository record for Automated Simulation Model for Crane Motion Planning in Heavy Industrial Projects (opens in a new tab)

Page 1 of 5