Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 5 of 5 for “"Monte Carlo simulation risk analysis"”
-
Assessing the Economic Feasibility of Synthetic Natural Gas Under Conditions of Uncertainty
… natural gas is explained. For the economic analysis, the Lurgi Model was selected because it has been the most common model used for commercial production of high BTU gases. An extensive analytical model is described in which inflated capital, fuel, and operating and maintenance costs were …
-
Understanding and Improving Input for Quantitative Risk Analysis in the Construction Industry
Risk analysis in the construction industry involves identifying risk events that could potentially affect a project and its delivery, quantifying those risks, and developing mitigation strategies to enhance project success. This thesis aims to improve the process of risk analysis through the …
-
Combined Fuzzy and Probabilistic Simulation for Construction Management
Simulation has been used extensively for addressing probabilistic uncertainty in range estimating for construction projects. However, subjective and linguistically expressed information results in added non-probabilistic uncertainty in construction management. Fuzzy logic has been used successfully …
-
DETERMINATION OF PROBABILITY OF INTERNAL EROSION IN EARTHEN DAM SEEPAGE
… nature of soil parameters into account. The Monte Carlo method was applied for the analyses. The histogram and the probability density function of the critical hydraulic gradient were produced for an existing earthen dam. Then, the probability of exceedance of the critical hydraulic gradient …
-
Uncertainty and Risk Analysis in Fire Safety Engineering
Two Quantitative Risk Analysis (QRA) methods are presented which can be used to quantify the risk to occupants in, for example, a building in which a fire has broken out. The extended QRA considers the inherent uncertainty in the variables explicitly. The standard QRA does not consider the …