Results 1 to 9 of 9 for “"Multi-Project scheduling"”

  1. Multi-Project Scheduling for Industrialization Projects: an approach to exploit resource flexibility

    … landscape, organizations increasingly manage multiple concurrent projects that share limited resources and face dynamic execution conditions. These environments are characterized by uncertainty, fluctuating workloads, and stringent delivery deadlines, making effective scheduling a critical …

    minho-thes Repository record for Multi-Project Scheduling for Industrialization Projects: an approach to exploit resource flexibility (opens in a new tab) Embargoed until 2028-03-20

  2. A general approach for solving the Resource-Constrained Project and Multi-Project Scheduling Problem

    Abstract The project scheduling problem belongs to the complex decision-making process, which has been increasingly attracting attention from both researchers and practitioners. Researchers have studied resource-constrained project scheduling problems (RCPSPs) and resource-constrained multi-project …

    calgary Repository record for A general approach for solving the Resource-Constrained Project and Multi-Project Scheduling Problem (opens in a new tab)

  3. Simulation and Optimization of Scheduling Policies in Dynamic Stochastic Resource-Constrained Multi-Project Environments

    The goal of the Project Management is to organise project schedules to complete projects before their completion dates, specified in their contract. When a project is beyond its completion date, organisations may lose the rewards from project completion as well as their organisational prestige. …

    lancaster Repository record for Simulation and Optimization of Scheduling Policies in Dynamic Stochastic Resource-Constrained Multi-Project Environments (opens in a new tab)

  4. Programación multi-proyecto con restricciones de financiación (F-DRCMPSP)

    … del problema RCMPSP (“Resource-Constrained Multi-Project Scheduling Problem”) que tiene en cuenta la existencia de restricciones en la financiación disponible para programar cada uno de los proyectos, y desarrollar un método robusto que permita la programación de este tipo de carteras de …

    valladolid Repository record for Programación multi-proyecto con restricciones de financiación (F-DRCMPSP) (opens in a new tab)

  5. Planning and Scheduling Supply Chain Integrated Projects

    Project planning and scheduling are two major tasks directly impacting an organization’s profitability. Traditionally, project managers first schedule project activities and then plan for the associated supply chain, such as materials ordering, procurement, and supplier selection. This sequential, …

    unsw Repository record for Planning and Scheduling Supply Chain Integrated Projects (opens in a new tab)

  6. Multi-Project Multi-Mode Resource Constrained Scheduling Problem with Material Ordering

    In Multi–mode Project Scheduling with Resource Constrained (MPSRCP), activities are sequenced under resource limitation. In this thesis, an extension of the problem is considered. Multi-project multi-mode resource constrained scheduling problem with material ordering is studied. Bonus and penalty …

    concordia

  7. Resource assignment in short life technology intensive (SLTI) new product development (NPD)

    Enterprises managing multiple concurrent New Product Development (NPD) projects face significant challenges assigning staff to projects in order to achieve launch schedules that maximize financial returns. The challenge is increased with the class of Short Life Technology Intensive (SLTI) products …

    njit Repository record for Resource assignment in short life technology intensive (SLTI) new product development (NPD) (opens in a new tab)

  8. Résolution de problèmes d'ordonnancement multi-projets sous contraintes de ressources multi-compétences partagées

    … un ensemble de problèmes d'ordonnancement multi-projet à contraintes de ressources multi-compétences limitées. Les problèmes étudiés sont issus d'un cas industriel rencontré par une entreprise de développement de services informatiques. Dans chacun de ces problèmes, de multiples projets …

    star-france Repository record for Résolution de problèmes d'ordonnancement multi-projets sous contraintes de ressources multi-compétences partagées (opens in a new tab)

  9. An optimization-based framework for concurrent planning of multiple projects and supply chain : application on building thermal renovation projects

    Le contexte d’application de cette recherche a été le projet CRIBA. CRIBA vise à industrialiser une solution intégrée de rénovation et d’isolation de grands bâtiments. De ce fait, une part importante de la valeur ajoutée est transférée des chantiers de rénovation vers des usines de fabrications …

    star-france Repository record for An optimization-based framework for concurrent planning of multiple projects and supply chain : application on building thermal renovation projects (opens in a new tab)