Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 16 of 16 for “"Ontario Hydro"”.

  1. An Approach to the Analysis of Spatial Administrative Patterns: Ontario Hydro-Electric Power Commission

    … relationships are tested using data for the Ontario Hydro-Electric Power Commission. Linear and quadratic models relating functional costs to workload of the administrative areas are offered. The quadratic models incorporate the concept of the long-run average cost curve. A theoretical …

    mcmaster Repository record for An Approach to the Analysis of Spatial Administrative Patterns: Ontario Hydro-Electric Power Commission (opens in a new tab)

  2. Nuclear Waste Disposal and Decommissioning: Are Costs Too High?

    … done by independent studies with those done by Ontario Hydro indicate that Hydro is grossly underestimating the costs of waste disposal and decommissioning. This result leads to the conclusion that Ontario Hydro is undervaluing the costs of nuclear waste disposal and decommissioning to justify …

    mcmaster Repository record for Nuclear Waste Disposal and Decommissioning: Are Costs Too High? (opens in a new tab)

  3. Temper-bead/half-bead/control deposition repair welding techniques used for low alloy and Cr-Mo steels

    … Tennessee, Knoxville (UTK) joined hands with the Ontario Hydro Company in May 1989 to conduct research on the Temper-Bead welding techniques employed in Cr-Mo and low alloy steels with the Shielded Metal Arc Welding (SMAW) process. Two layer temper-bead refining techniques were applied in this …

    ut-knoxville Repository record for Temper-bead/half-bead/control deposition repair welding techniques used for low alloy and Cr-Mo steels (opens in a new tab)

  4. A Novel Electromagnetic Technique for Remote Repositioning of Coolant Tube Spacers In CANDU Nuclear Reactors

    … at Pickering 'A' Nuclear Generating Station of Ontario Hydro. A contributing factor to the rupture of the tube was a contact for a period of several years between the tube and an outer coaxial tube, called the calandria tube. The contact between the pressure tube and calandria tube occurred …

    mcmaster Repository record for A Novel Electromagnetic Technique for Remote Repositioning of Coolant Tube Spacers In CANDU Nuclear Reactors (opens in a new tab)

  5. Cross-currents: The development of the hydro-electric system in northeastern Ontario, 1911-1966.

    Examining hydro-electric development, as it occurred in northeastern Ontario, sheds a new and different light on the history of technology and development in Canada. The northeastern Ontario hydro-electric system (Mattagami and Abitibi watersheds) developed over a period of fifty years. It …

    ottawa-retro Repository record for Cross-currents: The development of the hydro-electric system in northeastern Ontario, 1911-1966. (opens in a new tab)

  6. RBLIABILITY MODEL CONSTRUCTION AND EVALUATION IN REPAIRABLE SYSTEMS

    … sub-system in the Bruce generating station of Ontario Hydro and the required state space models under the various assumptions are constructed by a computer program. The system availabilities and the value of spare pumps are evaluated from these models. The effects of permanent and temporary …

    sask Repository record for RBLIABILITY MODEL CONSTRUCTION AND EVALUATION IN REPAIRABLE SYSTEMS (opens in a new tab)

  7. Short-Term Load Demand Modelling and Forecasting

    … on the load demand.</p> <p>Actual load data from Ontario Hydro has been used to test the proposed methods.</p>

    mcmaster Repository record for Short-Term Load Demand Modelling and Forecasting (opens in a new tab)

  8. Investigation of Quantitative NMR by Statistical Analysis

    … straight-forward as it would be for the former. Ontario Hydro has encountered problems in measuring deuterium in DMSO/water mixtures. To solve the problem with NMR, an analytical method has been established to measure the deuterium content in waters and in DMSO/water mixtures. This involved …

    mcmaster Repository record for Investigation of Quantitative NMR by Statistical Analysis (opens in a new tab)

  9. Application of the transient energy function method to stressed large-scale power systems

    … were tested on realistic power networks of the Ontario Hydro system. The operating conditions selected for the studies represent highly stressed power systems. The results of the tests compared well with those obtained by time-solution in (i) predicting the correct dynamic behavior (e.g., …

    iastate Repository record for Application of the transient energy function method to stressed large-scale power systems (opens in a new tab)

  10. Tinker, Tory, Wobbler, Why? : the political economy of electricity restructuring in Ontario, 1995-2003

    The Ontario Tories' 42-year hegemony in government (1943-1985) was wrought through clever policies which often utilized Crown institutions to promote prosperity or to oblige or mollify vying interests. Ousted in 1985, though, they used their time in opposition to revise the Tory doctrine. In the …

    queens Repository record for Tinker, Tory, Wobbler, Why? : the political economy of electricity restructuring in Ontario, 1995-2003 (opens in a new tab)

  11. Environmental assessment of Lake Gibson sediments, water quality, and soils of the Niagara Region

    … tested for metals and some for Total Petroleum Hydrocarbons (TPH). Evaluation of the results leads to the following conclusions: 1. Metal concentrations ofAI, Cd, Cu, Cr, Pb, Ni, Fe and Zn in soils from the Niagara Region are well below background limits set by the Ministry of the Environment …

    brock Repository record for Environmental assessment of Lake Gibson sediments, water quality, and soils of the Niagara Region (opens in a new tab)

  12. Incorporation of nonlinear load models and identification of the inter-area mode phenomenon in the transient energy function method

    … the 17-generator Iowa system, the 50-generator Ontario-Hydro system and the 126-generator western USA system. Both stressed and unstressed systems have been considered in testing this technique;The technique gives reasonably correct indication of the inter-area mode phenomenon.</p>

    iastate Repository record for Incorporation of nonlinear load models and identification of the inter-area mode phenomenon in the transient energy function method (opens in a new tab)

  13. Comparison Between Distance Element Method and High Speed Discriminating Method in Loss of Field Protection

    … by D.C. Lee, P. Kundur and R.D. Brown in Ontario Hydro. It uses generator field voltage and terminal voltage as inputs. Once the field voltage reduces to a certain level, a timer starts and if the field voltage does not recover to its health level before the time relay ends, the loss of …

    sask Repository record for Comparison Between Distance Element Method and High Speed Discriminating Method in Loss of Field Protection (opens in a new tab) Embargoed until 2027-01-30

  14. Identifying Prioritized Areas for Grassed Waterways Implementation

    Soil erosion remains a primary challenge in the 21st century threatening fresh water and cropland that supports more than 95% of global food production. It is of significance to plan for and prevent soil erosion in its initial stages rather than labor intensive repairing later. The Middle Thames …

    waterloo Repository record for Identifying Prioritized Areas for Grassed Waterways Implementation (opens in a new tab)

  15. The Ontario Experiment: Hydroelectricity, Public Ownership, and Transnational Progressivism, 1906-1939

    The Hydro-Electric Power Commission of Ontario (HEPCO) has been studied as a major factor in the province’s economic development and domestic politics, but its central place in international policy debates has been less recognized. This dissertation argues that the HEPCO should be understood within …

    guelph Repository record for The Ontario Experiment: Hydroelectricity, Public Ownership, and Transnational Progressivism, 1906-1939 (opens in a new tab)

  16. GREY TO GREEN 13 GATES TO THE GREENBELT

    The Greenbelt was created by the Government of Ontario in 2005 to protect working farms, wetlands, natural habitats, woods and river valleys that surround the Greater Toronto Area (GTA). Its vast 8000 square kilometers connects the Niagara escarpments in the west with the Oak Ridges Moraine in the …

    waterloo Repository record for GREY TO GREEN 13 GATES TO THE GREENBELT (opens in a new tab)